Programs
| Program | Projects | Planning | Design | Construction | City's last edit |
|---|---|---|---|---|---|
| Capital improvement projects | 406 | 104 | 218 | 84 | Sep 27, 2026 |
| Vision Zero safety | 77 | 41 | 21 | 15 | Jun 30, 2026 |
| Sidewalks | 380 | 329 | 29 | 22 | Jun 10, 2026 |
| Traffic calming | 126 | 77 | 49 | 0 | Jun 1, 2026 |
| Parks and greenways | 12 | 2 | 8 | 2 | Sep 18, 2026 |
| Housing bond | 18 | 0 | 8 | 10 | Sep 16, 2026 |
A program is flagged when the City has not edited its list in over 6 months, since its statuses may then be behind.
Projects
Showing 1,019 of 1,019 projects.
The filters, the selected project and the map's view are kept in the address bar, so this link opens the same view: /capital-projects
Drag to pan, and scroll or pinch to zoom. With the map focused, the arrow keys pan, + and - zoom, and 0 resets.
Tap or click a dot for its project. A dot is the project's point, the middle of its street or the centre of its site. Every project on the map is also in the table below, along with 27 that lie outside the map and 18 the City publishes no location for.
| Project | Program | Status | District | Department | Manager | Money committed |
|---|---|---|---|---|---|---|
| 2021 Zebulon Waterline Lining | Capital improvement projects | Construction | not published by the City | Raleigh Water | Justin Biegler | not published by the City |
| 2024 Pipe Rehabilitation | Capital improvement projects | Construction | C (inferred) | Stormwater | Claudia White | not published by the City |
| Aerial Crossing Replacements FY16 | Capital improvement projects | Construction | not published by the City | Raleigh Water | Justin Biegler | not published by the City |
| Aerial Crossing Replacements FY17- (South State St., Banbury Rd., Woodrow St.) | Capital improvement projects | Construction | C (inferred) | Raleigh Water | Justin Biegler | not published by the City |
| Ashland Street Drainage Improvements | Capital improvement projects | Construction | E (inferred) | Stormwater | not published by the City | not published by the City |
| Atkins & Canterbury Waterline Replacement | Capital improvement projects | Construction | D (inferred) | Raleigh Water | Justin Biegler | not published by the City |
| Atlantic Avenue Multimodal Widening | Capital improvement projects | Construction | A (inferred) | Transportation | Nabil Hasan | not published by the City |
| Baileywick Park Improvements | Capital improvement projects | Construction | A (inferred) | Parks, Recreation & Cultural Resources | Lora Greco, PLA, ASLA | not published by the City |
| Barwell Road South Multimodal Widening | Capital improvement projects | Construction | not published by the City | Transportation | Jaykumar Shah | not published by the City |
| Bells Valley Stream Stabilization | Capital improvement projects | Construction | E (inferred) | Stormwater | not published by the City | not published by the City |
| Big Branch Interceptor Improvements | Capital improvement projects | Construction | E (inferred) | Raleigh Water | Matt Cotton | not published by the City |
| Blue Ridge Rd & Bridge Bike/Ped | Capital improvement projects | Construction | D (inferred) | Transportation | Sam Brewer | not published by the City |
| Blue Ridge Road | Capital improvement projects | Construction | E (inferred) | Raleigh Water | Janeen Goodwin | not published by the City |
| Blue Ridge Road Multimodal Widening | Capital improvement projects | Construction | E (inferred) | Transportation | Sam Brewer | not published by the City |
| Blue Ridge Road Pedestrian Bike Bridge | Capital improvement projects | Construction | D (inferred) | Raleigh Water | Breanne Wood | not published by the City |
| Brier Creek Pump Station Upgrades | Capital improvement projects | Construction | not published by the City | Raleigh Water | Dan Williams | not published by the City |
| BRT - New Bern Avenue Improvements | Capital improvement projects | Construction | C (inferred) | Transportation | Aya Aldais | not published by the City |
| Capital Blvd Sidewalks | Capital improvement projects | Construction | A (inferred) | Transportation | Jay shah | not published by the City |
| Carolina Pines Avenue Multimodal Widening | Capital improvement projects | Construction | D (inferred) | Transportation | Lichuan Wang | not published by the City |
| Crabtree Creek Improvements at Raleigh Blvd | Capital improvement projects | Construction | C (inferred) | Parks, Recreation & Cultural Resources | David P Bender | not published by the City |
| Crabtree Creek West Trail | Capital improvement projects | Construction | not published by the City | Parks, Recreation & Cultural Resources | Lisa Schiffbauer | not published by the City |
| DEB 532Z 6 MGD Pump | Capital improvement projects | Construction | not published by the City | Raleigh Water | Dan Williams | not published by the City |
| DEB WTP Warehouse | Capital improvement projects | Construction | not published by the City | Raleigh Water | Vinod Korategere | not published by the City |
| Dix Park Plaza Play | Capital improvement projects | Construction | D (inferred) | Parks, Recreation & Cultural Resources | Grayson Maughan | not published by the City |
| Durant Nature Preserve Stream Restoration | Capital improvement projects | Construction | B (inferred) | Stormwater | Kyle Bucher | not published by the City |
| Durant Road Grade Separation | Capital improvement projects | Construction | B (inferred) | Raleigh Water | Matt Cotton | not published by the City |
| E Millbrook Rd Sidewalk | Capital improvement projects | Construction | B (inferred) | Transportation | Jay Shah | not published by the City |
| EMJ Drinking Water Lab | Capital improvement projects | Construction | not published by the City | Raleigh Water | Courtney Licata | not published by the City |
| EMJ WTP Generator Expansion Phase 2 | Capital improvement projects | Construction | B (inferred) | Raleigh Water | Vinod Korategere | not published by the City |
| EMJWTP North South Basin Rehabilitation | Capital improvement projects | Construction | B (inferred) | Raleigh Water | Ed Stempien | not published by the City |
| Filter Media Maintenance | Capital improvement projects | Construction | B (inferred) | Raleigh Water | Ed Stempien | not published by the City |
| Fire Station 26 Asphalt/Concrete Repair and Replacement | Capital improvement projects | Construction | C (inferred) | Fire | Alex Shapiro | not published by the City |
| Flocc & Sed Basins 1-4 | Capital improvement projects | Construction | B (inferred) | Raleigh Water | Ed Stempien | not published by the City |
| Fluoride and Sodium Hypochlorite Tank Replacement DEB and EMJ | Capital improvement projects | Construction | not published by the City | Raleigh Water | Courtney Licata | not published by the City |
| Galvanized Service Replacement Contract 1 | Capital improvement projects | Construction | B (inferred) | Raleigh Water | Todd Toler | not published by the City |
| Galvanized Service Replacement Contract 2 | Capital improvement projects | Construction | B (inferred) | Raleigh Water | Todd Toler | not published by the City |
| Glen Eden Playground | Capital improvement projects | Construction | E (inferred) | Parks, Recreation & Cultural Resources | not published by the City | not published by the City |
| Glenbrook/Dacian Stormwater Improvements | Capital improvement projects | Construction | C (inferred) | Stormwater | Todd Rall | not published by the City |
| Glenwood - Lane Signal | Capital improvement projects | Construction | D (inferred) | Transportation | not published by the City | not published by the City |
| John Chavis Memorial Park Improvements | Capital improvement projects | Construction | C (inferred) | Parks, Recreation & Cultural Resources | David P Bender (PRCR) Jacob Ray (RDC) | not published by the City |
| Keeter Training Center Paving Replacement | Capital improvement projects | Construction | D (inferred) | Fire | Alexander Shapiro | not published by the City |
| Lake Boone Trail Safety Improvements | Capital improvement projects | Construction | E (inferred) | Transportation | Keith Tew | not published by the City |
| Lake Wheeler Road - North | Capital improvement projects | Construction | D (inferred) | Transportation | Riska Dees | not published by the City |
| Laurel Hills Community Center Renovation | Capital improvement projects | Construction | E (inferred) | Parks, Recreation & Cultural Resources | David Delcambre | not published by the City |
| Laurel Manor Court | Capital improvement projects | Construction | E (inferred) | Stormwater | Todd Rall | not published by the City |
| Law Enforcement Training Center | Capital improvement projects | Construction | not published by the City | Police | Bill Black | not published by the City |
| Ligon Mill Road Bridge at Smith Creek | Capital improvement projects | Construction | not published by the City | Raleigh Water | Breanne Wood | not published by the City |
| Manhole Rehab/ CIPP liner from pole camera | Capital improvement projects | Construction | not published by the City | Raleigh Water | Unknown | not published by the City |
| Maywood Ave Sidewalks | Capital improvement projects | Construction | D (inferred) | Transportation | Jay Shah | not published by the City |
| Navaho Drive Sidewalk | Capital improvement projects | Construction | A (inferred) | Transportation | Benjamin Possiel | not published by the City |
| NCDOT U-5748 Louisburg Rd/Ligon Mill (AECOM) | Capital improvement projects | Construction | not published by the City | Raleigh Water | Todd Toler | not published by the City |
| NCDOT-B-5326 Raynor Rd. over White Oak Creek | Capital improvement projects | Construction | not published by the City | Raleigh Water | Todd Toler | not published by the City |
| New Hope Rd Sidewalks | Capital improvement projects | Construction | B (inferred) | Transportation | Jay Shah | not published by the City |
| NRRRF Anaerobic Digesters THP CHP | Capital improvement projects | Construction | not published by the City | Raleigh Water | Ed Stempien | not published by the City |
| NRRRF Caustic Feed Facility | Capital improvement projects | Construction | not published by the City | Raleigh Water | Kristen Pierce | not published by the City |
| Nutrient Mitigation Banking Instrument | Capital improvement projects | Construction | not published by the City | Raleigh Water | Matt Cotton | not published by the City |
| Oberlin Road Streetscape | Capital improvement projects | Construction | D (inferred) | Transportation | Jaykumar Shah | not published by the City |
| Ortho-Phosphate Building | Capital improvement projects | Construction | B (inferred) | Raleigh Water | Matt Cotton | not published by the City |
| Orthophosphate Storage & Feed (EMJ & DEB) & CO at DEB | Capital improvement projects | Construction | not published by the City | Raleigh Water | Matt Cotton | not published by the City |
| Oxford Road Sidewalk Project | Capital improvement projects | Construction | E (inferred) | Transportation | Diana Deadmore | not published by the City |
| Poole Road Widening | Capital improvement projects | Construction | not published by the City | Transportation | Sylvester Percival | not published by the City |
| Priority 1 Pump Station Upgrades | Capital improvement projects | Construction | not published by the City | Raleigh Water | Justin Biegler | not published by the City |
| River Towne Offisite Utilities | Capital improvement projects | Construction | not published by the City | Raleigh Water | Justin Biegler | not published by the City |
| SCADA Upgrade | Capital improvement projects | Construction | not published by the City | Raleigh Water | Perry Allen | not published by the City |
| Scotland Street Sidewalk | Capital improvement projects | Construction | E (inferred) | Transportation | Mukund Moghe | not published by the City |
| Shelley Lake Comfort Station | Capital improvement projects | Construction | A (inferred) | Parks, Recreation & Cultural Resources | Carlos Reyes | not published by the City |
| Sludge Debris Drying Beds | Capital improvement projects | Construction | not published by the City | Raleigh Water | Ed Stempien | not published by the City |
| Smith Creek WWTP Influent Screening, Pumping, and Grit Removal Impvs. | Capital improvement projects | Construction | not published by the City | Raleigh Water | Janeen Goodwin | not published by the City |
| Spring Forest Rd Sidewalks | Capital improvement projects | Construction | A (inferred) | Transportation | jay Shah | not published by the City |
| Spring Park Playground Renovation | Capital improvement projects | Construction | D (inferred) | Parks, Recreation & Cultural Resources | not published by the City | not published by the City |
| State Street Basin Sanitary Sewer and Water Improvements Phase 3A | Capital improvement projects | Construction | C (inferred) | Raleigh Water | Todd Toler | not published by the City |
| State Street Water and Sewer Improvements Phase 1 | Capital improvement projects | Construction | C (inferred) | Raleigh Water | Todd Toler | not published by the City |
| Summerton Drive Drainage Improvements - DA | Capital improvement projects | Construction | B (inferred) | Stormwater | not published by the City | not published by the City |
| Trenton Road Connector Project | Capital improvement projects | Construction | D (inferred) | Parks, Recreation & Cultural Resources | not published by the City | not published by the City |
| Upper Pigeon House Interceptor Improvements from Wade to Wake Forest Rd. | Capital improvement projects | Construction | C (inferred) | Raleigh Water | Todd Toler | not published by the City |
| Upper Walnut Creek Interceptor Rehabilitation | Capital improvement projects | Construction | C (inferred) | Raleigh Water | Ed Stempien | not published by the City |
| Upper West Neuse Interceptor | Capital improvement projects | Construction | B (inferred) | Raleigh Water | Julie Parham | not published by the City |
| US 70 / Westgate Waterline | Capital improvement projects | Construction | E (inferred) | Raleigh Water | Kristen Pierce | not published by the City |
| Vandora Springs Rd. Improvements | Capital improvement projects | Construction | not published by the City | Raleigh Water | Janeen Goodwin | not published by the City |
| Wade Ave Sidewalks | Capital improvement projects | Construction | D (inferred) | Transportation | Jaykumar Shah | not published by the City |
| Wake Forest Rd Sidewalk | Capital improvement projects | Construction | E (inferred) | Transportation | Jaykumar Shah | not published by the City |
| Water Tank Rehabilitation and Maintenance Contract | Capital improvement projects | Construction | B (inferred) | Raleigh Water | Julie Parham | not published by the City |
| Wooten Meadow Park | Capital improvement projects | Construction | E (inferred) | Parks, Recreation & Cultural Resources | Gary Claiborne | not published by the City |
| Worthdale Park Stream Restoration and Stormwater Improvements | Capital improvement projects | Construction | C (inferred) | Stormwater | not published by the City | not published by the City |
| Blount St (Go Raleigh Station/Moore Square)Install RRFBs and install flexible delineators to enforce "No Parking" areas. | Vision Zero safety | ConstructionCity: Under Construction | C | not published by the City | not published by the City | not published by the City |
| Blount-BraggInstall RRFBs and a new midblock crosswalk across Blount St. | Vision Zero safety | ConstructionCity: Under Construction | C | not published by the City | not published by the City | not published by the City |
| Bragg - PersonInstall RRFBs and a new midblock crosswalk across Person St. | Vision Zero safety | ConstructionCity: Under Construction | C | not published by the City | not published by the City | not published by the City |
| Collonade Center - Forum - Six ForksFY 2024 Signal Upgrades: Install Accessible Pedestrian Signals. Install 4 new Bimodal Flashing Yellow Arrow left turn signals and 4 new 3-section signals. | Vision Zero safety | ConstructionCity: Under Construction | A | not published by the City | not published by the City | not published by the City |
| Common Oaks - Forest PinesConvert intersection to All Way stop. | Vision Zero safety | ConstructionCity: Under Construction | B | not published by the City | not published by the City | not published by the City |
| Creedmoor - Edwards Mill - Mill Village - ParklakeFY 2024 Signal Upgrades: Install Accessible Pedestrian Signals and program Leading Pedestrian Interval. Install high-visibility crosswalk across Mill Village. | Vision Zero safety | ConstructionCity: Under Construction | E | not published by the City | not published by the City | not published by the City |
| Glenwood & LaneSignalize intersection. | Vision Zero safety | ConstructionCity: Under Construction | D | not published by the City | not published by the City | not published by the City |
| Gorman - MarcomFY 2024 Signal Upgrades: Install Accessible Pedestrian Signals and program Leading Pedestrian Interval | Vision Zero safety | ConstructionCity: Under Construction | D | not published by the City | not published by the City | not published by the City |
| HAWK at Lead Mine - ShadysideFY 2024 Signal Upgrades: Install Accessible Pedestrian Signals. | Vision Zero safety | ConstructionCity: Under Construction | A | not published by the City | not published by the City | not published by the City |
| Hilburn Drive Academy FrontageReconfigure lanes and shorten crosswalk or alternative treatment at crosswalk. | Vision Zero safety | ConstructionCity: Under Construction | E | not published by the City | not published by the City | not published by the City |
| Navaho - Wake ForestFY 2024 Signal Upgrades: Install pedestrian signals. Install 2 flashing yellow arrow 4-section left turn signals. Install 2 new 3-section signals. Install 2 detection loops. | Vision Zero safety | ConstructionCity: Under Construction | A | not published by the City | not published by the City | not published by the City |
| Oberlin Rd (Oberlin Middle Driveway)Install RRFBs at existing midblock crosswalk. | Vision Zero safety | ConstructionCity: Under Construction | E | not published by the City | not published by the City | not published by the City |
| Old Wake Forest Rd, east of intersection with Falls of Neuse / Wake ForestInstall signal ahead sign, curve warning sign, and straighten new Chevrons. | Vision Zero safety | ConstructionCity: Under Construction | A | not published by the City | not published by the City | not published by the City |
| Ridge - RidgecrestInstall RRFBs. | Vision Zero safety | ConstructionCity: Under Construction | E | not published by the City | not published by the City | not published by the City |
| Wilmington St (Shaw)Install RRFBs at existing midblock crosswalk. | Vision Zero safety | ConstructionCity: Under Construction | C | not published by the City | not published by the City | not published by the City |
| ATLANTIC AVE from OLD LOUISBURG RD to NEW HOPE CHURCH RDMajor Street Improvement | Sidewalks | ConstructionCity: UNDER CONSTRUCTION | A (inferred) | not published by the City | not published by the City | not published by the City |
| BLUE RIDGE RD from BERYL to FABER DRSidewalk Only | Sidewalks | ConstructionCity: UNDER CONSTRUCTION | D (inferred) | not published by the City | not published by the City | not published by the City |
| BLUE RIDGE RD from HILLSBOROUGH ST to TRINITY RDMajor Street Improvement | Sidewalks | ConstructionCity: UNDER CONSTRUCTION | not published by the City | not published by the City | not published by the City | not published by the City |
| BLUE RIDGE RD from Homewood Banks Dr to GLENWOODMajor Street Improvement | Sidewalks | ConstructionCity: UNDER CONSTRUCTION | E (inferred) | not published by the City | not published by the City | not published by the City |
| BLUE RIDGE RD from TRINITY RD to WILLIAM MOORE DRMajor Street Improvement | Sidewalks | ConstructionCity: UNDER CONSTRUCTION | not published by the City | not published by the City | not published by the City | not published by the City |
| BLUE RIDGE RD from WILLIAM MOORE DR to DISTRICT DRMajor Street Improvement | Sidewalks | ConstructionCity: UNDER CONSTRUCTION | D (inferred) | not published by the City | not published by the City | not published by the City |
| CAPITAL BLVD from I-440 to BRENTWOODNOT DUPLICATE OF 110 | Sidewalks | ConstructionCity: UNDER CONSTRUCTION | A (inferred) | not published by the City | not published by the City | not published by the City |
| CAPITAL BLVD from I-440 to BRENTWOODSidewalk Only | Sidewalks | ConstructionCity: UNDER CONSTRUCTION | C (inferred) | not published by the City | not published by the City | not published by the City |
| CAROLINA PINES AVE from S SAUNDERS ST to LAKE WHEELER RDMajor Street Improvement | Sidewalks | ConstructionCity: UNDER CONSTRUCTION | D (inferred) | not published by the City | not published by the City | not published by the City |
| DIXIE FOREST RD from LITCHFORD RD to SPRING FOREST RDCurb and Gutter | Sidewalks | ConstructionCity: UNDER CONSTRUCTION | A (inferred) | not published by the City | not published by the City | not published by the City |
| E MILLBROOK from ATLANTIC to WALLINGFORDRAIL GRADE SEPARATION | Sidewalks | ConstructionCity: UNDER CONSTRUCTION | A (inferred) | not published by the City | not published by the City | not published by the City |
| HILLSBOROUGH ST from BLUE RIDGE RD to CHAPEL HILL RDMajor Street Improvement | Sidewalks | ConstructionCity: UNDER CONSTRUCTION | E (inferred) | not published by the City | not published by the City | not published by the City |
| MAYWOOD from LAKE WHEELER RD to SAUNDERSSidewalk Only | Sidewalks | ConstructionCity: UNDER CONSTRUCTION | D (inferred) | not published by the City | not published by the City | not published by the City |
| N NEW HOPE RD from CAPITAL BLVD to ATLANTICSidewalk Only | Sidewalks | ConstructionCity: UNDER CONSTRUCTION | A (inferred) | not published by the City | not published by the City | not published by the City |
| N NEW HOPE RD from CAPITAL BLVD to WALLINGFORD DRSidewalk Only | Sidewalks | ConstructionCity: UNDER CONSTRUCTION | B (inferred) | not published by the City | not published by the City | not published by the City |
| NEW BERN AVE from ST AUGUSTINE AVE to SUNNYBROOK RDMajor Street Improvement | Sidewalks | ConstructionCity: UNDER CONSTRUCTION | C (inferred) | not published by the City | not published by the City | not published by the City |
| OLD WAKE FOREST from LITCHFORD to RURITANIAMajor Street Improvement | Sidewalks | ConstructionCity: UNDER CONSTRUCTION | A (inferred) | not published by the City | not published by the City | not published by the City |
| SCOTLAND from BEAUFORT to LASSITER MILLCurb and Gutter | Sidewalks | ConstructionCity: UNDER CONSTRUCTION | E (inferred) | not published by the City | not published by the City | not published by the City |
| SPRING FOREST from MACHINES to CAPITALMajor Street Improvement | Sidewalks | ConstructionCity: UNDER CONSTRUCTION | B (inferred) | not published by the City | not published by the City | not published by the City |
| WADE AVE from HOBSON to DANIELS | Sidewalks | ConstructionCity: UNDER CONSTRUCTION | E (inferred) | not published by the City | not published by the City | not published by the City |
| WAKE FOREST RD from HODGES to WHITAKER MILL RDSidewalk Only | Sidewalks | ConstructionCity: UNDER CONSTRUCTION | E (inferred) | not published by the City | not published by the City | not published by the City |
| WESTERN BLVD from BLUE RIDGE RD to CHANEY RDMajor Street Improvement | Sidewalks | ConstructionCity: UNDER CONSTRUCTION | D (inferred) | not published by the City | not published by the City | not published by the City |
| Crabree Creek at Lassiter MillTrail Improvements between Lassiter Mill Rd and Hertford St | Parks and greenways | Construction | E (inferred) | PRCR Greenways | Lexi Yates/ Noah Otto | not published by the City |
| Structure ReplacementsDecking replacement of Structures 102 and 103, 17, 6 and 7 | Parks and greenways | Construction | A (inferred) | PRCR Greenways | Mark Heinicke | not published by the City |
| Barton Oaks (Fka Strickland Apartments)LIHTC Gap Financing | Housing bond | ConstructionCity: Under Construction | E | not published by the City | not published by the City | $3,600,000 |
| Biltmore HillsPublic Private Partnerships | Housing bond | ConstructionCity: Under Construction | C | not published by the City | not published by the City | $1,440,000 |
| Burrell Lofts (fka Hoke Street Apartments)LIHTC Gap Financing | Housing bond | ConstructionCity: Under Construction | C | not published by the City | not published by the City | $1,587,500 |
| Cottages of IdlewildPublic Private Partnerships | Housing bond | ConstructionCity: Under Construction | C | not published by the City | not published by the City | $560,000 |
| Healing Transitions Forward TogetherPublic Private Partnerships | Housing bond | ConstructionCity: Under Construction | E | not published by the City | not published by the City | $2,200,000 |
| Iris RidgePublic Private Partnerships | Housing bond | ConstructionCity: Under Construction | C | not published by the City | not published by the City | $260,883 |
| Lake HavenLIHTC Gap Financing | Housing bond | ConstructionCity: Under Construction | C | not published by the City | not published by the City | $950,000 |
| Maple RidgeLIHTC Gap Financing | Housing bond | ConstructionCity: Under Construction | C | not published by the City | not published by the City | $1,550,000 |
| Parkside ApartmentsLIHTC Gap Financing | Housing bond | ConstructionCity: Under Construction | D | not published by the City | not published by the City | $4,800,000 |
| South East Raleigh Promise Small-Scale ProjectPublic Private Partnerships | Housing bond | ConstructionCity: Under Construction | not published by the City | not published by the City | not published by the City | $3,300,000 |
| not published by the City | Capital improvement projects | Design | A (inferred) | not published by the City | not published by the City | not published by the City |
| 1000 Gregg St. Bioretention | Capital improvement projects | DesignCity: Pre-construction | C (inferred) | Stormwater | not published by the City | not published by the City |
| 1713 Crest St Bioretention | Capital improvement projects | DesignCity: Pre-construction | D (inferred) | Stormwater | not published by the City | not published by the City |
| 2015 Water Main Replacement Package 4 | Capital improvement projects | Design | E (inferred) | Raleigh Water | Kevin Braxton | not published by the City |
| 2024 Pump Station Generator Replacement | Capital improvement projects | Design | C (inferred) | Raleigh Water | Vinod Korategere | not published by the City |
| 36" Water Transmission Main Assessment | Capital improvement projects | Design | not published by the City | Raleigh Water | Breanne Wood | not published by the City |
| 717 E. Martin St. Bioretention | Capital improvement projects | DesignCity: Pre-construction | C (inferred) | Stormwater | not published by the City | not published by the City |
| Aberdeen Drive Street and Sidewalk Improvement Petition | Capital improvement projects | Design | C (inferred) | Transportation | Lichuan Wang | not published by the City |
| Alamance Drive Drainage Improvements | Capital improvement projects | Design | E (inferred) | Stormwater | not published by the City | not published by the City |
| Ashe Ave Pedestrian Hybrid Beacon | Capital improvement projects | Design | D (inferred) | Transportation | not published by the City | not published by the City |
| Atlantic - Whitaker Mill Improvements | Capital improvement projects | Design | C (inferred) | Transportation | not published by the City | not published by the City |
| Atlantic Avenue Multi-Use Path | Capital improvement projects | Design | C (inferred) | Transportation | Monique Gyant | not published by the City |
| Automotive Way Roundabout | Capital improvement projects | Design | C (inferred) | Raleigh Water | Julie Parham | not published by the City |
| Avent Ferry Road Improvements - Part of Group 8 Sidewalk projects | Capital improvement projects | Design | D (inferred) | Transportation | Stephane Belinga | not published by the City |
| Barwell Road Widening | Capital improvement projects | Design | not published by the City | Raleigh Water | Breanne Wood | not published by the City |
| Battle Ridge Comminty to Neuse River Trail | Capital improvement projects | Design | C (inferred) | Parks, Recreation & Cultural Resources | not published by the City | not published by the City |
| Battle Ridge North to Neuse Trail | Capital improvement projects | Design | C (inferred) | Parks, Recreation & Cultural Resources | not published by the City | not published by the City |
| Battleford Drive Drainage Improvements | Capital improvement projects | Design | A (inferred) | Stormwater | not published by the City | not published by the City |
| Bayfield Drive Drainage Improvements - DA | Capital improvement projects | Design | D (inferred) | Stormwater | not published by the City | not published by the City |
| Beaver Dam Road Drainage Improvements - DA | Capital improvement projects | Design | D (inferred) | Stormwater | not published by the City | not published by the City |
| Bellevue Rd Traffic Calming | Capital improvement projects | Design | E (inferred) | Transportation | not published by the City | not published by the City |
| Biltmore Hills Tennis Center Expansion | Capital improvement projects | Design | C (inferred) | Parks, Recreation & Cultural Resources | not published by the City | not published by the City |
| Biltmore Hills Water Main Replacement | Capital improvement projects | DesignCity: Right of Way Acquisition | C (inferred) | Raleigh Water | Courtney Licata | not published by the City |
| Bilyeu St. & Main Campus Drive 24" Transmission Main | Capital improvement projects | Design | D (inferred) | Raleigh Water | Justin Biegler | not published by the City |
| BioEnergy Sidestream Treatment Process | Capital improvement projects | Design | not published by the City | Raleigh Water | Ed Stempien | not published by the City |
| Blenheim Stream Relocation and Storm Sewer Replacement | Capital improvement projects | Design | E (inferred) | Raleigh Water | Louis Bennett | not published by the City |
| Blount/Person St - Two-Way Conversion | Capital improvement projects | Design | C (inferred) | Transportation | Lichuan Wang | not published by the City |
| Blue Ridge Road Multimodal Widening North | Capital improvement projects | Design | E (inferred) | Transportation | Nabil Hasan | not published by the City |
| Branblewood Dr (6208) DA | Capital improvement projects | Design | A (inferred) | Stormwater | not published by the City | not published by the City |
| Bridge Replacement - Cheswick Drive and Shelley Road | Capital improvement projects | Design | A (inferred) | Transportation | Sylvester Percival | not published by the City |
| Bridge Structure #88 Replacement Project | Capital improvement projects | Design | C (inferred) | Parks, Recreation & Cultural Resources | not published by the City | not published by the City |
| Bridgeport Dr - W Traffic Calming | Capital improvement projects | Design | A (inferred) | Transportation | not published by the City | not published by the City |
| Brighton Road Sidewalk Petition | Capital improvement projects | Design | C (inferred) | Transportation | Sam Brewer | not published by the City |
| Brookhaven Drive Sidewalk | Capital improvement projects | Design | E (inferred) | Transportation | Lichuan Wang | not published by the City |
| Brookside Drive Stream Repair - DA | Capital improvement projects | Design | C (inferred) | Stormwater | not published by the City | not published by the City |
| Buffaloe/New Hope Signal Improvement | Capital improvement projects | Design | not published by the City | Transportation | not published by the City | not published by the City |
| Bunker Hill Dr Traffic Calming | Capital improvement projects | Design | C (inferred) | Transportation | not published by the City | not published by the City |
| Cambridge Woods Way Drainage Improvements | Capital improvement projects | Design | E (inferred) | Stormwater | not published by the City | not published by the City |
| Camp Pond Dam Reconstruction Project**** | Capital improvement projects | Design | D (inferred) | Stormwater | not published by the City | not published by the City |
| Capital/Calvary Safety Improvements | Capital improvement projects | Design | A (inferred) | Transportation | not published by the City | not published by the City |
| Carolina Pines Ave. Sewer replacement | Capital improvement projects | Design | D (inferred) | Raleigh Water | Breanne Wood | not published by the City |
| Cobblestone Court Sidewalk Petition | Capital improvement projects | Design | E (inferred) | Transportation | Lichuan Wang | not published by the City |
| College Street EST | Capital improvement projects | Design | not published by the City | Raleigh Water | Julie Parham | not published by the City |
| Colleton Road Sidewalk Petition | Capital improvement projects | Design | C (inferred) | Transportation | Jaykumar Shah | not published by the City |
| Crabtree Creek Trail Improvements at Lassiter Mill Road | Capital improvement projects | Design | E (inferred) | Parks, Recreation & Cultural Resources | not published by the City | not published by the City |
| Crabtree Creek Trail to Sunnybrook Park Greenway Connector | Capital improvement projects | Design | C (inferred) | Parks, Recreation & Cultural Resources | not published by the City | not published by the City |
| Crabtree Southbank - 42" Interceptor Improvements | Capital improvement projects | Design | C (inferred) | Raleigh Water | Ed Stempien | not published by the City |
| Crabtree Valley Sewer Extension/Replacement | Capital improvement projects | DesignCity: Right of Way Acquisition | E (inferred) | Raleigh Water | Matt Cotton | not published by the City |
| Cross Link Rd separated bikeway | Capital improvement projects | Design | C (inferred) | Transportation | not published by the City | not published by the City |
| Dana Drive/ Walnut Creek Floodplain Evaluation Project | Capital improvement projects | Design | D (inferred) | Stormwater | not published by the City | not published by the City |
| Deblyn Ave Traffic Calming | Capital improvement projects | Design | E (inferred) | Transportation | not published by the City | not published by the City |
| Dixie Trail Streambank Stabilization - DA | Capital improvement projects | Design | D (inferred) | Stormwater | not published by the City | not published by the City |
| Donald Ross Dr Bikeway | Capital improvement projects | Design | C (inferred) | Transportation | not published by the City | not published by the City |
| Dorothea Dix Park | Capital improvement projects | Design | D (inferred) | Parks, Recreation & Cultural Resources | not published by the City | not published by the City |
| Durant Road 36" Transmission Main | Capital improvement projects | Design | B (inferred) | Raleigh Water | Matt Cotton | not published by the City |
| East Jameson Road Drainage Improvements - DA | Capital improvement projects | Design | C (inferred) | Stormwater | not published by the City | not published by the City |
| East Lane Street Drainage Improvements | Capital improvement projects | Design | C (inferred) | Stormwater | not published by the City | not published by the City |
| East Raleigh Park & Ride | Capital improvement projects | Design | C (inferred) | Transportation | Alex Shapiro | not published by the City |
| Eastgate Park Lake/Dam Rehabilitation | Capital improvement projects | Design | A (inferred) | Stormwater | not published by the City | not published by the City |
| EMJ 54 Inch Raw Water Line | Capital improvement projects | Design | not published by the City | Raleigh Water | Matt Cotton | not published by the City |
| EMJ Chemical Campus Expansion | Capital improvement projects | Design | B (inferred) | Raleigh Water | Julie Parham | not published by the City |
| EMJ PAC Silos | Capital improvement projects | Design | B (inferred) | Raleigh Water | Julie Parham | not published by the City |
| EMJ RWPS Exhaust Fan Upgrades Evaluation | Capital improvement projects | Design | not published by the City | Raleigh Water | Dan Williams | not published by the City |
| EMJ West Reservoir Rehabilitation | Capital improvement projects | Design | B (inferred) | Raleigh Water | Breanne Wood | not published by the City |
| Facility Improvements | Capital improvement projects | Design | B (inferred) | Raleigh Water | Breanne Wood | not published by the City |
| Faircloth Street Separated Bikeway | Capital improvement projects | Design | D (inferred) | Transportation | Barbara Godwin | not published by the City |
| Falls River Ave - 3 Traffic Calming | Capital improvement projects | Design | B (inferred) | Transportation | not published by the City | not published by the City |
| Falls River Ave - 3 Traffic Calming | Capital improvement projects | Design | B (inferred) | Transportation | not published by the City | not published by the City |
| Fayetteville Rd Traffic Calming | Capital improvement projects | Design | D (inferred) | Transportation | not published by the City | not published by the City |
| Fire Station 3 | Capital improvement projects | Design | C (inferred) | Fire | not published by the City | not published by the City |
| Fletcher Wetland Rehabilitation | Capital improvement projects | Design | D (inferred) | Stormwater | not published by the City | not published by the City |
| Foxtrot Road Drainage Improvements - DA | Capital improvement projects | Design | C (inferred) | Stormwater | not published by the City | not published by the City |
| Freeman Street, Postell Street, and Coleman Street Sidewalk Petition | Capital improvement projects | Design | C (inferred) | Transportation | Sam Brewer | not published by the City |
| Garner Forest Hills & Raleigh Watermain Replacement | Capital improvement projects | Design | C (inferred) | Raleigh Water | Vinod Korategere | not published by the City |
| Garner Road Pedestrian Improvements | Capital improvement projects | Design | C (inferred) | Transportation | Stephane Belinga | not published by the City |
| Generator Replacement | Capital improvement projects | Design | not published by the City | Raleigh Water | Todd Toler | not published by the City |
| Glascock St - E Traffic Calming | Capital improvement projects | Design | C (inferred) | Transportation | not published by the City | not published by the City |
| Glenbrook Area Flood Hazard Reduction | Capital improvement projects | Design | C (inferred) | Stormwater | not published by the City | not published by the City |
| Glenwood Ave. and Creston | Capital improvement projects | Design | E (inferred) | Stormwater | not published by the City | not published by the City |
| Glenwood Forest Dr Traffic Calming | Capital improvement projects | Design | E (inferred) | Transportation | not published by the City | not published by the City |
| GoRaleigh Operations & Maintenance Facility Expansion | Capital improvement projects | Design | C (inferred) | Transportation | Alex Shapiro | not published by the City |
| Grand Traverse Dr Traffic Calming | Capital improvement projects | Design | B (inferred) | Transportation | not published by the City | not published by the City |
| Green Rd separated bikeway | Capital improvement projects | Design | A (inferred) | Transportation | not published by the City | not published by the City |
| Guard Hill Drive Drainage Improvements | Capital improvement projects | Design | C (inferred) | Stormwater | not published by the City | not published by the City |
| Hadley Rd Traffic Calming | Capital improvement projects | Design | C (inferred) | Transportation | not published by the City | not published by the City |
| Highwoods Blvd | Capital improvement projects | Design | A (inferred) | Transportation | Diana Deadmore | not published by the City |
| Highwoods/Poplarwood New Signal | Capital improvement projects | Design | A (inferred) | Transportation | not published by the City | not published by the City |
| Hillcrest Drive Water and Sewer Extension | Capital improvement projects | Design | C (inferred) | Raleigh Water | Ed Stempien | not published by the City |
| Holden Street Drainage Improvements - DA | Capital improvement projects | Design | C (inferred) | Stormwater | not published by the City | not published by the City |
| I&I Study | Capital improvement projects | Design | not published by the City | Raleigh Water | Matt Cotton | not published by the City |
| Inglewood Lane | Capital improvement projects | DesignCity: Pre-construction | A (inferred) | Transportation | not published by the City | not published by the City |
| Kayla Court (DA) | Capital improvement projects | Design | D (inferred) | Stormwater | not published by the City | not published by the City |
| Kelway Dr Traffic Calming | Capital improvement projects | Design | B (inferred) | Transportation | not published by the City | not published by the City |
| Kent Rd Traffic Calming | Capital improvement projects | Design | D (inferred) | Transportation | not published by the City | not published by the City |
| Kent/Method/Western Traffic Signal Improvement | Capital improvement projects | Design | D (inferred) | Transportation | not published by the City | not published by the City |
| Lake Boone Trail Petitioned Street & Sidewalk Improvements | Capital improvement projects | Design | E (inferred) | Transportation | Dennis Trujillo | not published by the City |
| Lake Boone Trl to House Creek Trail | Capital improvement projects | Design | E (inferred) | Parks, Recreation & Cultural Resources | not published by the City | not published by the City |
| Lake Johnson Dam Repairs | Capital improvement projects | Design | D (inferred) | Stormwater | not published by the City | not published by the City |
| Lake Wheeler & Lake Benson Dam Improvements | Capital improvement projects | Design | not published by the City | Raleigh Water | Courtney Licata | not published by the City |
| Lake Wheeler Road Sidewalk | Capital improvement projects | Design | D (inferred) | Transportation | Eddy Mumpasi | not published by the City |
| Large Valve Replacement Contract 1 | Capital improvement projects | Design | B (inferred) | Raleigh Water | Julie Parham | not published by the City |
| Lassiter Mill Rd separated bikeway | Capital improvement projects | Design | E (inferred) | Transportation | not published by the City | not published by the City |
| Laurel Mountain Rd | Capital improvement projects | Design | A (inferred) | Transportation | not published by the City | not published by the City |
| LCRR Field Service Line Verifications | Capital improvement projects | Design | B (inferred) | Raleigh Water | Breanne Wood | not published by the City |
| Lenoir St separated bikeway | Capital improvement projects | Design | D (inferred) | Transportation | not published by the City | not published by the City |
| Levister Ct at Walnut Terrace - silva cell | Capital improvement projects | DesignCity: Pre-construction | D (inferred) | Stormwater | not published by the City | not published by the City |
| Lions Park GSI Retrofit (ARPA) | Capital improvement projects | Design | C (inferred) | Stormwater | not published by the City | not published by the City |
| Little Creek RRF Rehabilitation & Replacement | Capital improvement projects | Design | not published by the City | Raleigh Water | Breanne Wood | not published by the City |
| Lord Ashley Road Drainage Improvements | Capital improvement projects | Design | C (inferred) | Stormwater | not published by the City | not published by the City |
| Lower Longview Dam Outfall Stream Stabilization Project | Capital improvement projects | Design | C (inferred) | Stormwater | not published by the City | not published by the City |
| Lower Richland Creek Interceptor Upgrade | Capital improvement projects | Design | B (inferred) | Raleigh Water | Julie Parham | not published by the City |
| Mabry Mill - Wakefield Pines Signal | Capital improvement projects | Design | B (inferred) | Transportation | not published by the City | not published by the City |
| Marsh Creek Road | Capital improvement projects | Design | not published by the City | Transportation | Dean Fox | not published by the City |
| Maybrook Dr Traffic Calming | Capital improvement projects | Design | C (inferred) | Transportation | not published by the City | not published by the City |
| Melbourne Road Drainage Improvements - DA | Capital improvement projects | Design | D (inferred) | Stormwater | not published by the City | not published by the City |
| Method Rd separated bikeway | Capital improvement projects | Design | D (inferred) | Transportation | not published by the City | not published by the City |
| MH Rehab | Capital improvement projects | Design | not published by the City | Raleigh Water | Kristen Pierce | not published by the City |
| Midlands Townhomes Streambank Stabilization - Drainage Assistance Program | Capital improvement projects | Design | A (inferred) | Stormwater | not published by the City | not published by the City |
| Mine Creek Sewer Improvements (B&C) | Capital improvement projects | Design | A (inferred) | Raleigh Water | Todd Toler | not published by the City |
| Morgan St separated bikeway | Capital improvement projects | Design | D (inferred) | Transportation | not published by the City | not published by the City |
| Mourning Dove Road Drainage Improvements - DA | Capital improvement projects | Design | A (inferred) | Stormwater | not published by the City | not published by the City |
| N Rogers Ln separated bikeway | Capital improvement projects | Design | C (inferred) | Transportation | not published by the City | not published by the City |
| N West St Bikeway | Capital improvement projects | Design | D (inferred) | Transportation | Barbara Godwin | not published by the City |
| NCDOT-B-4654 Project - US 70 and Rte 50 | Capital improvement projects | Design | not published by the City | Raleigh Water | Todd Toler | not published by the City |
| NCDOT-I-5111 / I-4739 - I-40 to Cornwallis Rd. & NC 42 | Capital improvement projects | Design | not published by the City | Raleigh Water | Todd Toler | not published by the City |
| NCDOT-I-5708 - Wake Forest Rd. & I-440 | Capital improvement projects | Design | A (inferred) | Raleigh Water | Todd Toler | not published by the City |
| NCDOT-P-5715 New Hope Church Rd. | Capital improvement projects | Design | A (inferred) | Raleigh Water | Todd Toler | not published by the City |
| NCDOT-U-5518 - Glenwood Ave - Page Rd. to I-540 | Capital improvement projects | Design | not published by the City | Raleigh Water | Todd Toler | not published by the City |
| NCDOT-U2719 / U4437 - Walnut St. to Wade Ave. | Capital improvement projects | Design | D (inferred) | Raleigh Water | Todd Toler | not published by the City |
| NCDOT-Y-4805F Knightdale Intersections | Capital improvement projects | Design | not published by the City | Raleigh Water | Todd Toler | not published by the City |
| Neuse River EQ Basin Study | Capital improvement projects | Design | not published by the City | Raleigh Water | Breanne Wood | not published by the City |
| New Bern Ave- East of 440 Improvements | Capital improvement projects | Design | C (inferred) | Transportation | not published by the City | not published by the City |
| New Bern Avenue BRT Impvs. | Capital improvement projects | DesignCity: Right of Way Acquisition | C (inferred) | Raleigh Water | Todd Toler | not published by the City |
| Newbold Street Drainage Improvements - DA | Capital improvement projects | Design | D (inferred) | Stormwater | not published by the City | not published by the City |
| Norris Street Sidewalks | Capital improvement projects | DesignCity: Pre-construction | C (inferred) | Transportation | not published by the City | not published by the City |
| North Raleigh Sewer Extension | Capital improvement projects | Design | A (inferred) | Raleigh Water | Leticia Rieger | not published by the City |
| NRRRF BNR Basins MCC Replacement | Capital improvement projects | Design | not published by the City | Raleigh Water | Dan Williams | not published by the City |
| NRRRF Cake Storage #3 & Misc. Improvements | Capital improvement projects | Design | not published by the City | Raleigh Water | Dan Williams | not published by the City |
| NRRRF Generator Replacement Project | Capital improvement projects | Design | not published by the City | Raleigh Water | Dan Williams | not published by the City |
| NRRRF Hypo Feed Facility Rehab | Capital improvement projects | Design | not published by the City | Raleigh Water | Dan Williams | not published by the City |
| Oak Park Rd - E Traffic Calming | Capital improvement projects | Design | E (inferred) | Transportation | not published by the City | not published by the City |
| Old Wake Forest Road (North) Multimodal Widening | Capital improvement projects | Design | A (inferred) | Transportation | Sam Brewer | not published by the City |
| Old Wake Forest Widening 30-in Water Transmission Main | Capital improvement projects | Design | A (inferred) | Raleigh Water | Courtney Licata | not published by the City |
| Oxford Road Sidewalk Installation | Capital improvement projects | Design | E (inferred) | Raleigh Water | Breanne Wood | not published by the City |
| Perry Creek Outfall Replacement | Capital improvement projects | DesignCity: Right of Way Acquisition | not published by the City | Raleigh Water | Breanne Wood | not published by the City |
| Phase I: East Civic Tower | Capital improvement projects | Design | D (inferred) | General Government | Priscilla Tyree Williams | not published by the City |
| Pinecroft Drive Stream Stabilization DA | Capital improvement projects | Design | A (inferred) | Stormwater | not published by the City | not published by the City |
| Plainview Avenue Sidewalk | Capital improvement projects | DesignCity: Pre-construction | C (inferred) | Transportation | not published by the City | not published by the City |
| Pleasant Grove Church Rd | Capital improvement projects | Design | E (inferred) | Transportation | not published by the City | not published by the City |
| Poole Road 30-inch Water Transmission Main | Capital improvement projects | DesignCity: Right of Way Acquisition | not published by the City | Raleigh Water | Courtney Licata | not published by the City |
| Poole Road East Main Replacement | Capital improvement projects | Design | C (inferred) | Raleigh Water | Justin Biegler | not published by the City |
| Poole Road Pump Station and Force Main Improvements | Capital improvement projects | Design | not published by the City | Raleigh Water | Matt Cotton | not published by the City |
| Poole Road Stormwater Improvements (DA) | Capital improvement projects | Design | C (inferred) | Stormwater | not published by the City | not published by the City |
| Pope House Museum Renovations and Landscape Improvements | Capital improvement projects | Design | C (inferred) | Parks, Recreation & Cultural Resources | not published by the City | not published by the City |
| Powell Dr Traffic Calming | Capital improvement projects | Design | D (inferred) | Transportation | not published by the City | not published by the City |
| Poyner Rd Traffic Calming | Capital improvement projects | Design | E (inferred) | Transportation | not published by the City | not published by the City |
| Proctor Rd Traffic Calming | Capital improvement projects | Design | C (inferred) | Transportation | not published by the City | not published by the City |
| Pullen to Bain Reinforcing Main | Capital improvement projects | Design | D (inferred) | Raleigh Water | Justin Biegler | not published by the City |
| Quail Hollow Drive Separated Bikeway | Capital improvement projects | Design | A (inferred) | Transportation | Barbara Godwin | not published by the City |
| Quail Ridge Road Stream Stabilization - SSP | Capital improvement projects | Design | A (inferred) | Stormwater | not published by the City | not published by the City |
| Rainwater Rd - N Traffic Calming | Capital improvement projects | Design | A (inferred) | Transportation | not published by the City | not published by the City |
| Raleigh Convention Center Expansion Joint | Capital improvement projects | Design | D (inferred) | Raleigh Convention Center | not published by the City | not published by the City |
| Rand Road Waterline | Capital improvement projects | DesignCity: Right of Way Acquisition | not published by the City | Raleigh Water | Courtney Licata | not published by the City |
| Rawls Drive Sidewalk Petition | Capital improvement projects | Design | C (inferred) | Transportation | Sam Brewer | not published by the City |
| RCC Expansion Joint/ Water Intrusion | Capital improvement projects | Design | D (inferred) | Raleigh Convention Center | not published by the City | not published by the City |
| RDU Runway Rehab 30-inch FM & 16-inch waterline relocation | Capital improvement projects | Design | not published by the City | Raleigh Water | Matt Cotton | not published by the City |
| Rembert Dr Traffic Calming | Capital improvement projects | Design | E (inferred) | Transportation | not published by the City | not published by the City |
| Rembert Drive - Part B Sidewalk Petition | Capital improvement projects | Design | E (inferred) | Transportation | Lichuan Wang | not published by the City |
| Rock Creek Drive Stream Stabilization DA | Capital improvement projects | Design | E (inferred) | Stormwater | not published by the City | not published by the City |
| Rogers Branch Road Extension Waterline Impvs. | Capital improvement projects | Design | not published by the City | Raleigh Water | Janeen Goodwin | not published by the City |
| Rogers Road Grade Separation | Capital improvement projects | Design | not published by the City | Raleigh Water | Janeen Goodwin | not published by the City |
| Rose Lane Safe Access Flood Resilience Project**** | Capital improvement projects | Design | C (inferred) | Stormwater | not published by the City | not published by the City |
| Rush St separated bikeway | Capital improvement projects | Design | D (inferred) | Transportation | not published by the City | not published by the City |
| S King Charles Rd | Capital improvement projects | Design | C (inferred) | Transportation | not published by the City | not published by the City |
| Sanford Creek Interceptor | Capital improvement projects | DesignCity: Right of Way Acquisition | not published by the City | Raleigh Water | Kristen Pierce | not published by the City |
| School House - Wakefield Pines Signal | Capital improvement projects | Design | B (inferred) | Transportation | not published by the City | not published by the City |
| Seaboard Station Sanitary Sewer Evaluation and Design | Capital improvement projects | DesignCity: Right of Way Acquisition | C (inferred) | Raleigh Water | Julie Parham | not published by the City |
| Six Forks Road Corridor Improvements | Capital improvement projects | Design | A (inferred) | Transportation | Riska Dees | not published by the City |
| Six Forks Road Widening | Capital improvement projects | Design | A (inferred) | Raleigh Water | Breanne Wood | not published by the City |
| Smith Creek WWTP Process Upgrades | Capital improvement projects | Design | not published by the City | Raleigh Water | Matt Cotton | not published by the City |
| Smoky Hollow Park | Capital improvement projects | Design | D (inferred) | Raleigh Water | Julie Parham | not published by the City |
| Smoky Hollow Stream Restoration & Wetlands (Devereau Meadows Stream Restoration) | Capital improvement projects | Design | D (inferred) | Stormwater | not published by the City | not published by the City |
| Southall Rd separated bikeway | Capital improvement projects | Design | B (inferred) | Transportation | not published by the City | not published by the City |
| Spottswood Street SCM Retrofit Project | Capital improvement projects | DesignCity: Pre-construction | B (inferred) | Stormwater | not published by the City | not published by the City |
| Spring Forest Rd separated bikeway | Capital improvement projects | Design | A (inferred) | Transportation | not published by the City | not published by the City |
| St Albans Dr separated bikeway | Capital improvement projects | Design | A (inferred) | Transportation | not published by the City | not published by the City |
| ST James Church Rd | Capital improvement projects | Design | C (inferred) | Transportation | not published by the City | not published by the City |
| St Marys St Bikeway | Capital improvement projects | Design | D (inferred) | Transportation | not published by the City | not published by the City |
| Starmount Dr Traffic Calming | Capital improvement projects | Design | C (inferred) | Transportation | not published by the City | not published by the City |
| State Street water and Sewer Improvements Phase 1 | Capital improvement projects | Design | C (inferred) | Raleigh Water | Todd Toler | not published by the City |
| Steinbeck Dr Traffic Calming | Capital improvement projects | Design | A (inferred) | Transportation | not published by the City | not published by the City |
| Steinbeck Dr Traffic Calming | Capital improvement projects | Design | A (inferred) | not published by the City | not published by the City | not published by the City |
| Structure #17 Improvements | Capital improvement projects | Design | A (inferred) | Parks, Recreation & Cultural Resources | not published by the City | not published by the City |
| Structure 19 Replacement | Capital improvement projects | Design | A (inferred) | Parks, Recreation & Cultural Resources | not published by the City | not published by the City |
| Sweetbriar Drive | Capital improvement projects | Design | A (inferred) | Stormwater | not published by the City | not published by the City |
| Tarboro Rd - Rock Quarry Rd separated bikeway | Capital improvement projects | Design | C (inferred) | Transportation | not published by the City | not published by the City |
| Trawick Road - West | Capital improvement projects | Design | C (inferred) | Transportation | Dean Fox | not published by the City |
| Turf Grass Ct Traffic Calming | Capital improvement projects | Design | C (inferred) | Transportation | not published by the City | not published by the City |
| Turnbridge Drive Street Improvement Petition | Capital improvement projects | Design | E (inferred) | Transportation | Lichuan Wang | not published by the City |
| Upper Durant Wetland Conversion | Capital improvement projects | Design | B (inferred) | Stormwater | not published by the City | not published by the City |
| Upper Pigeon Project 3 St Marys Area | Capital improvement projects | Design | D (inferred) | Raleigh Water | Unknown | not published by the City |
| US 401 Fayetteville Road DOT | Capital improvement projects | Design | not published by the City | Raleigh Water | Matt Cotton | not published by the City |
| Valley Drive | Capital improvement projects | Design | A (inferred) | Transportation | Jaykumar Shah | not published by the City |
| Village District Main Replacement | Capital improvement projects | Design | D (inferred) | Raleigh Water | Justin Biegler | not published by the City |
| Wake BRT: Southern Corridor | Capital improvement projects | Design | D (inferred) | Transportation | Het Patel | not published by the City |
| Wake BRT: Western Corridor | Capital improvement projects | Design | D (inferred) | Transportation | Het Patel | not published by the City |
| Wake Forest Water main Replacements | Capital improvement projects | Design | not published by the City | Raleigh Water | Ed Stempien | not published by the City |
| Walnut Creek LS Rehabilitation | Capital improvement projects | Design | not published by the City | Raleigh Water | Julie Parham | not published by the City |
| Weldon Place (DA) | Capital improvement projects | Design | E (inferred) | Stormwater | not published by the City | not published by the City |
| West Street Extension Flood Study | Capital improvement projects | Design | D (inferred) | Stormwater | not published by the City | not published by the City |
| West Street Extension South | Capital improvement projects | Design | D (inferred) | Transportation | Sylvester Percival | not published by the City |
| Western Blvd BRT | Capital improvement projects | Design | D (inferred) | Raleigh Water | Julie Parham | not published by the City |
| White Oak Crossing Shopping Center Water Main Relocate | Capital improvement projects | Design | not published by the City | Raleigh Water | Kevin Braxton | not published by the City |
| Wide River Dr Traffic Calming | Capital improvement projects | Design | B (inferred) | Transportation | not published by the City | not published by the City |
| Wildcat Branch Sanitary Sewer Improvements | Capital improvement projects | Design | D (inferred) | Raleigh Water | Courtney Licata | not published by the City |
| Wooten Meadow Stream Restoration and Wetlands | Capital improvement projects | Design | E (inferred) | Transportation | Lichuan Wang | not published by the City |
| Wycliff Rd Traffic Calming | Capital improvement projects | Design | E (inferred) | Transportation | not published by the City | not published by the City |
| Yonkers Road Emergency Repair | Capital improvement projects | Design | C (inferred) | Stormwater | not published by the City | not published by the City |
| Atlantic - Whitaker MillInstall a pedestrian phase across Atlantic with flatwork and short stretch of sidewalk. | Vision Zero safety | DesignCity: In Design | C | not published by the City | not published by the City | not published by the City |
| Bonneville - New Hope ChurchSignal or Road Diet | Vision Zero safety | DesignCity: In Design | A | not published by the City | not published by the City | not published by the City |
| Buffaloe/New HopeInstall missing signalized crosswalk, APS, and signalize slip lane | Vision Zero safety | DesignCity: In Design | C | not published by the City | not published by the City | not published by the City |
| Calvary & CapitalSignal Upgrade: 4 Section heads for Calvary, LPI/APS, relocate crosswalks on Capital, extend median, relocate bus stops closer to intersection, install median fence | Vision Zero safety | DesignCity: In Design | A | not published by the City | not published by the City | not published by the City |
| Columbus Club - Corporation - New HopeAdd all 4 pedestrian phases, APS/LPI, additional signal heads (signalize slip lane). | Vision Zero safety | DesignCity: In Design | B | not published by the City | not published by the City | not published by the City |
| Corporate Center - LillingtonInstall RRFBs and crosswalk. | Vision Zero safety | DesignCity: In Design | D | not published by the City | not published by the City | not published by the City |
| Corporation - Lake Woodard - New HopeAdd 4-section head NB and 3-section FYAs for EB/WB. Add LPI/APS | Vision Zero safety | DesignCity: In Design | C | not published by the City | not published by the City | not published by the City |
| Crabtree - TimberInstall a crosswalk with RRFBs across Crabtree Blvd. | Vision Zero safety | DesignCity: In Design | C | not published by the City | not published by the City | not published by the City |
| Crabtree View PlaceInstall guardrail on west side of the road. | Vision Zero safety | DesignCity: In Design | E | not published by the City | not published by the City | not published by the City |
| Glenwood & WashingtonSignalize intersection. | Vision Zero safety | DesignCity: In Design | D | not published by the City | not published by the City | not published by the City |
| Gorman - Jackson - Wolf VillageInterim improvements inclduing pork chop island in place of signal | Vision Zero safety | DesignCity: In Design | D | not published by the City | not published by the City | not published by the City |
| Gorman & JacksonSignalize intersection. | Vision Zero safety | DesignCity: In Design | D | not published by the City | not published by the City | not published by the City |
| HAWK- Ashe AveRRFB conversion to HAWK | Vision Zero safety | DesignCity: In Design | D | not published by the City | not published by the City | not published by the City |
| Highwoods & PoplarwoodSignalize intersection. | Vision Zero safety | DesignCity: In Design | A | not published by the City | not published by the City | not published by the City |
| Kent/Method/WesternInstall missing signalized crosswalk, LPI, APS, backplates, and nearside signal heads | Vision Zero safety | DesignCity: In Design | D | not published by the City | not published by the City | not published by the City |
| Mabry Mills - Wakefield PinesSignalize intersection. | Vision Zero safety | DesignCity: In Design | B | not published by the City | not published by the City | not published by the City |
| MLK Improvements- Salisbury to EastPedestrian Safety Upgrades including curb ramps, high viz crosswalks, new traffic signal, and signal upgrades | Vision Zero safety | DesignCity: In Design | C | not published by the City | not published by the City | not published by the City |
| MLK Improvements- Salisbury to EastPedestrian Safety Upgrades including curb ramps, high viz crosswalks, new traffic signal, and signal upgrades | Vision Zero safety | DesignCity: In Design | C | not published by the City | not published by the City | not published by the City |
| New Bern Ave- East of 440 ImprovementsSafety Improvements along NBA at the intersections of Trawick, Corporation, New Hope, and Hedingham | Vision Zero safety | DesignCity: In Design | C | not published by the City | not published by the City | not published by the City |
| Schoolhouse - Wakefield PinesSignalize intersection. | Vision Zero safety | DesignCity: In Design | B | not published by the City | not published by the City | not published by the City |
| Wake Forest - ChestnutInstall RRFBs at existing midblock crosswalk. | Vision Zero safety | DesignCity: In Design | C | not published by the City | not published by the City | not published by the City |
| ATLANTIC AVE from CRABTREE CREEK GREENWAY to HIGHWOODS BLVDSidewalk Only | Sidewalks | Design | C (inferred) | not published by the City | not published by the City | not published by the City |
| AVENT FERRY RD from LAKE JOHNSON PARK to LAKE FERRY DRMajor Street Improvement | Sidewalks | Design | D (inferred) | not published by the City | not published by the City | not published by the City |
| BARWELL RD from ROCK QUARRY RD to NEALS CREEK DRMajor Street Improvement | Sidewalks | Design | C (inferred) | not published by the City | not published by the City | not published by the City |
| BRIER CREEK PKWY from LITTLE BRIER CREEK LN to GLENWOOD AVEMajor Street Improvement | Sidewalks | Design | E (inferred) | not published by the City | not published by the City | not published by the City |
| Brighton Rd from Millbank St to Glascock St | Sidewalks | Design | C (inferred) | not published by the City | not published by the City | not published by the City |
| BROOKSIDE DR from WAKE FOREST RD to VALE STSidewalk Only | Sidewalks | Design | C (inferred) | not published by the City | not published by the City | not published by the City |
| Burt Drive from Gorman St to Stovall Dr | Sidewalks | Design | D (inferred) | not published by the City | not published by the City | not published by the City |
| CAPITAL BLVD from CRABTREE GREENWAY VICINITY to APPLIANCE CTMajor Street Improvement | Sidewalks | Design | C (inferred) | not published by the City | not published by the City | not published by the City |
| Colleton Rd from Bertie Dr to Oakwood Ave | Sidewalks | Design | C (inferred) | not published by the City | not published by the City | not published by the City |
| FAIRCLOTH ST from HILLSBOROUGH ST to WADE AVESidewalk Only | Sidewalks | Design | D (inferred) | not published by the City | not published by the City | not published by the City |
| GLENWOOD AVE from DURALEIGH RD to LUMLEY RDMajor Street Improvement | Sidewalks | Design | E (inferred) | not published by the City | not published by the City | not published by the City |
| HIGHWOODS BLVD from CAPITAL BLVD to ATLANTIC AVESidewalk Only | Sidewalks | Design | A (inferred) | not published by the City | not published by the City | not published by the City |
| Inglewood Ln from Yadkin Dr to Manchester Dr | Sidewalks | Design | A (inferred) | not published by the City | not published by the City | not published by the City |
| LAKE BOONE TRL from EDENBURGH RD to GLENWOOD AVESidewalk Only | Sidewalks | Design | E (inferred) | not published by the City | not published by the City | not published by the City |
| LAKE WHEELER RD from S SAUNDERS ST to MAYWOOD AVEMajor Street Improvement | Sidewalks | Design | D (inferred) | not published by the City | not published by the City | not published by the City |
| MARSH CREEK RD from N NEW HOPE RD to TRAWICK RDMajor Street Improvement | Sidewalks | Design | C (inferred) | not published by the City | not published by the City | not published by the City |
| Norris St from Virginia Ave to Glascock St | Sidewalks | Design | C (inferred) | not published by the City | not published by the City | not published by the City |
| Oxford Rd from Kenmore Dr to Overbrook Dr | Sidewalks | Design | E (inferred) | not published by the City | not published by the City | not published by the City |
| Plainview Ave from Dennis Ave to Birch Arbor Cir | Sidewalks | Design | C (inferred) | not published by the City | not published by the City | not published by the City |
| Postell St, Freeman St & Coleman St from E Lenoir St to E Lenoir St | Sidewalks | Design | C (inferred) | not published by the City | not published by the City | not published by the City |
| Rawls Dr from Poole Rd to Friar Tuck Rd | Sidewalks | Design | C (inferred) | not published by the City | not published by the City | not published by the City |
| TRAWICK RD from CAPITAL BLVD to MARSH CREEK RDMajor Street Improvement | Sidewalks | Design | C (inferred) | not published by the City | not published by the City | not published by the City |
| Valley Dr from Lynn Rd to Hatherleigh Ct | Sidewalks | Design | A (inferred) | not published by the City | not published by the City | not published by the City |
| WAKE FOREST RD from LOUISBURG RD to CAPITAL BLVDMajor Street Improvement | Sidewalks | Design | C (inferred) | not published by the City | not published by the City | not published by the City |
| WAKE FOREST RD from NEW RD to WHITAKER MILL RDSidewalk Only | Sidewalks | Design | E (inferred) | not published by the City | not published by the City | not published by the City |
| WESTERN BLVD from AVENT FERRY RD to I 440Major Street Improvement | Sidewalks | Design | D (inferred) | not published by the City | not published by the City | not published by the City |
| WESTERN BLVD from CHANEY RD to GORMAN STMajor Street Improvement | Sidewalks | Design | D (inferred) | not published by the City | not published by the City | not published by the City |
| WESTERN BLVD from MERENDINO ST to HILLSBOROUGH STSidewalk Only | Sidewalks | Design | D (inferred) | not published by the City | not published by the City | not published by the City |
| WOLFPACK from WESTERN S LINE RAIL to ATLANTIC AVE | Sidewalks | Design | A (inferred) | not published by the City | not published by the City | not published by the City |
| Anderson Dr from Six Forks Rd to White Oak Rd | Traffic calming | DesignCity: Projects in Design | E (inferred) | not published by the City | not published by the City | not published by the City |
| Arnold Palmer Dr - W from Brier Club Ln to Brier Creek Pkwy | Traffic calming | DesignCity: Projects in Design | E (inferred) | not published by the City | not published by the City | not published by the City |
| Bellevue Rd from Terrace Dr to Ramblewood Dr | Traffic calming | DesignCity: Approved for Construction | E | not published by the City | not published by the City | not published by the City |
| Bragg St from Garner Rd to S State St | Traffic calming | DesignCity: Projects in Design | C | not published by the City | not published by the City | not published by the City |
| Bridgeport Dr - W from Creedmoor Rd to Abbottsbury Ct | Traffic calming | DesignCity: Approved for Construction | A | not published by the City | not published by the City | not published by the City |
| Bunker Hill Dr from Cane Garden Dr to Madeline Way | Traffic calming | DesignCity: Approved for Construction | C | not published by the City | not published by the City | not published by the City |
| Cape Charles Dr - N from Dominion Blvd to Cape Charles Dr | Traffic calming | DesignCity: Projects in Design | E | not published by the City | not published by the City | not published by the City |
| Cashew Dr from Forestville Rd to Massey Preserve Trl | Traffic calming | DesignCity: Projects in Design | B (inferred) | not published by the City | not published by the City | not published by the City |
| Clarendon Cresc from New Bern Ave to Lord Ashley Rd | Traffic calming | DesignCity: Projects in Design | C (inferred) | not published by the City | not published by the City | not published by the City |
| Deblyn Ave from Glenwood Ave to Pleasant Valley Rd | Traffic calming | DesignCity: Approved for Construction | E | not published by the City | not published by the City | not published by the City |
| Dennis Ave from Automotive Way to Mossbank Rd | Traffic calming | DesignCity: Projects in Design | C | not published by the City | not published by the City | not published by the City |
| Donald Ross Dr from Poole Rd to New Bern Ave | Traffic calming | DesignCity: Projects in Design | C | not published by the City | not published by the City | not published by the City |
| Eagle Trace Dr from Southall Rd to Linville Ridge Dr | Traffic calming | DesignCity: Projects in Design | B (inferred) | not published by the City | not published by the City | not published by the City |
| Falls River Ave - 2 from Summerton Dr to Watch Tower Ct | Traffic calming | DesignCity: Approved for Construction | B | not published by the City | not published by the City | not published by the City |
| Falls River Ave - 3 from Watch Tower Ct to Dunn Rd | Traffic calming | DesignCity: Approved for Construction | B | not published by the City | not published by the City | not published by the City |
| Falls River Ave - 5 from Bedfordtown Dr to St Pauls Sq | Traffic calming | DesignCity: Approved for Construction | B | not published by the City | not published by the City | not published by the City |
| Falls River Ave - 7 from Wide River Dr to Dunn Rd | Traffic calming | DesignCity: Approved for Construction | B | not published by the City | not published by the City | not published by the City |
| Fayetteville Rd from Martin Luther King Jr. Blvd to S Wilmington St. | Traffic calming | DesignCity: Approved for Construction | D | not published by the City | not published by the City | not published by the City |
| Glascock St - E from N King Charles Rd to Culpepper Ln | Traffic calming | DesignCity: Approved for Construction | C | not published by the City | not published by the City | not published by the City |
| Glendower Rd - S from Lynn Rd to Pleasant Grove Church Rd | Traffic calming | DesignCity: Projects in Design | E (inferred) | not published by the City | not published by the City | not published by the City |
| Glenwood Forest Dr from Glenwood Ave to Poyner Rd | Traffic calming | DesignCity: Approved for Construction | E | not published by the City | not published by the City | not published by the City |
| Grand Traverse Dr from Eagle Trace Dr to Camargo Ln | Traffic calming | DesignCity: Approved for Construction | B | not published by the City | not published by the City | not published by the City |
| Hadley Rd from Calloway Dr to Cross Link Rd | Traffic calming | DesignCity: Approved for Construction | C | not published by the City | not published by the City | not published by the City |
| Harden Rd - E from Nancy Ann Dr to Myron Dr | Traffic calming | DesignCity: Projects in Design | E | not published by the City | not published by the City | not published by the City |
| Harvest Oaks Dr from Strickland Rd to Forum Dr | Traffic calming | DesignCity: Projects in Design | A (inferred) | not published by the City | not published by the City | not published by the City |
| Hilburn Dr from Lynn Rd to Mayapple Pl | Traffic calming | DesignCity: Projects in Design | E (inferred) | not published by the City | not published by the City | not published by the City |
| Kelway Dr from Wakefield Plantation Dr to Wakefield Pine Dr | Traffic calming | DesignCity: Approved for Construction | B | not published by the City | not published by the City | not published by the City |
| Kent Rd from Western Blvd to Kaplan Dr | Traffic calming | DesignCity: Approved for Construction | D | not published by the City | not published by the City | not published by the City |
| Laurel Mountain Rd from Ray Rd to Lookout Mountain Rd | Traffic calming | DesignCity: Approved for Construction | A | not published by the City | not published by the City | not published by the City |
| Maybrook Dr from Poole Rd to End | Traffic calming | DesignCity: Approved for Construction | C | not published by the City | not published by the City | not published by the City |
| N King Charles Rd - S from New Bern Ave to Oakwood Traffic Circle | Traffic calming | DesignCity: Projects in Design | C | not published by the City | not published by the City | not published by the City |
| Oak Park Rd - E from Glenwood Ave to Connell Dr | Traffic calming | DesignCity: Approved for Construction | E | not published by the City | not published by the City | not published by the City |
| Pleasant Grove Church Rd from W Millbrook Rd to Pleasant Pines Dr | Traffic calming | DesignCity: Approved for Construction | E | not published by the City | not published by the City | not published by the City |
| Powell Dr from Western Blvd to Melbourne Rd | Traffic calming | DesignCity: Approved for Construction | D | not published by the City | not published by the City | not published by the City |
| Poyner Rd from Glenwood Forest Dr to End | Traffic calming | DesignCity: Approved for Construction | E | not published by the City | not published by the City | not published by the City |
| Proctor Rd from Rock Quarry Rd to Southgate Dr | Traffic calming | DesignCity: Approved for Construction | C | not published by the City | not published by the City | not published by the City |
| Rembert Dr from Glenwood Ave to Brookhaven Dr | Traffic calming | DesignCity: Approved for Construction | E | not published by the City | not published by the City | not published by the City |
| S King Charles Rd from New Bern Ave to Poole Rd | Traffic calming | DesignCity: Approved for Construction | C | not published by the City | not published by the City | not published by the City |
| S Pettigrew St from Pettis Pl to New Bern Ave | Traffic calming | DesignCity: Projects in Design | C | not published by the City | not published by the City | not published by the City |
| Saddle Seat Dr from Western Blvd to Bashford Rd | Traffic calming | DesignCity: Projects in Design | D | not published by the City | not published by the City | not published by the City |
| Snelling Rd from Dixon Dr to W Millbrook Rd | Traffic calming | DesignCity: Projects in Design | A | not published by the City | not published by the City | not published by the City |
| Starmount Dr from Capital Blvd to Jupiter St | Traffic calming | DesignCity: Approved for Construction | C | not published by the City | not published by the City | not published by the City |
| Steinbeck Dr from Wingate Dr to Bland Rd | Traffic calming | DesignCity: Approved for Construction | A | not published by the City | not published by the City | not published by the City |
| Trailwood Hills Dr from Tryon Rd to Lineberry Dr | Traffic calming | DesignCity: Projects in Design | D | not published by the City | not published by the City | not published by the City |
| Turf Grass Ct from N Rogers Ln to Marsh Grass Dr | Traffic calming | DesignCity: Approved for Construction | C | not published by the City | not published by the City | not published by the City |
| Volant Dr from Spring Forest Rd to Falls Church Rd | Traffic calming | DesignCity: Projects in Design | A (inferred) | not published by the City | not published by the City | not published by the City |
| Wake Towne Dr from Wake Forest Rd to End | Traffic calming | DesignCity: Projects in Design | E (inferred) | not published by the City | not published by the City | not published by the City |
| Wide River Dr from Falls River Ave to Falls of the Neuse Rd | Traffic calming | DesignCity: Approved for Construction | B | not published by the City | not published by the City | not published by the City |
| Wycliff Rd from Lake Boone Trl to Morningisde Dr | Traffic calming | DesignCity: Approved for Construction | E | not published by the City | not published by the City | not published by the City |
| Big Branch Greenway TrailConstruction of approximately 4,030' of new greenway trail along Big Branch. | Parks and greenways | Design | A (inferred) | PRCR Greenways | Dale Tiska / Kris Nikfar | not published by the City |
| Fire Station 1 | Parks and greenways | DesignCity: Early Design | D (inferred) | Engineering Services | Beth Nooe, ES/CM-PSSP, Stephanie Seeber, PA AIA | not published by the City |
| Greenway Streambank Restoration — Crabtree Creek WestRestoration of several areas of streambank between Lindsay Dr and Duraliegh Rd | Parks and greenways | Design | E (inferred) | PRCR Greenways | Noah Otto | not published by the City |
| Lake Lynn Greenway Drainage ImprovementsTrail Improvements along the west side of Lake Lynn loop | Parks and greenways | Design | E (inferred) | PRCR Greenways | Jaleel Alsarray/ Mark Heinicke | not published by the City |
| Mine Creek Greenway TrailImprovements to existing greenway trail - construction following RW resleeve and replace | Parks and greenways | Design | A (inferred) | PRCR Greenways | Lexi Yates/ Kimberly Siran | not published by the City |
| Neighborhood and Community Connections (NCC 2022) | Parks and greenways | Design | C (inferred) | PRCR Greenways | Kimerly Siran | not published by the City |
| Sunnybrook Road Park Connector (NCC 2014)Construction of approximately 3,765 lf of greenway trail, on west side of Crabtree Creek | Parks and greenways | DesignCity: Permitting | not published by the City | PRCR Greenways | Ed Stampien @ Raleigh Water/Noah Otto | not published by the City |
| Walnut Creek Greenway TrailImprovements to existing greenway trail - multiple structure replacement or widening, re-alignment of some sections | Parks and greenways | Design | C (inferred) | PRCR Greenways | Dale Tiska/ Kris Nikfar | not published by the City |
| 15 Summit AvenuePublic Private Partnerships | Housing bond | DesignCity: Pre-Construction | not published by the City | not published by the City | not published by the City | $368,573 |
| 5507/5511 Hillsborough St AcquisitionSite Acquisition | Housing bond | DesignCity: Pre-Construction | not published by the City | not published by the City | not published by the City | $2,564,736 |
| 5508 Western BlvdSite Acquisition | Housing bond | DesignCity: Pre-Construction | not published by the City | not published by the City | not published by the City | $1,526,555 |
| Duplex VillagePublic Private Partnerships | Housing bond | DesignCity: Pre-Construction | not published by the City | not published by the City | not published by the City | $2,880,000 |
| East CabarrusPublic Private Partnerships | Housing bond | DesignCity: Pre-Construction | not published by the City | not published by the City | not published by the City | $1,000,000 |
| Fisher GrovePublic Private Partnerships | Housing bond | DesignCity: Pre-Construction | C | not published by the City | not published by the City | $2,490,000 |
| Lorimer SpringPublic Private Partnerships | Housing bond | DesignCity: Pre-Construction | D | not published by the City | not published by the City | $1,125,000 |
| Zack's Grocery MartSite Acquisition | Housing bond | DesignCity: Pre-Construction | not published by the City | not published by the City | not published by the City | $2,937,509 |
| 495-Mitchell Mill Road 16" Transmission Installation (Discharge of PS) | Capital improvement projects | Planning | not published by the City | Raleigh Water | Todd Toler | not published by the City |
| 503 W Gannon Manhole Replacement | Capital improvement projects | Planning | not published by the City | Raleigh Water | Julie Parham | not published by the City |
| 6341 Wynbrook Way Sewer Extension | Capital improvement projects | Planning | A (inferred) | Raleigh Water | Julie Parham | not published by the City |
| Aversboro PS Basin Improvements Study | Capital improvement projects | Planning | not published by the City | Raleigh Water | Courtney Licata | not published by the City |
| Bain Pump Station Upgrades | Capital improvement projects | Planning | D (inferred) | Raleigh Water | Breanne Wood | not published by the City |
| Birchford Court Stormwater Improvements - DA | Capital improvement projects | Planning | C (inferred) | Stormwater | not published by the City | not published by the City |
| Braceridge Road Area Drainage Improvements | Capital improvement projects | Planning | E (inferred) | Stormwater | not published by the City | not published by the City |
| Braceridge Road Area Drainage Improvements | Capital improvement projects | PlanningCity: Not Started | E (inferred) | not published by the City | not published by the City | not published by the City |
| Brewster Drive Drainage Improvements | Capital improvement projects | Planning | D (inferred) | Stormwater | not published by the City | not published by the City |
| Bridge Repairs - Major, Century Bridge + Mountford Bridge | Capital improvement projects | PlanningCity: Pre-Approval | E (inferred) | Transportation | not published by the City | not published by the City |
| Brier Creek Outfall | Capital improvement projects | Planning | E (inferred) | Raleigh Water | Breanne Wood | not published by the City |
| Burt Drive Sidewalk | Capital improvement projects | PlanningCity: Programmed | D (inferred) | Transportation | not published by the City | not published by the City |
| Camp Pond Lake/Dam | Capital improvement projects | PlanningCity: Not Started | D (inferred) | not published by the City | not published by the City | not published by the City |
| Carnage Magnet Middle School Stream Restoration | Capital improvement projects | Planning | C (inferred) | Stormwater | not published by the City | not published by the City |
| Carolina Avenue Petitioned Street & Sidewalk Improvements | Capital improvement projects | PlanningCity: Programmed | D (inferred) | Transportation | not published by the City | not published by the City |
| Carolina Pines Water Quality Improvements | Capital improvement projects | PlanningCity: Not Started | D (inferred) | not published by the City | not published by the City | not published by the City |
| Chavis-Dix Strollway | Capital improvement projects | PlanningCity: Pre-Approval | C (inferred) | Transportation | not published by the City | not published by the City |
| City Plaza Shade Structures | Capital improvement projects | Planning | D (inferred) | General Government | not published by the City | not published by the City |
| CORPUD Space Study (Dew.&HH): LW Annex Second Floor-Renovation | Capital improvement projects | Planning | C (inferred) | Raleigh Water | Todd Toler | not published by the City |
| DE Benton Dual Media and Filter Expansion | Capital improvement projects | Planning | not published by the City | Raleigh Water | Breanne Wood | not published by the City |
| DEB WTP Dewatering Capacity Improvements | Capital improvement projects | Planning | not published by the City | Raleigh Water | Vinod Korategere | not published by the City |
| Dix Park Rocky Branch Enhancement Project | Capital improvement projects | Planning | D (inferred) | Parks, Recreation & Cultural Resources | not published by the City | not published by the City |
| Downtown Pedestrian Project Phase 2 | Capital improvement projects | PlanningCity: Programmed | D (inferred) | Transportation | not published by the City | not published by the City |
| East Raleigh Regional Study | Capital improvement projects | Planning | not published by the City | Raleigh Water | Matt Cotton | not published by the City |
| East Raleigh Wastewater Conveyance | Capital improvement projects | Planning | not published by the City | Raleigh Water | Matt Cotton | not published by the City |
| EMJ Filter Addition | Capital improvement projects | Planning | B (inferred) | Raleigh Water | Ed Stempien | not published by the City |
| EMJ WTP Generator Expansion Phase 3 and RWPS Generator 1 Replacement | Capital improvement projects | Planning | B (inferred) | Raleigh Water | Vinod Korategere | not published by the City |
| EMJ WTP Sludge Conveyance Improvements | Capital improvement projects | Planning | B (inferred) | Raleigh Water | Vinod Korategere | not published by the City |
| EMJWTP Lagoon Liner | Capital improvement projects | Planning | B (inferred) | Raleigh Water | Breanne Wood | not published by the City |
| Fire Station 1/ Headquarters | Capital improvement projects | PlanningCity: Programmed | D (inferred) | Fire | not published by the City | not published by the City |
| Fire Training Center | Capital improvement projects | PlanningCity: Programmed | C (inferred) | Fire | not published by the City | not published by the City |
| Five Points Streetscape and Safety Study | Capital improvement projects | Planning | E (inferred) | Transportation | not published by the City | not published by the City |
| Fox Road Elementary Sidewalk | Capital improvement projects | PlanningCity: Programmed | B (inferred) | Transportation | not published by the City | not published by the City |
| Frank Street Neighborhood Improvements | Capital improvement projects | Planning | C (inferred) | Stormwater | not published by the City | not published by the City |
| Galvanized Main Replacement – Phase 1 | Capital improvement projects | Planning | A (inferred) | Raleigh Water | Kevin Braxton | not published by the City |
| Genford Court Drainage Improvements - DA | Capital improvement projects | Planning | A (inferred) | Stormwater | not published by the City | not published by the City |
| Glenbrook Area Flood Hazard Reduction | Capital improvement projects | PlanningCity: Not Started | C (inferred) | not published by the City | not published by the City | not published by the City |
| Glenwood At Myrtle Ave Sewer Improvements | Capital improvement projects | Planning | E (inferred) | Raleigh Water | Kristen Pierce | not published by the City |
| Glenwood Ave. and Creston | Capital improvement projects | PlanningCity: Not Started | E (inferred) | not published by the City | not published by the City | not published by the City |
| Granville Dr. Street & Sidewalk Petitioned Improvements | Capital improvement projects | PlanningCity: Programmed | E (inferred) | Transportation | not published by the City | not published by the City |
| Highway 50 Corridor Odor Study | Capital improvement projects | Planning | not published by the City | Raleigh Water | Courtney Licata | not published by the City |
| Indian Creek Trail PS Abandonment | Capital improvement projects | Planning | not published by the City | Raleigh Water | Vinod Korategere | not published by the City |
| Jones Sausage Transmission Main | Capital improvement projects | Planning | not published by the City | Raleigh Water | Justin Biegler | not published by the City |
| Kelford Street Sidewalk | Capital improvement projects | PlanningCity: Programmed | D (inferred) | Transportation | not published by the City | not published by the City |
| Kingsborough Estates Mobile Home Park | Capital improvement projects | PlanningCity: Not Started | C (inferred) | not published by the City | not published by the City | not published by the City |
| Lake Glad PS VE Study | Capital improvement projects | Planning | not published by the City | Raleigh Water | Matt Cotton | not published by the City |
| Lead and Copper Rule Revisions | Capital improvement projects | Planning | B (inferred) | Raleigh Water | Breanne Wood | not published by the City |
| Lead Mine Rd. Sidewalk - Charles Dr. to Sugar Bush Rd. | Capital improvement projects | PlanningCity: Programmed | A (inferred) | Transportation | not published by the City | not published by the City |
| Lions Park GSI Retrofit | Capital improvement projects | PlanningCity: Not Started | C (inferred) | not published by the City | not published by the City | not published by the City |
| Little Creek RRF Speculative Limits | Capital improvement projects | Planning | not published by the City | Raleigh Water | Matt Cotton | not published by the City |
| Lizard Lick Water Transmission Main | Capital improvement projects | Planning | not published by the City | Raleigh Water | Courtney Licata | not published by the City |
| Lower Harris Creek Interceptor | Capital improvement projects | Planning | B (inferred) | Raleigh Water | Justin Biegler | not published by the City |
| Marcom Street Petitioned Sidewalk | Capital improvement projects | PlanningCity: Programmed | D (inferred) | Transportation | not published by the City | not published by the City |
| Marcom Street Sidewalk | Capital improvement projects | PlanningCity: Programmed | D (inferred) | Transportation | not published by the City | not published by the City |
| Marsh Creek Watershed Study | Capital improvement projects | Planning | A (inferred) | Stormwater | not published by the City | not published by the City |
| Midtown Multimodal Bridge | Capital improvement projects | Planning | E (inferred) | Transportation | not published by the City | not published by the City |
| Millbrook Exchange Park Repairs | Capital improvement projects | PlanningCity: Not Started | A (inferred) | not published by the City | not published by the City | not published by the City |
| Mine Creek Outfall East | Capital improvement projects | Planning | A (inferred) | Raleigh Water | Lorea Sample | not published by the City |
| Mitchell Mill Road 24" Transmission Installation (Suction of PS) | Capital improvement projects | Planning | not published by the City | Raleigh Water | Todd Toler | not published by the City |
| Mitchell Mill Road Pump Station | Capital improvement projects | Planning | not published by the City | Raleigh Water | Todd Toler | not published by the City |
| ML KJr Blvd Pedestrian Improvements | Capital improvement projects | PlanningCity: Programmed | C (inferred) | Transportation | not published by the City | not published by the City |
| ML KJr Blvd Pedestrian Improvements | Capital improvement projects | PlanningCity: Programmed | C (inferred) | Transportation | not published by the City | not published by the City |
| ML KJr Blvd Pedestrian Improvements | Capital improvement projects | PlanningCity: Programmed | C (inferred) | Transportation | not published by the City | not published by the City |
| MLK Jr Blvd Pedestrian Improvements | Capital improvement projects | PlanningCity: Programmed | C (inferred) | Transportation | not published by the City | not published by the City |
| MLK Jr Blvd Pedestrian Improvements | Capital improvement projects | PlanningCity: Programmed | C (inferred) | not published by the City | not published by the City | not published by the City |
| NCDOT P-5727 Millbrook Rd (HDR) | Capital improvement projects | PlanningCity: Pre-Approval | A (inferred) | Raleigh Water | Todd Toler | not published by the City |
| NCMA Stream Restoration | Capital improvement projects | PlanningCity: Not Started | E (inferred) | not published by the City | not published by the City | not published by the City |
| Neighborhood Drainage Studies (Kingsborough, Saybrook, Atlantic & Hodges) | Capital improvement projects | Planning | A (inferred) | Stormwater | not published by the City | not published by the City |
| Neptune Drive Drainage Improvements | Capital improvement projects | Planning | C (inferred) | Stormwater | not published by the City | not published by the City |
| Neuse River Intake Supply Study | Capital improvement projects | Planning | not published by the City | Raleigh Water | Breanne Wood | not published by the City |
| New Bern at Freedom Improvements | Capital improvement projects | Planning | C (inferred) | Transportation | not published by the City | not published by the City |
| North Hills Dr. Sidewalk - Lead Mine Rd. to Hillock Dr. | Capital improvement projects | PlanningCity: Programmed | A (inferred) | Transportation | not published by the City | not published by the City |
| North Ridge Country Club | Capital improvement projects | PlanningCity: Not Started | A (inferred) | not published by the City | not published by the City | not published by the City |
| North Ridge Country Club | Capital improvement projects | Planning | A (inferred) | Stormwater | not published by the City | not published by the City |
| NRRRF Headworks Improvements | Capital improvement projects | PlanningCity: Programmed | not published by the City | Raleigh Water | Edward Stempien | not published by the City |
| NRRRF Permitting Study | Capital improvement projects | Planning | not published by the City | Raleigh Water | Matt Cotton | not published by the City |
| NRRRF Reuse Pump Stations Evaluations | Capital improvement projects | Planning | not published by the City | Raleigh Water | Dan Williams | not published by the City |
| NRRRF Warehouse Planning Study | Capital improvement projects | Planning | not published by the City | Raleigh Water | Kristen Pierce | not published by the City |
| Pecan Road Sidewalks near Transit Stops | Capital improvement projects | PlanningCity: Programmed | D (inferred) | Transportation | not published by the City | not published by the City |
| Perry Creek Water Transmission Main | Capital improvement projects | Planning | B (inferred) | Raleigh Water | Kristen Pierce | not published by the City |
| Poole Road West Main Replacement | Capital improvement projects | PlanningCity: Programmed | C (inferred) | Raleigh Water | Ed Stempien | not published by the City |
| Priority 1 Pump Station Upgrades - Phase 2 | Capital improvement projects | Planning | B (inferred) | Raleigh Water | Kevin Braxton | not published by the City |
| Rocky Branch/Central Walnut Watershed Study | Capital improvement projects | Planning | D (inferred) | Stormwater | not published by the City | not published by the City |
| Royal Street Stream Stabilization | Capital improvement projects | Planning | D (inferred) | Stormwater | not published by the City | not published by the City |
| Ruffin St Headwall Replacement Project | Capital improvement projects | Planning | D (inferred) | Stormwater | not published by the City | not published by the City |
| Sanitary Sewer Capacity Study | Capital improvement projects | Planning | not published by the City | Raleigh Water | Breanne Wood | not published by the City |
| Second Avenue Sewer Extension | Capital improvement projects | Planning | not published by the City | Raleigh Water | Leticia Rieger | not published by the City |
| Sewer System Program Management | Capital improvement projects | Planning | not published by the City | Raleigh Water | Kristen Pierce | not published by the City |
| Southwest Beaverdam Sewer Replacement | Capital improvement projects | Planning | E (inferred) | Raleigh Water | Breanne Wood | not published by the City |
| Southwest DT Ped and Bike Gateway | Capital improvement projects | Planning | D (inferred) | Transportation | not published by the City | not published by the City |
| Stacy Street Drainage Improvements | Capital improvement projects | Planning | D (inferred) | Stormwater | not published by the City | not published by the City |
| State Street Main Replacement (CDM): Phase 3 | Capital improvement projects | Planning | C (inferred) | Raleigh Water | Todd Toler | not published by the City |
| State Street Main Replacement (CDM): Phase 5 | Capital improvement projects | Planning | C (inferred) | Raleigh Water | Todd Toler | not published by the City |
| Structure from 32 to 33 Replacement + Asphalt Repave | Capital improvement projects | Planning | A (inferred) | Parks, Recreation & Cultural Resources | not published by the City | not published by the City |
| Sweetbrier/Crescent Court | Capital improvement projects | PlanningCity: Not Started | A (inferred) | not published by the City | not published by the City | not published by the City |
| Tarboro Street Corridor Project | Capital improvement projects | Planning | C (inferred) | Transportation | not published by the City | not published by the City |
| Twin 72-Inch Diameter Sanitary Sewer Interceptor - Phase II | Capital improvement projects | Planning | not published by the City | Raleigh Water | Ed Stempien | not published by the City |
| US401 24" Transmission | Capital improvement projects | Planning | B (inferred) | Raleigh Water | Kevin Braxton | not published by the City |
| Wade Ave Sidewalk - St Marys to Glenwood | Capital improvement projects | PlanningCity: Programmed | D (inferred) | Transportation | not published by the City | not published by the City |
| Wake BRT Southern Corridor | Capital improvement projects | Planning | D (inferred) | Raleigh Water | Julie Parham | not published by the City |
| Wake Forest Rd. to Navaho (under I 440)-(CJS) | Capital improvement projects | Planning | E (inferred) | Raleigh Water | Todd Toler | not published by the City |
| Walnut Creek Interceptor Phase III | Capital improvement projects | Planning | D (inferred) | Raleigh Water | Courtney Licata | not published by the City |
| Whispering Branch and Woodowl Drainage Project | Capital improvement projects | Planning | E (inferred) | Stormwater | not published by the City | not published by the City |
| Yarmouth Road-Edenburgh Road Requested Street Improvements | Capital improvement projects | PlanningCity: Pre-Approval | E (inferred) | Transportation | not published by the City | not published by the City |
| Blue Ridge & GlenwoodAdd pedestrian accomodations at 3 legs, APS, LPI, backplates. | Vision Zero safety | PlanningCity: Funded | E | not published by the City | not published by the City | not published by the City |
| Buffaloe & SouthallInstall pedestrian accommodations at 2 legs (N and W). | Vision Zero safety | PlanningCity: Funded | D | not published by the City | not published by the City | not published by the City |
| Buffaloe & TallyhoeInstall guardrail on approach to culvert. | Vision Zero safety | PlanningCity: Funded | D | not published by the City | not published by the City | not published by the City |
| Buffaloe & Valley StreamInstall pedestrian accommodations at all 4 legs of the intersection. | Vision Zero safety | PlanningCity: Funded | C | not published by the City | not published by the City | not published by the City |
| Capital - Huntleigh - TrawickInstall retroreflective backplates, APS, LPI, flatwork upgrades, new controller, additional signal heads, provide automatic ped recall for signal heads along Capital. | Vision Zero safety | PlanningCity: Funded | C | not published by the City | not published by the City | not published by the City |
| Cashew & ForestvilleNew signal, fiber optic from adjacent signal, and pedestrian accommodations, APS, LPI. (Harris Creek Elementary) | Vision Zero safety | PlanningCity: Funded | B | not published by the City | not published by the City | not published by the City |
| Cole & GlenwoodConstruct left turn lanes on Glenwood Ave. | Vision Zero safety | PlanningCity: Funded | D | not published by the City | not published by the City | not published by the City |
| Country Trail - Leesville - TylertonInstall traffic signal. | Vision Zero safety | PlanningCity: Funded | E | not published by the City | not published by the City | not published by the City |
| Creedmoor (Sawmill, Stonehenge, Brennan, Baileywick)Installation of NB and SB FYAs. | Vision Zero safety | PlanningCity: Funded | not published by the City | not published by the City | not published by the City | not published by the City |
| Dillard & OrabelleNew signal, fiber optic from adjacent signal, and pedestrian accommodations, APS, LPI, reduce crossing width. (Dillard Drive Magnet Middle School) | Vision Zero safety | PlanningCity: Funded | D | not published by the City | not published by the City | not published by the City |
| Downtown Pedestrian Project Phase 2Pedestrian safety upgrades throughout Downtown Raleigh including curb extensions, raised crosswalks, RRFBs, striping improvements, and installation of a few HAWKs and 1 traffic signal. | Vision Zero safety | PlanningCity: Funded | D | not published by the City | not published by the City | not published by the City |
| Duckling - New BernConstruction of a left over at Duckling Way/New Bern. Removal of pavement for former Old US 64. | Vision Zero safety | PlanningCity: Funded | B | not published by the City | not published by the City | not published by the City |
| Duraleigh north of Edwards MillInstall guardrail for NB run off the road crashes. | Vision Zero safety | PlanningCity: Funded | E | not published by the City | not published by the City | not published by the City |
| Edenton & HarringtonSignalization of intersection. | Vision Zero safety | PlanningCity: Funded | D | not published by the City | not published by the City | not published by the City |
| Edwards Mill & TrinityPed accomodations. | Vision Zero safety | PlanningCity: Funded | D | not published by the City | not published by the City | not published by the City |
| Edwards Mill & WadeAdd FYAs and pedestrian heads for existing crosswalks. | Vision Zero safety | PlanningCity: Funded | D | not published by the City | not published by the City | not published by the City |
| Eva Mae & New HopeSignalization of intersection with road widening to add left turn lanes NB and SB. Includes pedestrian accommodations and fills a few sidewalk gaps. | Vision Zero safety | PlanningCity: Funded | C | not published by the City | not published by the City | not published by the City |
| Falls of Neuse - Raven RidgeStripe an exclusive left, thru, and right turn lane on the WB Raven Ridge approach to the intersection, and all associated signal work. | Vision Zero safety | PlanningCity: Funded | B | not published by the City | not published by the City | not published by the City |
| Falls of Neuse & NewtonNB and EB 3 section bimodal heads, pedestrian accommodations at south leg, upgrade crosswalks to hi&vis, APS, LPI. | Vision Zero safety | PlanningCity: Funded | A | not published by the City | not published by the City | not published by the City |
| Falls of Neuse & North BendNB and EB 3 section bimodal heads, pedestrian accommodations at south leg, upgrade crosswalks to hi&vis, APS, LPI. | Vision Zero safety | PlanningCity: Funded | A | not published by the City | not published by the City | not published by the City |
| Fidelity & GulfSignalization of intersection. | Vision Zero safety | PlanningCity: Funded | E | not published by the City | not published by the City | not published by the City |
| Front - I-440 - Six ForksInstall supplemental signal heads, backplates, median to channelize right turn exit ramp, signalize right turn exit ramp, APS, LPI, provide RRFBs at uncontrolled exit ramps throughout interchange, upgrade crosswalk markings. | Vision Zero safety | PlanningCity: Funded | A | not published by the City | not published by the City | not published by the City |
| Garner - TryonInstall backplates and protected left capabilities. Install crosswalk on N and E legs with LPI. Connect SE Sidewalk to intersection. | Vision Zero safety | PlanningCity: Funded | D | not published by the City | not published by the City | not published by the City |
| Glascock - RaleighInstall supplemental signal heads, implement NTOR EB, upgrade ramps, install APS, LPI, install a curb bumpout, install new ped posts. | Vision Zero safety | PlanningCity: Funded | C | not published by the City | not published by the City | not published by the City |
| Glendower & LynnSignalization of intersection including pedestrian heads for all 4 legs. | Vision Zero safety | PlanningCity: Funded | E | not published by the City | not published by the City | not published by the City |
| Glenwood & HilburnPedestrian safety upgrades including crosswalks for missing legs, hi&vis striping, LPI, APS, straighten crosswalk, sidewalk gap. | Vision Zero safety | PlanningCity: Funded | E | not published by the City | not published by the City | not published by the City |
| Grove Barton & PinecrestSignalization of intersection. | Vision Zero safety | PlanningCity: Funded | E | not published by the City | not published by the City | not published by the City |
| Hardimont - New Hope Church - Wake ForestInstall Crosswalks, Pedestrian signals, and other safety improvements at intersection and adjacent driveways/sidestreets | Vision Zero safety | PlanningCity: Funded | A | not published by the City | not published by the City | not published by the City |
| I-440 & SaundersAdd north to south pedestrian accessibility along Saunders St through the interchange | Vision Zero safety | PlanningCity: Funded | D | not published by the City | not published by the City | not published by the City |
| Lake Wheeler Bridge over I-440Installation of pedestrian safety fencing along the west side of bridge. | Vision Zero safety | PlanningCity: Funded | D | not published by the City | not published by the City | not published by the City |
| Martin Luther King from Wilmington to PoolePedestrian Safety Upgrades including curb ramps, hi&vis crosswalks, APS and signal upgrades. | Vision Zero safety | PlanningCity: Funded | C | not published by the City | not published by the City | not published by the City |
| Martin Luther King Jr - Wilmington to EastPedestrian Safety Upgrades including curb ramps, hi-vis crosswalks, and signal upgrades. | Vision Zero safety | PlanningCity: Funded | C | not published by the City | not published by the City | not published by the City |
| Martin Luther King Jr from Garner to HaywoodPedestrian Safety Upgrades including curb ramps, hi-vis crosswalks, and signal upgrades. | Vision Zero safety | PlanningCity: Funded | C | not published by the City | not published by the City | not published by the City |
| Martin Luther King Jr from Gregg to Rock QuarryPedestrian Safety Upgrades including curb ramps, hi-vis crosswalks, and signal upgrades. | Vision Zero safety | PlanningCity: Funded | C | not published by the City | not published by the City | not published by the City |
| Martin Luther King Jr from Raleigh to PoolePedestrian Safety Upgrades including curb ramps, hi-vis crosswalks, and signal upgrades. | Vision Zero safety | PlanningCity: Funded | C | not published by the City | not published by the City | not published by the City |
| MLK - Salisbury - WilmingtonInstall a second left turn lane for NB Wilmington, install a pedestrian refuge island for the eastern crosswalk, upgrade crosswalks to high visibility. | Vision Zero safety | PlanningCity: Funded | D | not published by the City | not published by the City | not published by the City |
| Oakwood & Raleigh StAdd FYAs, LPI, APS. | Vision Zero safety | PlanningCity: Funded | C | not published by the City | not published by the City | not published by the City |
| Ollie - Ronald - Wake ForestInstall NB left turn FYA, provide a new pedestrian signal phase on north leg, upgrade/install new flatwork, refresh markings, install APS/LPI. | Vision Zero safety | PlanningCity: Funded | A | not published by the City | not published by the City | not published by the City |
| Person & PolkSignalization of intersection | Vision Zero safety | PlanningCity: Funded | C | not published by the City | not published by the City | not published by the City |
| Poole & SamuelSignalization of intersection. | Vision Zero safety | PlanningCity: Funded | C | not published by the City | not published by the City | not published by the City |
| Tryon - WilmingtonInstall Hi-vis crosswalks, LPI, delineator bumpouts, sidewalk gaps, backplates, and near side signal heads. | Vision Zero safety | PlanningCity: Funded | D | not published by the City | not published by the City | not published by the City |
| Aberdeen Dr from Rose Ln to EndSidewalk and street improvement | Sidewalks | PlanningCity: FUNDED | C (inferred) | not published by the City | not published by the City | not published by the City |
| ACC BLVD from MOUNT HERMAN | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | E (inferred) | not published by the City | not published by the City | not published by the City |
| ACC BLVD from NEAR COURTNEY to MOUNT HERMAN | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | E (inferred) | not published by the City | not published by the City | not published by the City |
| Alloy St/ Glendridge Dr/ Bardwell Rd from Highwoods Blvd to Brentwood Rd | Sidewalks | PlanningCity: PLANNED | A (inferred) | not published by the City | not published by the City | not published by the City |
| ANDERSON DR from ST MARYS ST to OVERBROOK DRSidewalk Only | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| AUBURN CHURCH RD from EAGLE CREST WAY to WALL STORE RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| AUBURN CHURCH RD from JONES SAUSAGE RD to EAGLE CREST WAYMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| AVENT FERRY RD from LAKE JOHNSON PARK to LAKE JOHNSON PARKMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| Bailey Dr/ Boaz Rd/ Darby St from Waller Pl to S State St | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| BARWELL RD from BRITT DR to POOLE RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| BARWELL RD from NEALS CREEK DR to BRITT DRMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | C (inferred) | not published by the City | not published by the City | not published by the City |
| BASHFORD RD from SADDLE SEAT DR to STROTHER RDCurb and Gutter | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| BATTLE BRIDGE RD from GRANITE QUARRY DR to GRIFFINS GLEN DRMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| BATTLE BRIDGE RD from GRIFFINS GLEN DR to MAGNOLIA POND RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| BATTLE BRIDGE RD from ROCK QUARRY RD to GRANITE QUARRY DRMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | C (inferred) | not published by the City | not published by the City | not published by the City |
| Bayberry Ln/ Pastille Ln from Basil Dr to Bramblewood Dr | Sidewalks | PlanningCity: PLANNED | A (inferred) | not published by the City | not published by the City | not published by the City |
| Bennett St from Glascock St to Dennis Ave | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| BERYL RD from BLUE RIDGE RD to RR CROSSINGSidewalk Only | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| Beverly Dr from Little John Rd to Poole Rd | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| BLAND RD from STEINBECK DR to HARDIMONT RDSidewalk Only | Sidewalks | PlanningCity: PLANNED | A (inferred) | not published by the City | not published by the City | not published by the City |
| BLUE RIDGE RD from DISTRICT DR to REEDY CREEK RDSidewalk Only | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| Bluffridge Dr from Bridgeport Dr to Sawmill Rd | Sidewalks | PlanningCity: PLANNED | A (inferred) | not published by the City | not published by the City | not published by the City |
| Bragg St from S Blount St to Garner Rd | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| BRIDGEPORT DR from ABBOTSBURY CT to TIDE CTCurb and Gutter | Sidewalks | PlanningCity: PLANNED | A (inferred) | not published by the City | not published by the City | not published by the City |
| Brookhaven Dr from Rembert Dr to Glenwood Ave | Sidewalks | PlanningCity: FUNDED | E (inferred) | not published by the City | not published by the City | not published by the City |
| Brooks Ave from Wade Ave to Lake Boone Trl | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| BUFFALOE RD from BUFFALOE ROAD ATHLETIC PARK to NEUSE RIVER GREENWAYMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | not published by the City | not published by the City | not published by the City | not published by the City |
| BUFFALOE RD from FORESTVILLE RD to OLD MILBURNIE RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| BUFFALOE RD from N NEW HOPE RD to SOUTHALL RDSidewalk Only | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| BUFFALOE RD from NEUSE RIVER GREENWAY to FORESTVILLE RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | not published by the City | not published by the City | not published by the City | not published by the City |
| BUFFALOE RD from OLD MILBURNIE RD to OLD CREWS RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| BUFFALOE RD from SOUTHALL to BUFFALOE ROAD ATHLETIC PARKMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | not published by the City | not published by the City | not published by the City | not published by the City |
| Burt Dr from Stovall Dr to Gorman St | Sidewalks | PlanningCity: FUNDED | D (inferred) | not published by the City | not published by the City | not published by the City |
| Canterbury Rd from Wade Ave to Lewis Farm Rd | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| Cape Charles Dr from Dominion Blvd to Renfield Dr | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| CAPITAL BLVD from 1/2 MILE WEST OF WAKE FOREST RD RAMP to WAKE FOREST RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | C (inferred) | not published by the City | not published by the City | not published by the City |
| CAPITAL BLVD from CRABTREE BLVD to END OF I-5970 PROJECTMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | C (inferred) | not published by the City | not published by the City | not published by the City |
| CAPITAL BLVD from WAKE FOREST RD to CRABTREE BLVDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | C (inferred) | not published by the City | not published by the City | not published by the City |
| Carolina Ave from Scarlet Maple Dr to Western Blvd | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| Carolina Ave from Western Blvd to Powell Dr | Sidewalks | PlanningCity: FUNDED | D (inferred) | not published by the City | not published by the City | not published by the City |
| Carteret Dr/ Morehead Dr from Rembert Dr to Glenwood Ave | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| CHAPEL HILL RD from EDWARDS MILL RD to HILLSBOROUGH STMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | D (inferred) | not published by the City | not published by the City | not published by the City |
| CHAPEL HILL RD from I 40 RAMP to NOWELL RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| CHAPEL HILL RD from NOWELL RD to EDWARDS MILL RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | D (inferred) | not published by the City | not published by the City | not published by the City |
| Chappell Dr from Avent Ferry Rd to Broadwell Dr | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| Chatham Ln from Bertie Dr to Glascock St | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| Churchill Rd from Ridge Rd to Brooks Ave | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| Cobblestone Ct from Ridge Rd to Chrisdale Ct | Sidewalks | PlanningCity: FUNDED | E (inferred) | not published by the City | not published by the City | not published by the City |
| CORPORATION PKWY from NEW BERN AVE to LAKE WOODARD DRSidewalk Only | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | C (inferred) | not published by the City | not published by the City | not published by the City |
| COUNTRY TRL from PINECREST RD to TROUTMAN LNCurb and Gutter | Sidewalks | PlanningCity: PLANNED | not published by the City | not published by the City | not published by the City | not published by the City |
| Craven Dr/ Alamance Dr/ Yadkin Dr from Pasquotank Dr to Alleghany Dr | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| CREECH RD from ADCOX PL to QUARTZ CTSidewalk Only | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| CREECH RD from ADCOX PL to QUARTZ CTSidewalk Only | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| CREECH RD from SANDERFORD RD to COLONY DRMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| CREEKSIDE from INDUSTRIAL to WAKE FOREST RD | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | E (inferred) | not published by the City | not published by the City | not published by the City |
| Crown Crossing Ln from Cross Link Rd to Fitzgerald DrSidewalk Only | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| Daingerfield Dr/ Dewing Dr/ Pritchard Ct from Neuse Crossing Dr to Serendipity Dr | Sidewalks | PlanningCity: PLANNED | B (inferred) | not published by the City | not published by the City | not published by the City |
| Dansey Dr from Nesbit Ct to US 401 | Sidewalks | PlanningCity: PLANNED | B (inferred) | not published by the City | not published by the City | not published by the City |
| Dennis Ave from Capital Blvd to Timber Dr | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| DEPARTURE DR from DISCOVERY DR to OAK FOREST DRSidewalk Only | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | A (inferred) | not published by the City | not published by the City | not published by the City |
| DEPARTURE DR from E MILLBROOK RD to SPRING FOREST RDSidewalk Only | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | B (inferred) | not published by the City | not published by the City | not published by the City |
| DILLARD DR from JONES FRANKLIN RD to TRYON RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| DISTRICT DR from BLUE RIDGE RD to GOLD STAR DRSidewalk Only | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | D (inferred) | not published by the City | not published by the City | not published by the City |
| DIXIE TRL from CHURCHILL RD to GRANT AVESidewalk Only | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| DIXIE TRL from HILLSBOROUGH ST to EVERETT AVESidewalk Only | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| Dominion Blvd/ Cape Charles Dr from Center Cross Ct to Leesburg Ln | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| DONALD ROSS from NEW BERN AVE to POOLE | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | C (inferred) | not published by the City | not published by the City | not published by the City |
| Dowling Rd from Carolina Cherry Dr to Old Poole Rd | Sidewalks | PlanningCity: PLANNED | not published by the City | not published by the City | not published by the City | not published by the City |
| DUNN RD from COKESBURY LN to FALLS LANDING DRMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| Dunn Rd from Neland St to Greenway EntranceSidewalk Only | Sidewalks | PlanningCity: PLANNED | B (inferred) | not published by the City | not published by the City | not published by the City |
| E Jones St from N State St to Hill St | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| E Lane St from Linden Ave to Hill St | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| E Lee St from S Blount St to S East St | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| E Roanoke Park Rd/ Pershing Rd from Sunrise Ave to Center Rd | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| E SIX FORKS RD from ATLANTIC AVE to INDUSTRIAL DRSidewalk Only | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| E WHITAKER MILL from ATLANTIC to WAKE FOREST RDSidewalk Only | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| EDENBURGH RD from GLENWOOD AVE to LAKE BOONE TRLCurb and Gutter | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| EDWARDS MILL RD from CRABTREE to PARKLAKECurb and Gutter | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| EDWARDS MILL RD from DURALEIGH RD to REEDY CREEK RDSidewalk Only | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | D (inferred) | not published by the City | not published by the City | not published by the City |
| EDWARDS MILL RD from STEPHEN STROUD to WADE PARKMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| Englehardt Dr from Leesville Rd to Erinsbrook Dr | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| FAIRBANKS DR from LEESVILLE RD to WESTGATE RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| FAIRVIEW RD from CAPITAL BLVD to BICKETT BLVDCurb and Gutter | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | C (inferred) | not published by the City | not published by the City | not published by the City |
| FAIRVIEW RD from OBERLIN RD to CANTERBURY RDSidewalk Only | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| Falls Church Rd from Old Forge Cir to Treverton Pl | Sidewalks | PlanningCity: PLANNED | A (inferred) | not published by the City | not published by the City | not published by the City |
| Fenton St from Capital Blvd to Capital BlvdCurb and Gutter | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| FORESTVILLE RD from 1/2 MILE SOUTH OF OLD MILBURNIE RD to OLD MILBURNIE RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| FORESTVILLE RD from BRINLEY MANOR DR to BUFFALOE RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | B (inferred) | not published by the City | not published by the City | not published by the City |
| FORESTVILLE RD from BUFFALOE RD to LANDOVER LNMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | B (inferred) | not published by the City | not published by the City | not published by the City |
| FORESTVILLE RD from LANDOVER LN to OLD WATKINS RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| FORESTVILLE RD from LOUISBURG RD to BRAEFIELD DRMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | B (inferred) | not published by the City | not published by the City | not published by the City |
| FORESTVILLE RD from OLD COUNTRY LN to OLD WATKINS RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | B (inferred) | not published by the City | not published by the City | not published by the City |
| FORESTVILLE RD from OLD MILBURNIE RD to BRINLEY MANOR DRMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| FORESTVILLE RD from SERENDIPITY DR to BRAEFIELD DRMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | B (inferred) | not published by the City | not published by the City | not published by the City |
| FORESTVILLE RD from SERENDIPITY DR to OLD COUNTRY LNMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | B (inferred) | not published by the City | not published by the City | not published by the City |
| FOX RD from JEFFREYS CREEK LN to BEAVERWOOD DRCurb and Gutter | Sidewalks | PlanningCity: FUNDED | B (inferred) | not published by the City | not published by the City | not published by the City |
| FOX RD from JEFFREYS CREEK LN to LOUISBURG RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | B (inferred) | not published by the City | not published by the City | not published by the City |
| FOX RD from OLD WAKE FOREST RD to SUMNER BLVDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | B (inferred) | not published by the City | not published by the City | not published by the City |
| FOX RD from SEGAL DR to TOWN DRMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | B (inferred) | not published by the City | not published by the City | not published by the City |
| French Dr from Lead Mine Rd to Litchfield Downs Ln | Sidewalks | PlanningCity: PLANNED | A (inferred) | not published by the City | not published by the City | not published by the City |
| FRONT from INDUSTRIAL to N/A | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | E (inferred) | not published by the City | not published by the City | not published by the City |
| Fuller St/ Grissom St/ Green St/ Prospect Ave from End of Fuller St to End of Green St | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | D (inferred) | not published by the City | not published by the City | not published by the City |
| GARDNER ST from WADE AVE to VAN DYKE AVESidewalk Only | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| GLEN EDEN DR from GLENWOOD AVE to BLUE RIDGE RDSidewalk Only | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| GLEN EDEN DR from GLENWOOD AVE to SUSSEX RDSidewalk Only | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| GLENWOOD AVE from BROOKHAVEN DR to CREEDMOOR RDSidewalk Only | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| GLENWOOD AVE from CREEDMOOR to LEAD MINE RDCurb and Gutter | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | E (inferred) | not published by the City | not published by the City | not published by the City |
| GLENWOOD AVE from FAIRHILL DR to MOREHEAD DRSidewalk Only | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | E (inferred) | not published by the City | not published by the City | not published by the City |
| GLENWOOD AVE from GLEN EDEN DR to PASQUOTANK DRMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | E (inferred) | not published by the City | not published by the City | not published by the City |
| GLENWOOD AVE from MOREHEAD DR to CREEDMOOR RDSidewalk Only | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | E (inferred) | not published by the City | not published by the City | not published by the City |
| GLENWOOD AVE from NATIONAL DR to LEAD MINE RDCurb and Gutter | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | A (inferred) | not published by the City | not published by the City | not published by the City |
| GLENWOOD AVE from OBERLIN RD to GLEN EDEN DRMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | E (inferred) | not published by the City | not published by the City | not published by the City |
| GLENWOOD AVE from PASQUOTANK DR to NATIONAL DRMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | E (inferred) | not published by the City | not published by the City | not published by the City |
| GLOBE RD from EMERALD CREEK DR to AVIATION PKWYMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | E (inferred) | not published by the City | not published by the City | not published by the City |
| GOLD STAR from DISTRICT to REEDY CREEKCurb and Gutter | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | D (inferred) | not published by the City | not published by the City | not published by the City |
| Granville Dr from Glenwood Ave to Transylvania Ave | Sidewalks | PlanningCity: FUNDED | E (inferred) | not published by the City | not published by the City | not published by the City |
| GRESHAM LAKE RD from CAPITAL HILLS DR to CAPITAL BLVDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| GRESHAM LAKE RD from ROWLAND RD to OVERLOOK RDCurb and Gutter | Sidewalks | PlanningCity: PLANNED | B (inferred) | not published by the City | not published by the City | not published by the City |
| GRESHAM LAKE RD from ROWLAND RD to WELBORN STMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| GRESHAM LAKE RD from WELBRON ST to CAPITAL HILLS DRMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | B (inferred) | not published by the City | not published by the City | not published by the City |
| Hadley Rd from Bailey Dr to Calloway Dr | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| HAMMOND RD from CHAPANOKE RD to TRYON RDSidewalk Only | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | D (inferred) | not published by the City | not published by the City | not published by the City |
| HAMMOND RD from HOKE ST to I 40Curb and Gutter | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | C (inferred) | not published by the City | not published by the City | not published by the City |
| HAMMOND RD from RUSH ST to CHAPANOKE RDSidewalk Only | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | D (inferred) | not published by the City | not published by the City | not published by the City |
| HAMMOND RD from RUSH ST to I-40Sidewalk Only | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | D (inferred) | not published by the City | not published by the City | not published by the City |
| HAMMOND RD from TRYON RD to MECHANICAL BLVDSidewalk Only | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | D (inferred) | not published by the City | not published by the City | not published by the City |
| Hamrick Dr from Lodestar Dr to Bridgeport Dr | Sidewalks | PlanningCity: PLANNED | A (inferred) | not published by the City | not published by the City | not published by the City |
| HARGROVE RD from SPRING FOREST to E MILLBROOKSidewalk Only | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | B (inferred) | not published by the City | not published by the City | not published by the City |
| Harrington St from W North St to W Lane StSidewalk Only | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| Havenwood Dr/ Pilgrim Rd from Beaverwood Dr to US 401 | Sidewalks | PlanningCity: PLANNED | B (inferred) | not published by the City | not published by the City | not published by the City |
| HICKORY GROVE CHURCH RD from LEESVILLE RD to BRADWELL CTMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | E (inferred) | not published by the City | not published by the City | not published by the City |
| HICKORY GROVE RD from CARPENTER POND RD to BRADWELL CTMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| HILBURN DR from GLENWOOD AVE to LYNN RDSidewalk Only | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | E (inferred) | not published by the City | not published by the City | not published by the City |
| Hill St from Oakwood Ave to New Bern Ave | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| HILLSBOROUGH ST from BURTON AVE to WOLF GREEN DRMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | D (inferred) | not published by the City | not published by the City | not published by the City |
| HILLSBOROUGH ST from BURTON to JONES FRANKLINCurb and Gutter | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| HILLSBOROUGH ST from HILLSBOROUGH ST TO I 440 RAMP to BLUE RIDGE RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | not published by the City | not published by the City | not published by the City | not published by the City |
| HILLSBOROUGH ST from WOLF GREEN DR to I 40Major Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | D (inferred) | not published by the City | not published by the City | not published by the City |
| HODGES from ATLANTIC to LAURELBROOK | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | C (inferred) | not published by the City | not published by the City | not published by the City |
| HODGES from LAURELBROOK to CAPITAL | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | C (inferred) | not published by the City | not published by the City | not published by the City |
| HODGES from WAKE FOREST to ATLANTICCurb and Gutter | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| Hoke St from S Person St to Garner Rd | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| HONEYCUTT from FALLS OF NEUSE to CLEAR CREEK FARM | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| HOWARD RD from CREEDMOOR RD to RAY RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | not published by the City | not published by the City | not published by the City | not published by the City |
| ILEAGNES RD from S SAUNDERS ST to S WILMINGTON STSidewalk Only | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | D (inferred) | not published by the City | not published by the City | not published by the City |
| INDUSTRIAL from CREEKSIDE to E SIX FORKS | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | E (inferred) | not published by the City | not published by the City | not published by the City |
| INDUSTRIAL from E SIX FORKS to FRONT | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | E (inferred) | not published by the City | not published by the City | not published by the City |
| Jackson St from Method Rd to Whitmore Dr | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| Jeffreys Grove School Rd from Eddystone Dr to Creedmoor Rd | Sidewalks | PlanningCity: PLANNED | not published by the City | not published by the City | not published by the City | not published by the City |
| JONES FRANKLIN RD from ATHENS DR to HUNT CLUB LNMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| JONES FRANKLIN RD from FORT SUMTER RD to ATHENS DRMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| JONES FRANKLIN RD from I 40 to TRYON RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | not published by the City | not published by the City | not published by the City | not published by the City |
| Kelford Street from Gorman St to Stovall Dr | Sidewalks | PlanningCity: FUNDED | D (inferred) | not published by the City | not published by the City | not published by the City |
| KIDD from DONALD ROSS to SWINBURNE | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | C (inferred) | not published by the City | not published by the City | not published by the City |
| KYLE DR from LOUISBURG RD to VALLEY STREAM DRMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | B (inferred) | not published by the City | not published by the City | not published by the City |
| LAKE BOONE TRL from DIXIE TRL to BROOKS AVECurb and Gutter | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| LAKE DAM RD from AVENT FERRY RD to GREENWAY XINGCurb and Gutter | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| LAKE DAM RD from GREENWAY XING to TRYON RDCurb and Gutter | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| LAKE WHEELER from CENTENNIAL to KIRKLANDCurb and Gutter | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | D (inferred) | not published by the City | not published by the City | not published by the City |
| LAKE WHEELER from KIRKLAND to TRYONMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| Lake Woodard Dr from Brentwood Rd to Timberlake Rd | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| Lakemont Dr/ Pinecroft Dr/ Sweetbriar Dr from E Rowan St to E Millbrook Rd | Sidewalks | PlanningCity: PLANNED | A (inferred) | not published by the City | not published by the City | not published by the City |
| Landor Rd/ W Drewry Ln/ E Drewry Ln from Marlowe Rd to Anderson Dr | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| LAUREL HILLS RD from EDWARDS MILL RD NORTH END to EDWARDS MILL RD SOUTH ENDCurb and Gutter | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| LEAD MINE RD from CHARLES DR to TOWN AND COUNTRY RDSidewalk Only | Sidewalks | PlanningCity: PLANNED | A (inferred) | not published by the City | not published by the City | not published by the City |
| LEAD MINE RD from CHARLES to INMAN PARK DRSidewalk Only | Sidewalks | PlanningCity: FUNDED | A (inferred) | not published by the City | not published by the City | not published by the City |
| LEAD MINE RD from LYNN RD to SAWMILL RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | A (inferred) | not published by the City | not published by the City | not published by the City |
| LEAD MINE RD from MILLBROOK RD to LYNN RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | A (inferred) | not published by the City | not published by the City | not published by the City |
| LEAD MINE RD from TOWN AND COUNTRY RD to SAWMILL RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | A (inferred) | not published by the City | not published by the City | not published by the City |
| LEESVILLE from HICKORY GROVE CHURCH to SYCAMOREMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| LEESVILLE from I-540 WB Ramps to I-540 EB RampsSidewalk Only | Sidewalks | PlanningCity: PLANNED | not published by the City | not published by the City | not published by the City | not published by the City |
| LEESVILLE from SYCAMORE RD to MOUNT HERMAN | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| LEESVILLE RD from FAIRBANKS DR to STRICKLAND RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | not published by the City | not published by the City | not published by the City | not published by the City |
| LEESVILLE RD from FAIRBANKS RD to COUNTRY TRLMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | not published by the City | not published by the City | not published by the City | not published by the City |
| LEESVILLE RD from LYNN RD to COUNTRY TRLMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| Lewis Farm Rd from Ridge Rd to Brooks Ave | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| LIGON ST from METHOD RD to ATWATER STCurb and Gutter | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| LITCHFORD RD from HARPS MILL RD to HUNTING RIDGE RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | not published by the City | not published by the City | not published by the City | not published by the City |
| LITCHFORD RD from OLD WAKE FOREST RD to FALLS OF NEUSE RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | B (inferred) | not published by the City | not published by the City | not published by the City |
| LITCHFORD RD from OLD WAKE FOREST RD to HUNTING RIDGE RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | A (inferred) | not published by the City | not published by the City | not published by the City |
| Lodestar Dr/ Snow Wind Dr from Murray Hill Dr to Windjammer dr | Sidewalks | PlanningCity: PLANNED | A (inferred) | not published by the City | not published by the City | not published by the City |
| LOUISBURG RD from 500 FEET WEST OF LELAND DR to FORESTVILLE RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| LOUISBURG RD from FORESTVILLE RD to LILLIE LILES RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| LOUISBURG RD from LOWELL RIDGE RD to 500 FEET WEST OF LELAND DRMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| LOUISBURG RD from MITCHELL MILL RD to LOWELL RIDGE RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| LOUISBURG RD from MITCHELL MILL RD to PERRY CREEK RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | B (inferred) | not published by the City | not published by the City | not published by the City |
| LOUISBURY RD from GEAR BOX DR to 300 FEET SOUTH OF HEAVEN BOUND STMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| LOUISBURY RD from GEAR BOX DR to 300 FEET SOUTH OF HEAVEN BOUND STMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| LUTHER RD from NEW BERN AVE to FALSTAFF RDCurb and Gutter | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | C (inferred) | not published by the City | not published by the City | not published by the City |
| LUTHER RD from NEW BERN AVE to FALSTAFF RDCurb and Gutter | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | C (inferred) | not published by the City | not published by the City | not published by the City |
| LYNN RD from MADISON RIDGE WAY to PLEASANT PINES DRSidewalk Only | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| MAITLAND from BASTION to NEW BERN AVESidewalk Only | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| Manchester Dr from Inglewood Ln to Wimbleton Dr | Sidewalks | PlanningCity: PLANNED | A (inferred) | not published by the City | not published by the City | not published by the City |
| Marcom Street from Gorman St to Stovall Dr | Sidewalks | PlanningCity: FUNDED | D (inferred) | not published by the City | not published by the City | not published by the City |
| Marlowe Rd from Lassiter Mill Rd to Landor Rd | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| Marlowe Rd from Yadkin Dr to Old Lassiter Mill Rd | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| Maywood Ave from S Saunders St to Fayetteville St | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| Memory Rd from Sunbow Falls Ln to E Millbrook Rd | Sidewalks | PlanningCity: PLANNED | A (inferred) | not published by the City | not published by the City | not published by the City |
| MILBURNIE from NEW BERN AVE to N PEARTREE | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | C (inferred) | not published by the City | not published by the City | not published by the City |
| MITCHELL MILL RD from FORESTVILLE RD to WATKINS RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| MITCHELL MILL RD from WATKINS RD to 750 FEET EAST OF MEDLIN WOODS RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| Morgans Way from Creedmoor Rd to Hamrick Dr | Sidewalks | PlanningCity: PLANNED | A (inferred) | not published by the City | not published by the City | not published by the City |
| N Boundary St/ Watauga St from Person St to Oakwood Ave | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| N Harrington St from W North St to W Lane StCurb and Gutter | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| N HILLS DR from LEAD MINE RD to HILLOCK DRSidewalk Only | Sidewalks | PlanningCity: FUNDED | A (inferred) | not published by the City | not published by the City | not published by the City |
| N PEARTREE LN from NEW BERN AVE to MILBURNIE RDSidewalk Only | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| N WEST ST from Tucker St to W Johnson StSidewalk Only | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | D (inferred) | not published by the City | not published by the City | not published by the City |
| N WEST ST from W Peace St to Wade AveSidewalk Only | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | D (inferred) | not published by the City | not published by the City | not published by the City |
| Neuse Crossing Dr from Mitchell Mill Rd to Suncrest Village Ln | Sidewalks | PlanningCity: PLANNED | B (inferred) | not published by the City | not published by the City | not published by the City |
| NEW BERN AVE from N ROGERS LN to OLD MILBURNIE RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | C (inferred) | not published by the City | not published by the City | not published by the City |
| NEW BERN AVE from N ROGERS LN to PARTIN RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | C (inferred) | not published by the City | not published by the City | not published by the City |
| NEW BERN AVE from TRAWICK RD to SHANTA DRMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | C (inferred) | not published by the City | not published by the City | not published by the City |
| Norris St from Frank St to Glascock StCurb and Gutter | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| Norton Ln from Fox Rd to Botany Bay Dr | Sidewalks | PlanningCity: PLANNED | B (inferred) | not published by the City | not published by the City | not published by the City |
| NOWELL RD from TRINITY RD to CHAPEL HILL RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| NOWELL RD from TRINITY RD to HILLSBOROUGH STCurb and Gutter | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | D (inferred) | not published by the City | not published by the City | not published by the City |
| OAK FOREST DR from CAPITAL BLVD to 600' EAST OF MELVILLE ROADSidewalk Only | Sidewalks | PlanningCity: PLANNED | B (inferred) | not published by the City | not published by the City | not published by the City |
| OAK FOREST DR from CAPITAL BLVD to OLD WAKE FOREST RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | A (inferred) | not published by the City | not published by the City | not published by the City |
| Oak Forest Dr from Tanglewood Dr to Capital BlvdCurb and Gutter | Sidewalks | PlanningCity: PLANNED | A (inferred) | not published by the City | not published by the City | not published by the City |
| OLD BUFFALOE RD from BUFFALOE RD to CAPITAL BLVDCurb and Gutter | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| OLD FALLS OF NEUSE from MOUNTAIN HIGH RD to OLD NC 98Curb and Gutter | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | B (inferred) | not published by the City | not published by the City | not published by the City |
| OLD FALLS OF NEUSE from OLD NC 98 to NC 98Curb and Gutter | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | B (inferred) | not published by the City | not published by the City | not published by the City |
| OLD LEAD MINE RD from FORUM DR to LEAD MINE RDCurb and Gutter | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | A (inferred) | not published by the City | not published by the City | not published by the City |
| OLD MILBURNIE RD from BLACKARD POND RD to BUFFALOE RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| OLD MILBURNIE RD from FORESTVILLE RD to OLD LEWIS FARM RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| OLD MILBURNIE RD from KNIGHTDALE BLVD to PENSELWOOD DRMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| OLD MILBURNIE RD from LEGACY OAKS DR/HONEY IVY LN to TARHEEL CLUB RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| OLD MILBURNIE RD from OLD LEWIS FARM RD to BLACKARD POND RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| OLD MILBURNIE RD from OLD LEWIS FARM RD to LIZEI STMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| OLD MILBURNIE RD from PENSELWOOD DR to LEGACY OAKS DR/HONEY IVY LNMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | B (inferred) | not published by the City | not published by the City | not published by the City |
| OLD MILBURNIE RD from TARHEEL CLUB RD to FORESTVILLE RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | B (inferred) | not published by the City | not published by the City | not published by the City |
| OLD POOLE RD from POOLE RD to STONE MANOR DRCurb and Gutter | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| OLD WAKE FOREST RD from ATLANTIC AVE to E MILLBROOK RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| OLD WAKE FOREST RD from E MILLBROOK RD to ATLANTIC AVEMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | A (inferred) | not published by the City | not published by the City | not published by the City |
| Pasquotank Dr/ Transylvania Ave/ Rutherford Dr from Glenwood Ave to Beaufort St | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| PEARL RD from ADVANTIS DR to ROCK QUARRY RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | C (inferred) | not published by the City | not published by the City | not published by the City |
| PEARL RD from CAMELOT VILLAGE AVE to BRAMBLETON AVEMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| PEARL RD from ROCK QUARRY RD to CAMELOT VILLAGE AVEMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| PECAN RD from SAUNDERS ST to WILMINGTON STSidewalk Only | Sidewalks | PlanningCity: FUNDED | D (inferred) | not published by the City | not published by the City | not published by the City |
| PERRY CREEK RD from LOUISBURG RD to FOX RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | B (inferred) | not published by the City | not published by the City | not published by the City |
| Petyon St from Ellerbe Ln to End | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| PINECREST RD from COUNTRY TRL to FAIRBANKS DRMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | not published by the City | not published by the City | not published by the City | not published by the City |
| PINECREST RD from GLENWOOD AVE to COUNTRY TRLCurb and Gutter | Sidewalks | PlanningCity: PLANNED | not published by the City | not published by the City | not published by the City | not published by the City |
| Pleasant Grove Church Rd from Pleasant Pines Dr to W Millbrook Rd | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| Pleasant Pines Dr/ Hilburn Hills Ln from Lynn Rd to Davis Cir | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| PLEASANT VALLEY RD from GLENWOOD AVE to W MILLBROOK RDSidewalk Only | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | E (inferred) | not published by the City | not published by the City | not published by the City |
| PLEASANT VALLEY RD from RIESE DR to W MILLBROOK RDSidewalk Only | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| POWELL DR from WESTERN BLVD to HILLSBOROUGH STCurb and Gutter | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| POWELL from HUNTINGDON to WESTERNSidewalk Only | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| PRINCE DR from JONES FRANKLIN RD to TRYON RDCurb and Gutter | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | D (inferred) | not published by the City | not published by the City | not published by the City |
| PYLON from BLUE RIDGE to BERYLSidewalk Only | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| RAVEN RIDGE RD from FALLS OF NEUSE RD to SAVANNAH OAKS WAYMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| RAY RD from Andrea Ln to STRICKLAND RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | A (inferred) | not published by the City | not published by the City | not published by the City |
| RAY RD from HOWARD RD to Andrea LnMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | A (inferred) | not published by the City | not published by the City | not published by the City |
| RAY RD from LYNN RD to HOWARD RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | A (inferred) | not published by the City | not published by the City | not published by the City |
| RAY RD from LYNN RD to LEESVILLE RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | A (inferred) | not published by the City | not published by the City | not published by the City |
| Rembert Dr - B from Winthrop Dr to Brookhaven Dr | Sidewalks | PlanningCity: FUNDED | E (inferred) | not published by the City | not published by the City | not published by the City |
| Rembert Dr/ Winthrop Dr from Glenwood Ave to Sleepy Hollow Dr | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| ROCK QUARRY RD from BARWELL RD to KASOTA LNMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| ROCK QUARRY RD from BARWELL RD to WHITFIELD RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | not published by the City | not published by the City | not published by the City | not published by the City |
| ROCK QUARRY RD from KASOTA LN to JONES SAUSAGE RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| Rose Ln from Poole Rd to Little John Rd | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| S East St from Hoke St to MLK Jr Blvd | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| S NEW HOPE RD from EVA MAE DR to OLD POOLE RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| S NEW HOPE RD from ROCK QUARRY RD to WALNUT CREEKMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | C (inferred) | not published by the City | not published by the City | not published by the City |
| S NEW HOPE RD from WALNUT CREEK to EVA MAE DRMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| S SAUNDERS ST from LAKE WHEELER RD to S DAWSON STSidewalk Only | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | D (inferred) | not published by the City | not published by the City | not published by the City |
| S State St from E Lenoir St to MLK Jr Blvd | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| S WILMINGTON SERVICE RD from CHAPANOKE RD to TRYON RDCurb and Gutter | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | D (inferred) | not published by the City | not published by the City | not published by the City |
| S WILMINGTON SERVICE RD from TRYON RD to MECHANICAL BLVDCurb and Gutter | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | D (inferred) | not published by the City | not published by the City | not published by the City |
| S WILMINGTON ST from CHAPANOKE RD to TRYON RDSidewalk Only | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| S Wilmington St from Rush St to Chapanoke RdSidewalk Only | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | D (inferred) | not published by the City | not published by the City | not published by the City |
| SANDERFORD RD from CREECH RD to GRIFFIN CIRMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | C (inferred) | not published by the City | not published by the City | not published by the City |
| SAWMILL RD from PROSPECTOR PL to NORTHWAY CTSidewalk Only | Sidewalks | PlanningCity: PLANNED | A (inferred) | not published by the City | not published by the City | not published by the City |
| Scott Dr/ Donna Rd from End to N New Hope Rd | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| Seabrook Rd from Cross Link Rd to Quince Dr | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| SHADY GROVE-MOUNT HERMAN from ACC BLVD to LEESVILLE RD | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | E (inferred) | not published by the City | not published by the City | not published by the City |
| SHANTA from MILBURNIE to NEW BERN AVE | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | C (inferred) | not published by the City | not published by the City | not published by the City |
| Singleleaf Ln from Neuse Crossing Dr to Mitchell Mill Rd | Sidewalks | PlanningCity: PLANNED | B (inferred) | not published by the City | not published by the City | not published by the City |
| SKYCREST DR from BRENTWOOD RD to TRAWICK RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| SOUTHALL RD from HEATHERFIELD WAY to STILLMEADOW RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| SOUTHALL RD from SKYCREST DR to HEATHERFIELD WAYMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | not published by the City | not published by the City | not published by the City | not published by the City |
| SOUTHALL RD from STILLMEADOW RD to BUFFALOE RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| Southgate Dr/ Proctor Rd from Rock Quarry Rd to Red Quartz Dr | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| SPRING FOREST RD from LOUISBURG RD to FOX RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | not published by the City | not published by the City | not published by the City | not published by the City |
| ST ALBANS DR from WAKE FOREST RD to NEW HOPE CHURCH RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | A (inferred) | not published by the City | not published by the City | not published by the City |
| St James Church Rd from US 401 to Sue Ellen Dr | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| St Marys St from Hargett St to Hillsborough StSidewalk Only | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| Starmount Dr/ Baugh St from US 1 to Buffaloe Rd | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| State St from E Jones St to Oakwood Ave | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| STRICKLAND RD from LEESVILLE RD to RAY RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| STRICKLAND RD from RAY RD to CREEDMOOR RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | not published by the City | not published by the City | not published by the City | not published by the City |
| SUNNYBROOK RD from WOODMEADOW PKWY to ROCK QUARRY RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| SUNNYBROOK RD from WOODMEADOW PKWY to ROCK QUARRY RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| SUNNYBROOK RD from WOODMEADOW PKWY to ROCK QUARRY RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | C (inferred) | not published by the City | not published by the City | not published by the City |
| TARHEEL from SAINT ALBANS to HIGHWOODS | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | A (inferred) | not published by the City | not published by the City | not published by the City |
| THORNTON RD from WILD WOOD FOREST DR to 1200' EAST OF WILD WOOD FOREST DRMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| Timber Dr from Dennis Ave to Crabtree Blvd | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| TOWN AND COUNTRY RD from W MILLBROOK RD to LEAD MINE RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | A (inferred) | not published by the City | not published by the City | not published by the City |
| TRAILWOOD DR from S OF AVENT FERRY RD to AVENT FERRY RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | D (inferred) | not published by the City | not published by the City | not published by the City |
| TRAILWOOD DR from S OF CRUMP RD to S OF AVENT FERRY RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| TRAWICK RD from NEW BERN AVE to SKYCREST DRMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | not published by the City | not published by the City | not published by the City | not published by the City |
| TRAWICK RD from SKYCREST DR to MARSH CREEK RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| TRIANGLE TOWN BLVD from TOWN CENTER DR to I 540Sidewalk Only | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | B (inferred) | not published by the City | not published by the City | not published by the City |
| TRINITY RD from I 40 to NOWELL RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| TRYON RD from BRISK GALLOP WAY to GORMAN STSidewalk Only | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | D (inferred) | not published by the City | not published by the City | not published by the City |
| TRYON RD from DILLARD DR to BRISK GALLOP WAYSidewalk Only | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| TRYON RD from GARNER RD to DURHAM DRSidewalk Only | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | D (inferred) | not published by the City | not published by the City | not published by the City |
| Turnbridge Dr from Bellevue Rd to Bellevue Rd | Sidewalks | PlanningCity: FUNDED | E (inferred) | not published by the City | not published by the City | not published by the City |
| Valley Forge Dr from Valley Dr to Lynn Rd | Sidewalks | PlanningCity: PLANNED | A (inferred) | not published by the City | not published by the City | not published by the City |
| W MILLBROOK RD from LEESVILLE RD to STILL PINES DRSidewalk Only | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| W MILLBROOK RD from PONDEROSA RD to LEESVILLE RDSidewalk Only | Sidewalks | PlanningCity: PLANNED | A (inferred) | not published by the City | not published by the City | not published by the City |
| WADE AVE from GLENWOOD AVE to DANIELS STMajor Street Improvement | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| WAKE FOREST RD from MIMOSA ST to LOUISBURG RDSidewalk Only | Sidewalks | PlanningCity: PLANNED | C (inferred) | not published by the City | not published by the City | not published by the City |
| WATKINS RD from MITCHELL MILL RD to WATKINS TOWN RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| Weaver Dr/ Oak Park Rd from Duraleigh Rd to Glenwood Ave | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| Westborough Dr from Brumbley Pl to Glenwood Ave | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| WESTCHASE from WEST OF BLUE RIDGE to CARTER FINLEYSidewalk Only | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| WESTERN BLVD from BURTON AVE to JONES FRANKLIN RDCurb and Gutter | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| WESTINGHOUSE BLVD from CAPITAL BLVD to N RALEIGH BLVDSidewalk Only | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | C (inferred) | not published by the City | not published by the City | not published by the City |
| White Oak Rd from Anderson Rd to Alexander Rd | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| White Oak Rd from St Marys St to Anderson Dr | Sidewalks | PlanningCity: PLANNED | E (inferred) | not published by the City | not published by the City | not published by the City |
| WHITFIELD RD from BATTLE BRIDGE RD to ROCK QUARRY RDMajor Street Improvement | Sidewalks | PlanningCity: PLANNED - REDEVELOPMENT | not published by the City | not published by the City | not published by the City | not published by the City |
| Wild Dunes Dr from Eagle Trace Dr to Harbour Towne dr | Sidewalks | PlanningCity: PLANNED | B (inferred) | not published by the City | not published by the City | not published by the City |
| WILD WOOD FOREST DR from SANDY BANKS RD to WADFORD DRSidewalk Only | Sidewalks | PlanningCity: PLANNED | B (inferred) | not published by the City | not published by the City | not published by the City |
| Windjammer Dr from Bridgeport Dr to Strickland Rd | Sidewalks | PlanningCity: PLANNED | A (inferred) | not published by the City | not published by the City | not published by the City |
| Winthrop Dr from Hayden Ct to W Millbrook Rd | Sidewalks | PlanningCity: PLANNED | A (inferred) | not published by the City | not published by the City | not published by the City |
| Woods Pl/ Royal St from Method Rd to Hillsborough St | Sidewalks | PlanningCity: PLANNED | D (inferred) | not published by the City | not published by the City | not published by the City |
| YOUTH CENTER DR from HILLSBOROUGH ST to TRINITY RDCurb and Gutter | Sidewalks | PlanningCity: PLANNED | not published by the City | not published by the City | not published by the City | not published by the City |
| Battleford Dr - S from LYNN RD to PONDEROSA RD | Traffic calming | PlanningCity: Eligible Projects | A | not published by the City | not published by the City | not published by the City |
| Bedfordtown Dr from Falls River Ave to Falls River Ave | Traffic calming | PlanningCity: Eligible Projects | B | not published by the City | not published by the City | not published by the City |
| Big Sandy Dr from Haines Creek Ln to Clarks Fork Dr | Traffic calming | PlanningCity: Eligible Projects | B | not published by the City | not published by the City | not published by the City |
| Bivens Dr from Fox Rd to Sinclair Dr | Traffic calming | PlanningCity: Eligible Projects | B (inferred) | not published by the City | not published by the City | not published by the City |
| Bland Rd from Wake Forest Rd to St Albans Rd | Traffic calming | PlanningCity: Eligible Projects | A | not published by the City | not published by the City | not published by the City |
| Bluffridge Dr from Bridgeport Dr to Sawmill Rd | Traffic calming | PlanningCity: Eligible Projects | A | not published by the City | not published by the City | not published by the City |
| Brambleton Ave from Pearl Rd to Laurel Glen Dr | Traffic calming | PlanningCity: Eligible Projects | C | not published by the City | not published by the City | not published by the City |
| Canterbury Rd from Wade Ave to Cambridge Rd | Traffic calming | PlanningCity: Eligible Projects | E | not published by the City | not published by the City | not published by the City |
| Cedarhurst Dr from Falls of Neuse Rd to Quail Hollow Dr | Traffic calming | PlanningCity: Eligible Projects | A | not published by the City | not published by the City | not published by the City |
| Churchill Rd - E from Banbury Rd to Chester Rd | Traffic calming | PlanningCity: Eligible Projects | E | not published by the City | not published by the City | not published by the City |
| Churchill Rd - W from Ridge Rd to Dixie Trl | Traffic calming | PlanningCity: Eligible Projects | E (inferred) | not published by the City | not published by the City | not published by the City |
| Converse Dr from Compton Rd to Hardimont Rd | Traffic calming | PlanningCity: Eligible Projects | A | not published by the City | not published by the City | not published by the City |
| Country Trl from Pinecrest Rd to Marvino Ln | Traffic calming | PlanningCity: Eligible Projects | E | not published by the City | not published by the City | not published by the City |
| Coxindale Rd - W from Falls Valley Rd to Litchford Rd | Traffic calming | PlanningCity: Eligible Projects | A | not published by the City | not published by the City | not published by the City |
| Cub Trl from Durant Rd to Hiking Trl | Traffic calming | PlanningCity: Eligible Projects | B | not published by the City | not published by the City | not published by the City |
| Cyrus St from Ujamaa Dr to Burtons Barn St | Traffic calming | PlanningCity: Eligible Projects | C (inferred) | not published by the City | not published by the City | not published by the City |
| Dartmouth Rd - E from Windsor Pl to Converse Dr | Traffic calming | PlanningCity: Eligible Projects | A | not published by the City | not published by the City | not published by the City |
| Dominion Blvd from Cape Charles Dr to Leesville Rd | Traffic calming | PlanningCity: Eligible Projects | E | not published by the City | not published by the City | not published by the City |
| Drewry Ln from Anderson Dr to Landor Rd | Traffic calming | PlanningCity: Eligible Projects | E | not published by the City | not published by the City | not published by the City |
| E Hargett St from S East St to S Tarboro Rd | Traffic calming | PlanningCity: Eligible Projects | C | not published by the City | not published by the City | not published by the City |
| Easthampton Dr from Southall Rd to N New Hope Rd | Traffic calming | PlanningCity: Eligible Projects | C | not published by the City | not published by the City | not published by the City |
| Falls River Ave - 4 from Dunn Rd Traffic Circle to Bedfordtown Dr | Traffic calming | PlanningCity: Eligible Projects | B | not published by the City | not published by the City | not published by the City |
| Falls River Ave - 6 from Bedfordtown Dr to St Pauls Sq | Traffic calming | PlanningCity: Eligible Projects | B | not published by the City | not published by the City | not published by the City |
| Farm Gate Rd from Western Blvd to Buck Jones Rd | Traffic calming | PlanningCity: Eligible Projects | D | not published by the City | not published by the City | not published by the City |
| Finley Ridge Ln from Morrocroft Dr to Cub Trl | Traffic calming | PlanningCity: Eligible Projects | B | not published by the City | not published by the City | not published by the City |
| Fox Hollow Dr from Sanderford Rd to Creech Rd | Traffic calming | PlanningCity: Eligible Projects | C | not published by the City | not published by the City | not published by the City |
| Glen Burnie Dr from Wycliff Rd to Morningside Dr | Traffic calming | PlanningCity: Eligible Projects | E | not published by the City | not published by the City | not published by the City |
| Glendower Rd - M from Leesville Rd to Lynn Rd | Traffic calming | PlanningCity: Eligible Projects | E (inferred) | not published by the City | not published by the City | not published by the City |
| Glendower Rd - N from Leesville Rd to Tylerton St | Traffic calming | PlanningCity: Eligible Projects | E | not published by the City | not published by the City | not published by the City |
| Grant Ave from Canterbury Rd to Chester Rd | Traffic calming | PlanningCity: Eligible Projects | E | not published by the City | not published by the City | not published by the City |
| Halifax St from Peace St to Cedar St | Traffic calming | PlanningCity: Eligible Projects | C (inferred) | not published by the City | not published by the City | not published by the City |
| Hiking Trl from Halfhitch Trl to Tenderfoot Trl | Traffic calming | PlanningCity: Eligible Projects | B | not published by the City | not published by the City | not published by the City |
| Hollyridge Dr from Glenwood Ave to Oak Park Dr | Traffic calming | PlanningCity: Eligible Projects | E | not published by the City | not published by the City | not published by the City |
| Hopper St from Forestville Rd to Pinkham Way | Traffic calming | PlanningCity: Eligible Projects | B | not published by the City | not published by the City | not published by the City |
| Horseback Ln from Arsenal Dr to Offshore Dr | Traffic calming | PlanningCity: Eligible Projects | C | not published by the City | not published by the City | not published by the City |
| Hoyle Dr from Brockton Dr to E Millbrook Rd | Traffic calming | PlanningCity: Eligible Projects | A | not published by the City | not published by the City | not published by the City |
| Hunting Ridge Rd - W from Falls of Neuse Rd to Lone Oak Pl | Traffic calming | PlanningCity: Eligible Projects | A | not published by the City | not published by the City | not published by the City |
| Idlewood Village Dr from Sanderford Rd to End | Traffic calming | PlanningCity: Eligible Projects | C | not published by the City | not published by the City | not published by the City |
| Kilcullen Dr - W from Hoyle Dr to Green Rd | Traffic calming | PlanningCity: Eligible Projects | A | not published by the City | not published by the City | not published by the City |
| Leslieshire Dr from Hawksmoor Dr to Durant Rd | Traffic calming | PlanningCity: Eligible Projects | B | not published by the City | not published by the City | not published by the City |
| Lewis Farm Rd - W from Ridge Rd to Banbury Rd | Traffic calming | PlanningCity: Eligible Projects | E | not published by the City | not published by the City | not published by the City |
| Massey Preserve Trl from Cashew Dr to Forestville Rd | Traffic calming | PlanningCity: Eligible Projects | B | not published by the City | not published by the City | not published by the City |
| McMakin St from Garner Rd to End | Traffic calming | PlanningCity: Eligible Projects | C | not published by the City | not published by the City | not published by the City |
| Mellow Field Dr from E Six Forks Rd to Ratchford Dr | Traffic calming | PlanningCity: Eligible Projects | C | not published by the City | not published by the City | not published by the City |
| Monument Ln from Old Lead Mine Rd to Six Forks Rd | Traffic calming | PlanningCity: Eligible Projects | A | not published by the City | not published by the City | not published by the City |
| N Radner Way - N from New Leesville Blvd to Harrington Grove Dr | Traffic calming | PlanningCity: Eligible Projects | E (inferred) | not published by the City | not published by the City | not published by the City |
| Neuse Wood Dr from Wild Wood Forest Dr to Big Sandy Dr | Traffic calming | PlanningCity: Eligible Projects | B | not published by the City | not published by the City | not published by the City |
| Offshore Dr from Battle Bridge Rd to Resting Grove Rd | Traffic calming | PlanningCity: Eligible Projects | C | not published by the City | not published by the City | not published by the City |
| Old Deer Trl from N of Old Well Ln to Mourning Dove Rd | Traffic calming | PlanningCity: Eligible Projects | A | not published by the City | not published by the City | not published by the City |
| Old Farm Rd from Bashford Rd to Buck Jones Rd | Traffic calming | PlanningCity: Eligible Projects | D | not published by the City | not published by the City | not published by the City |
| Peyton St from Belmont Dr to Martin Luther King Jr Blvd | Traffic calming | PlanningCity: Eligible Projects | C | not published by the City | not published by the City | not published by the City |
| Pike Rd from Hilburn Dr to Leesville Rd | Traffic calming | PlanningCity: Eligible Projects | E | not published by the City | not published by the City | not published by the City |
| Pinecroft Dr from Lakemont St to Latimer Rd | Traffic calming | PlanningCity: Eligible Projects | A | not published by the City | not published by the City | not published by the City |
| Quail Hollow Dr from E Millbrook Rd to Hardimont Rd | Traffic calming | PlanningCity: Eligible Projects | A | not published by the City | not published by the City | not published by the City |
| Quitman Trl - E from Marshlane Way to Mackinac Island Ln | Traffic calming | PlanningCity: Eligible Projects | C | not published by the City | not published by the City | not published by the City |
| Rainwater Rd - S from Spring Forest Rd to Hunting Ridge Rd | Traffic calming | PlanningCity: Eligible Projects | A | not published by the City | not published by the City | not published by the City |
| Running Cedar Trl from Old Deer Trl to Strickland Rd | Traffic calming | PlanningCity: Eligible Projects | A | not published by the City | not published by the City | not published by the City |
| Sporting Club Dr from Arnold Palmer Dr to TW Alexander Dr | Traffic calming | PlanningCity: Eligible Projects | E | not published by the City | not published by the City | not published by the City |
| Stony Moss Dr/Samuel St from Sungate Blvd to Bridgeville Rd | Traffic calming | PlanningCity: Eligible Projects | C | not published by the City | not published by the City | not published by the City |
| Summerton Dr from Falls River Ave to Whittington Dr | Traffic calming | PlanningCity: Eligible Projects | B | not published by the City | not published by the City | not published by the City |
| Tanbark Way from Harps Mill Rd to Hunting Ridge Rd | Traffic calming | PlanningCity: Eligible Projects | A | not published by the City | not published by the City | not published by the City |
| Tanglewood Pine Ln from Old Poole Rd to Kavkaz St | Traffic calming | PlanningCity: Eligible Projects | C | not published by the City | not published by the City | not published by the City |
| Thoughtful Spot Way from Falls River Ave to Wake Bluff Dr | Traffic calming | PlanningCity: Eligible Projects | B | not published by the City | not published by the City | not published by the City |
| Timber Ridge Dr from Spring Forest Rd to Forest Oaks Dr | Traffic calming | PlanningCity: Eligible Projects | A | not published by the City | not published by the City | not published by the City |
| Tylerton Dr from Leesville Rd to Grayson Ridge Ct | Traffic calming | PlanningCity: Eligible Projects | E | not published by the City | not published by the City | not published by the City |
| Valley Dr from Sawmill Rd to Lynn Rd | Traffic calming | PlanningCity: Eligible Projects | A | not published by the City | not published by the City | not published by the City |
| Weaver Dr from Duraleigh Rd to Oak Park Dr | Traffic calming | PlanningCity: Eligible Projects | E | not published by the City | not published by the City | not published by the City |
| Westbrook Dr from Six Forks Rd to Brookhollow Dr | Traffic calming | PlanningCity: Eligible Projects | A | not published by the City | not published by the City | not published by the City |
| Wild Dunes Dr from Eagle Trace Dr to Harbor Towne Dr | Traffic calming | PlanningCity: Eligible Projects | B | not published by the City | not published by the City | not published by the City |
| Wilderness Rd from Ray Rd to Lynn Rd | Traffic calming | PlanningCity: Eligible Projects | A | not published by the City | not published by the City | not published by the City |
| Windel Dr from Six Forks Rd to Farley Dr | Traffic calming | PlanningCity: Eligible Projects | A | not published by the City | not published by the City | not published by the City |
| Winthrop Dr - S from W Millbrook Rd to Rembert Dr | Traffic calming | PlanningCity: Eligible Projects | E | not published by the City | not published by the City | not published by the City |
| Woodmeadow Pkwy - S from Sunnybrook Dr to End | Traffic calming | PlanningCity: Eligible Projects | C | not published by the City | not published by the City | not published by the City |
| Woods Ream Dr from Six Forks Rd to Sandy Forks Rd | Traffic calming | PlanningCity: Eligible Projects | A | not published by the City | not published by the City | not published by the City |
| Yadkin Dr - M from Northbrook Dr to Currituck Dr | Traffic calming | PlanningCity: Eligible Projects | A | not published by the City | not published by the City | not published by the City |
| Yadkin Dr - S from Alamance Dr to Currituck Dr | Traffic calming | PlanningCity: Eligible Projects | A, E | not published by the City | not published by the City | not published by the City |
| Yucca Trl from Hiking Trl to Coxingdale Dr | Traffic calming | PlanningCity: Eligible Projects | B | not published by the City | not published by the City | not published by the City |
| Biltmore Hills (Crosslink Master Plan)Update to Biltmore Hills Park including integration of the crosslink property | Parks and greenways | Planning | C (inferred) | PRCR Parks | Emma Liles | not published by the City |
| Pigeon House Branch Trail | Parks and greenways | PlanningCity: Preliminary Planning | C (inferred) | Transportation - PRCR | not published by the City | not published by the City |
How to read this list
-
Completed and closed projects are left out, so the list shows what is still to come. The capital
improvement lists carry no dates at all, so a project finished last month looks the same there as one
finished years ago. By program, these statuses are left out:
- Capital improvement projects: complete, closed, unknown, no status.
- Vision Zero safety: Completed, Removed.
- Sidewalks: COMPLETE, COMPLETE - ONE SIDE, EXISTING, REMOVED.
- Traffic calming: complete, failed.
- Parks and greenways: Not funded, no status.
- Housing bond: Complete.
- Status is one of planning, design, construction, with the City's own wording beside it when that says more. Design also covers buying right of way, permits, and the approvals just before construction.
- District is the council district the City records on the project. Where it records none, the district is inferred from the project's point on the map and marked inferred (656 projects). A dash means neither is known, usually because the point lies outside every council district.
- The City keeps two lists of capital improvement projects. The second repeats part of the first and adds a project manager, so each project is shown once.
- Only the housing bond list publishes money: the bond funds the City has committed. The other lists publish no budget, so they show a dash.
- A project can appear under two programs when the City lists it in both.
Capital improvement projects: as of Sep 28, 2026, 10:37 AM. The City last edited this layer on Sep 27, 2026.
Capital improvement projects with a named manager: as of Sep 28, 2026, 10:37 AM. The City last edited this layer on Sep 27, 2026.
Vision Zero safety projects: as of Sep 28, 2026, 10:37 AM. The City last edited this layer on Jun 30, 2026.
Sidewalk capital program: as of Sep 28, 2026, 10:37 AM. The City last edited this layer on Jun 10, 2026.
Traffic calming (NTMP) projects: as of Sep 28, 2026, 10:37 AM. The City last edited this layer on Jun 1, 2026.
Parks capital projects: as of Sep 28, 2026, 10:37 AM. The City last edited this layer on Sep 18, 2026.
Housing bond projects: as of Sep 28, 2026, 10:37 AM. The City last edited this layer on Sep 16, 2026.
Council districts and base map: as of Sep 28, 2026, 6:43 AM.