> Roads, sidewalks, traffic calming, parks, water lines and bond-funded housing that the City of Raleigh is planning, designing or building.

- Capital improvement projects: as of Sep 28, 2026, 10:37 AM. The City last edited this layer on Sep 27, 2026.
- Capital improvement projects with a named manager: as of Sep 28, 2026, 10:37 AM. The City last edited this layer on Sep 27, 2026.
- Vision Zero safety projects: as of Sep 28, 2026, 10:37 AM. The City last edited this layer on Jun 30, 2026.
- Sidewalk capital program: as of Sep 28, 2026, 10:37 AM. The City last edited this layer on Jun 10, 2026.
- Traffic calming (NTMP) projects: as of Sep 28, 2026, 10:37 AM. The City last edited this layer on Jun 1, 2026.
- Parks capital projects: as of Sep 28, 2026, 10:37 AM. The City last edited this layer on Sep 18, 2026.
- Housing bond projects: as of Sep 28, 2026, 10:37 AM. The City last edited this layer on Sep 16, 2026.
- Council districts and base map: as of Sep 28, 2026, 6:43 AM.

## Programs

| Program | Projects | Planning | Design | Construction | City's last edit |
| --- | --- | --- | --- | --- | --- |
| Capital improvement projects | 406 | 104 | 218 | 84 | Sep 27, 2026 |
| Vision Zero safety | 77 | 41 | 21 | 15 | Jun 30, 2026 |
| Sidewalks | 380 | 329 | 29 | 22 | Jun 10, 2026 |
| Traffic calming | 126 | 77 | 49 | 0 | Jun 1, 2026 |
| Parks and greenways | 12 | 2 | 8 | 2 | Sep 18, 2026 |
| Housing bond | 18 | 0 | 8 | 10 | Sep 16, 2026 |

## Projects

1,019 projects, construction first, then design, then planning.

| Project | Program | Status | District | Department | Manager | Money committed | Description |
| --- | --- | --- | --- | --- | --- | --- | --- |
| 2021 Zebulon Waterline Lining | Capital improvement projects | Construction | — | Raleigh Water | Justin Biegler | — | — |
| [2024 Pipe Rehabilitation](https://raleighnc.gov/projects/stormwater-infrastructure-rehabilitation-project) | Capital improvement projects | Construction | C; inferred | Stormwater | Claudia White | — | — |
| Aerial Crossing Replacements FY16 | Capital improvement projects | Construction | — | Raleigh Water | Justin Biegler | — | — |
| Aerial Crossing Replacements FY17- (South State St., Banbury Rd., Woodrow St.) | Capital improvement projects | Construction | C; inferred | Raleigh Water | Justin Biegler | — | — |
| Ashland Street Drainage Improvements | Capital improvement projects | Construction | E; inferred | Stormwater | — | — | — |
| [Atkins & Canterbury Waterline Replacement](https://raleighnc.gov/projects/atkins-canterbury-waterline-replacement) | Capital improvement projects | Construction | D; inferred | Raleigh Water | Justin Biegler | — | — |
| [Atlantic Avenue Multimodal Widening](https://raleighnc.gov/projects/atlantic-avenue-improvement-project) | Capital improvement projects | Construction | A; inferred | Transportation | Nabil Hasan | — | — |
| [Baileywick Park Improvements](https://www.raleighnc.gov/parks/content/ParksRec/Articles/Projects/BaileywickPark.html) | Capital improvement projects | Construction | A; inferred | Parks, Recreation & Cultural Resources | Lora Greco, PLA, ASLA | — | — |
| [Barwell Road South Multimodal Widening](https://raleighnc.gov/home/content/PWksDesignConst/Articles/BarwellRoadProject.html) | Capital improvement projects | Construction | — | Transportation | Jaykumar Shah | — | — |
| Bells Valley Stream Stabilization | Capital improvement projects | Construction | E; inferred | Stormwater | — | — | — |
| [Big Branch Interceptor Improvements](https://raleighnc.gov/services/content/PubUtilAdmin/Articles/Projects/CIP/BigBranchInterceptor.html) | Capital improvement projects | Construction | E; inferred | Raleigh Water | Matt Cotton | — | — |
| [Blue Ridge Rd & Bridge Bike/Ped](https://raleighnc.gov/projects/blue-ridge-road-bike-ped-improvement-project) | Capital improvement projects | Construction | D; inferred | Transportation | Sam Brewer | — | — |
| Blue Ridge Road | Capital improvement projects | Construction | E; inferred | Raleigh Water | Janeen Goodwin | — | — |
| [Blue Ridge Road Multimodal Widening](https://raleighnc.gov/projects/blue-ridge-road-bike-ped-improvement-project) | Capital improvement projects | Construction | E; inferred | Transportation | Sam Brewer | — | — |
| [Blue Ridge Road Pedestrian Bike Bridge](https://raleighnc.gov/projects/blue-ridge-road-bike-ped-improvements-project) | Capital improvement projects | Construction | D; inferred | Raleigh Water | Breanne Wood | — | — |
| Brier Creek Pump Station Upgrades | Capital improvement projects | Construction | — | Raleigh Water | Dan Williams | — | — |
| [BRT - New Bern Avenue Improvements](https://raleighnc.gov/projects/wake-brt-new-bern-avenue-design-and-construction) | Capital improvement projects | Construction | C; inferred | Transportation | Aya Aldais | — | — |
| [Capital Blvd Sidewalks](https://raleighnc.gov/projects/capital-boulevard-sidewalks) | Capital improvement projects | Construction | A; inferred | Transportation | Jay shah | — | — |
| [Carolina Pines Avenue Multimodal Widening](https://raleighnc.gov/projects/carolina-pines-avenue-improvement-project) | Capital improvement projects | Construction | D; inferred | Transportation | Lichuan Wang | — | — |
| [Crabtree Creek Improvements at Raleigh Blvd](https://raleighnc.gov/projects/crabtree-creek-trail-improvements-raleigh-boulevard) | Capital improvement projects | Construction | C; inferred | Parks, Recreation & Cultural Resources | David P Bender | — | — |
| [Crabtree Creek West Trail](https://www.raleighnc.gov/parks/content/ParksRec/Articles/Projects/CrabtreeCreekWest.html) | Capital improvement projects | Construction | — | Parks, Recreation & Cultural Resources | Lisa Schiffbauer | — | — |
| DEB 532Z 6 MGD Pump | Capital improvement projects | Construction | — | Raleigh Water | Dan Williams | — | — |
| DEB WTP Warehouse | Capital improvement projects | Construction | — | Raleigh Water | Vinod Korategere | — | — |
| [Dix Park Plaza Play](https://dixpark.org/park-planning) | Capital improvement projects | Construction | D; inferred | Parks, Recreation & Cultural Resources | Grayson Maughan | — | — |
| [Durant Nature Preserve Stream Restoration](https://raleighnc.gov/projects/durant-nature-preserve-stormwater-improvements) | Capital improvement projects | Construction | B; inferred | Stormwater | Kyle Bucher | — | — |
| Durant Road Grade Separation | Capital improvement projects | Construction | B; inferred | Raleigh Water | Matt Cotton | — | — |
| [E Millbrook Rd Sidewalk](https://raleighnc.gov/projects/east-millbrook-road-sidewalk-project) | Capital improvement projects | Construction | B; inferred | Transportation | Jay Shah | — | — |
| [EMJ Drinking Water Lab](https://raleighnc.gov/projects/em-johnson-water-treatment-plant-drinking-water-laboratory) | Capital improvement projects | Construction | — | Raleigh Water | Courtney Licata | — | — |
| EMJ WTP Generator Expansion Phase 2 | Capital improvement projects | Construction | B; inferred | Raleigh Water | Vinod Korategere | — | — |
| EMJWTP North South Basin Rehabilitation | Capital improvement projects | Construction | B; inferred | Raleigh Water | Ed Stempien | — | — |
| Filter Media Maintenance | Capital improvement projects | Construction | B; inferred | Raleigh Water | Ed Stempien | — | — |
| Fire Station 26 Asphalt/Concrete Repair and Replacement | Capital improvement projects | Construction | C; inferred | Fire | Alex Shapiro | — | — |
| Flocc & Sed Basins 1-4 | Capital improvement projects | Construction | B; inferred | Raleigh Water | Ed Stempien | — | — |
| Fluoride and Sodium Hypochlorite Tank Replacement DEB and EMJ | Capital improvement projects | Construction | — | Raleigh Water | Courtney Licata | — | — |
| Galvanized Service Replacement Contract 1 | Capital improvement projects | Construction | B; inferred | Raleigh Water | Todd Toler | — | — |
| Galvanized Service Replacement Contract 2 | Capital improvement projects | Construction | B; inferred | Raleigh Water | Todd Toler | — | — |
| Glen Eden Playground | Capital improvement projects | Construction | E; inferred | Parks, Recreation & Cultural Resources | — | — | — |
| Glenbrook/Dacian Stormwater Improvements | Capital improvement projects | Construction | C; inferred | Stormwater | Todd Rall | — | — |
| Glenwood - Lane Signal | Capital improvement projects | Construction | D; inferred | Transportation | — | — | — |
| [John Chavis Memorial Park Improvements](https://raleighnc.gov/projects/bridge-structure-37-and-88-replacement-projects) | Capital improvement projects | Construction | C; inferred | Parks, Recreation & Cultural Resources | David P Bender (PRCR) Jacob Ray (RDC) | — | — |
| Keeter Training Center Paving Replacement | Capital improvement projects | Construction | D; inferred | Fire | Alexander Shapiro | — | — |
| [Lake Boone Trail Safety Improvements](https://raleighnc.gov/projects/lake-boone-trail-safety-improvements) | Capital improvement projects | Construction | E; inferred | Transportation | Keith Tew | — | — |
| [Lake Wheeler Road - North](https://raleighnc.gov/projects/lake-wheeler-road-improvement-project) | Capital improvement projects | Construction | D; inferred | Transportation | Riska Dees | — | — |
| Laurel Hills Community Center Renovation | Capital improvement projects | Construction | E; inferred | Parks, Recreation & Cultural Resources | David Delcambre | — | — |
| [Laurel Manor Court](https://raleighnc.gov/projects) | Capital improvement projects | Construction | E; inferred | Stormwater | Todd Rall | — | — |
| [Law Enforcement Training Center](https://raleighnc.gov/projects/law-enforcement-training-center) | Capital improvement projects | Construction | — | Police | Bill Black | — | — |
| [Ligon Mill Road Bridge at Smith Creek](https://www.wakeforestnc.gov/transportation/transportation-projects/ligon-mill-road-underpass) | Capital improvement projects | Construction | — | Raleigh Water | Breanne Wood | — | — |
| Manhole Rehab/ CIPP liner from pole camera | Capital improvement projects | Construction | — | Raleigh Water | Unknown | — | — |
| [Maywood Ave Sidewalks](https://raleighnc.gov/projects/maywood-avenue-sidewalk-project) | Capital improvement projects | Construction | D; inferred | Transportation | Jay Shah | — | — |
| [Navaho Drive Sidewalk](https://raleighnc.gov/projects/navaho-drive-sidewalk-project) | Capital improvement projects | Construction | A; inferred | Transportation | Benjamin Possiel | — | — |
| NCDOT U-5748 Louisburg Rd/Ligon Mill (AECOM) | Capital improvement projects | Construction | — | Raleigh Water | Todd Toler | — | — |
| NCDOT-B-5326 Raynor Rd. over White Oak Creek | Capital improvement projects | Construction | — | Raleigh Water | Todd Toler | — | — |
| [New Hope Rd Sidewalks](https://raleighnc.gov/projects/new-hope-road-sidewalk-project) | Capital improvement projects | Construction | B; inferred | Transportation | Jay Shah | — | — |
| NRRRF Anaerobic Digesters THP CHP | Capital improvement projects | Construction | — | Raleigh Water | Ed Stempien | — | — |
| NRRRF Caustic Feed Facility | Capital improvement projects | Construction | — | Raleigh Water | Kristen Pierce | — | — |
| Nutrient Mitigation Banking Instrument | Capital improvement projects | Construction | — | Raleigh Water | Matt Cotton | — | — |
| [Oberlin Road Streetscape](https://raleighnc.gov/home/content/PWksDesignConst/Articles/OberlinRoadStreetScape.html) | Capital improvement projects | Construction | D; inferred | Transportation | Jaykumar Shah | — | — |
| Ortho-Phosphate Building | Capital improvement projects | Construction | B; inferred | Raleigh Water | Matt Cotton | — | — |
| Orthophosphate Storage & Feed (EMJ & DEB) & CO at DEB | Capital improvement projects | Construction | — | Raleigh Water | Matt Cotton | — | — |
| [Oxford Road Sidewalk Project](https://raleighnc.gov/projects/oxford-road-sidewalk-project) | Capital improvement projects | Construction | E; inferred | Transportation | Diana Deadmore | — | — |
| [Poole Road Widening](https://raleighnc.gov/home/content/PWksDesignConst/Articles/PooleRoadWideningProject.html) | Capital improvement projects | Construction | — | Transportation | Sylvester Percival | — | — |
| Priority 1 Pump Station Upgrades | Capital improvement projects | Construction | — | Raleigh Water | Justin Biegler | — | — |
| River Towne Offisite Utilities | Capital improvement projects | Construction | — | Raleigh Water | Justin Biegler | — | — |
| SCADA Upgrade | Capital improvement projects | Construction | — | Raleigh Water | Perry Allen | — | — |
| [Scotland Street Sidewalk](https://raleighnc.gov/projects/scotland-street-improvement-project) | Capital improvement projects | Construction | E; inferred | Transportation | Mukund Moghe | — | — |
| Shelley Lake Comfort Station | Capital improvement projects | Construction | A; inferred | Parks, Recreation & Cultural Resources | Carlos Reyes | — | — |
| Sludge Debris Drying Beds | Capital improvement projects | Construction | — | Raleigh Water | Ed Stempien | — | — |
| Smith Creek WWTP Influent Screening, Pumping, and Grit Removal Impvs. | Capital improvement projects | Construction | — | Raleigh Water | Janeen Goodwin | — | — |
| [Spring Forest Rd Sidewalks](https://raleighnc.gov/projects/spring-forest-road-sidewalks) | Capital improvement projects | Construction | A; inferred | Transportation | jay Shah | — | — |
| Spring Park Playground Renovation | Capital improvement projects | Construction | D; inferred | Parks, Recreation & Cultural Resources | — | — | — |
| State Street Basin Sanitary Sewer and Water Improvements Phase 3A | Capital improvement projects | Construction | C; inferred | Raleigh Water | Todd Toler | — | — |
| State Street Water and Sewer Improvements Phase 1 | Capital improvement projects | Construction | C; inferred | Raleigh Water | Todd Toler | — | — |
| Summerton Drive Drainage Improvements - DA | Capital improvement projects | Construction | B; inferred | Stormwater | — | — | — |
| [Trenton Road Connector Project](https://raleighnc.gov/parks/content/ParksRec/Articles/Projects/CrabtreeCreekTrailImprovementsAtLassiterMillRoadPlanning.html) | Capital improvement projects | Construction | D; inferred | Parks, Recreation & Cultural Resources | — | — | — |
| Upper Pigeon House Interceptor Improvements from Wade to Wake Forest Rd. | Capital improvement projects | Construction | C; inferred | Raleigh Water | Todd Toler | — | — |
| Upper Walnut Creek Interceptor Rehabilitation | Capital improvement projects | Construction | C; inferred | Raleigh Water | Ed Stempien | — | — |
| [Upper West Neuse Interceptor](https://raleighnc.gov/projects/upper-west-neuse-interceptor) | Capital improvement projects | Construction | B; inferred | Raleigh Water | Julie Parham | — | — |
| [US 70 / Westgate Waterline](https://raleighnc.gov/projects/us-70-westgate-waterline-project) | Capital improvement projects | Construction | E; inferred | Raleigh Water | Kristen Pierce | — | — |
| Vandora Springs Rd. Improvements | Capital improvement projects | Construction | — | Raleigh Water | Janeen Goodwin | — | — |
| [Wade Ave Sidewalks](https://raleighnc.gov/projects/wade-avenue-sidewalk-project) | Capital improvement projects | Construction | D; inferred | Transportation | Jaykumar Shah | — | — |
| [Wake Forest Rd Sidewalk](https://raleighnc.gov/projects/wake-forest-road-sidewalk-project) | Capital improvement projects | Construction | E; inferred | Transportation | Jaykumar Shah | — | — |
| Water Tank Rehabilitation and Maintenance Contract | Capital improvement projects | Construction | B; inferred | Raleigh Water | Julie Parham | — | — |
| [Wooten Meadow Park](https://www.raleighnc.gov/parks/content/ParksRec/Articles/Projects/WootenMeadowMP.html) | Capital improvement projects | Construction | E; inferred | Parks, Recreation & Cultural Resources | Gary Claiborne | — | — |
| Worthdale Park Stream Restoration and Stormwater Improvements | Capital improvement projects | Construction | C; inferred | Stormwater | — | — | — |
| Blount St (Go Raleigh Station/Moore Square) | Vision Zero safety | Construction; City: Under Construction | C | — | — | — | Install RRFBs and install flexible delineators to enforce "No Parking" areas. |
| Blount-Bragg | Vision Zero safety | Construction; City: Under Construction | C | — | — | — | Install RRFBs and a new midblock crosswalk across Blount St. |
| Bragg - Person | Vision Zero safety | Construction; City: Under Construction | C | — | — | — | Install RRFBs and a new midblock crosswalk across Person St. |
| Collonade Center - Forum - Six Forks | Vision Zero safety | Construction; City: Under Construction | A | — | — | — | FY 2024 Signal Upgrades: Install Accessible Pedestrian Signals. Install 4 new Bimodal Flashing Yellow Arrow left turn signals and 4 new 3-section signals. |
| Common Oaks - Forest Pines | Vision Zero safety | Construction; City: Under Construction | B | — | — | — | Convert intersection to All Way stop. |
| Creedmoor - Edwards Mill - Mill Village - Parklake | Vision Zero safety | Construction; City: Under Construction | E | — | — | — | FY 2024 Signal Upgrades: Install Accessible Pedestrian Signals and program Leading Pedestrian Interval. Install high-visibility crosswalk across Mill Village. |
| Glenwood & Lane | Vision Zero safety | Construction; City: Under Construction | D | — | — | — | Signalize intersection. |
| Gorman - Marcom | Vision Zero safety | Construction; City: Under Construction | D | — | — | — | FY 2024 Signal Upgrades: Install Accessible Pedestrian Signals and program Leading Pedestrian Interval |
| HAWK at Lead Mine - Shadyside | Vision Zero safety | Construction; City: Under Construction | A | — | — | — | FY 2024 Signal Upgrades: Install Accessible Pedestrian Signals. |
| Hilburn Drive Academy Frontage | Vision Zero safety | Construction; City: Under Construction | E | — | — | — | Reconfigure lanes and shorten crosswalk or alternative treatment at crosswalk. |
| Navaho - Wake Forest | Vision Zero safety | Construction; City: Under Construction | A | — | — | — | FY 2024 Signal Upgrades: Install pedestrian signals. Install 2 flashing yellow arrow 4-section left turn signals. Install 2 new 3-section signals. Install 2 detection loops. |
| Oberlin Rd (Oberlin Middle Driveway) | Vision Zero safety | Construction; City: Under Construction | E | — | — | — | Install RRFBs at existing midblock crosswalk. |
| Old Wake Forest Rd, east of intersection with Falls of Neuse / Wake Forest | Vision Zero safety | Construction; City: Under Construction | A | — | — | — | Install signal ahead sign, curve warning sign, and straighten new Chevrons. |
| Ridge - Ridgecrest | Vision Zero safety | Construction; City: Under Construction | E | — | — | — | Install RRFBs. |
| Wilmington St (Shaw) | Vision Zero safety | Construction; City: Under Construction | C | — | — | — | Install RRFBs at existing midblock crosswalk. |
| ATLANTIC AVE from OLD LOUISBURG RD to NEW HOPE CHURCH RD | Sidewalks | Construction; City: UNDER CONSTRUCTION | A; inferred | — | — | — | Major Street Improvement |
| BLUE RIDGE RD from BERYL to FABER DR | Sidewalks | Construction; City: UNDER CONSTRUCTION | D; inferred | — | — | — | Sidewalk Only |
| BLUE RIDGE RD from HILLSBOROUGH ST to TRINITY RD | Sidewalks | Construction; City: UNDER CONSTRUCTION | — | — | — | — | Major Street Improvement |
| BLUE RIDGE RD from Homewood Banks Dr to GLENWOOD | Sidewalks | Construction; City: UNDER CONSTRUCTION | E; inferred | — | — | — | Major Street Improvement |
| BLUE RIDGE RD from TRINITY RD to WILLIAM MOORE DR | Sidewalks | Construction; City: UNDER CONSTRUCTION | — | — | — | — | Major Street Improvement |
| BLUE RIDGE RD from WILLIAM MOORE DR to DISTRICT DR | Sidewalks | Construction; City: UNDER CONSTRUCTION | D; inferred | — | — | — | Major Street Improvement |
| CAPITAL BLVD from I-440 to BRENTWOOD | Sidewalks | Construction; City: UNDER CONSTRUCTION | A; inferred | — | — | — | NOT DUPLICATE OF 110 |
| CAPITAL BLVD from I-440 to BRENTWOOD | Sidewalks | Construction; City: UNDER CONSTRUCTION | C; inferred | — | — | — | Sidewalk Only |
| CAROLINA PINES AVE from S SAUNDERS ST to LAKE WHEELER RD | Sidewalks | Construction; City: UNDER CONSTRUCTION | D; inferred | — | — | — | Major Street Improvement |
| DIXIE FOREST RD from LITCHFORD RD to SPRING FOREST RD | Sidewalks | Construction; City: UNDER CONSTRUCTION | A; inferred | — | — | — | Curb and Gutter |
| E MILLBROOK from ATLANTIC to WALLINGFORD | Sidewalks | Construction; City: UNDER CONSTRUCTION | A; inferred | — | — | — | RAIL GRADE SEPARATION |
| HILLSBOROUGH ST from BLUE RIDGE RD to CHAPEL HILL RD | Sidewalks | Construction; City: UNDER CONSTRUCTION | E; inferred | — | — | — | Major Street Improvement |
| MAYWOOD from LAKE WHEELER RD to SAUNDERS | Sidewalks | Construction; City: UNDER CONSTRUCTION | D; inferred | — | — | — | Sidewalk Only |
| N NEW HOPE RD from CAPITAL BLVD to ATLANTIC | Sidewalks | Construction; City: UNDER CONSTRUCTION | A; inferred | — | — | — | Sidewalk Only |
| N NEW HOPE RD from CAPITAL BLVD to WALLINGFORD DR | Sidewalks | Construction; City: UNDER CONSTRUCTION | B; inferred | — | — | — | Sidewalk Only |
| NEW BERN AVE from ST AUGUSTINE AVE to SUNNYBROOK RD | Sidewalks | Construction; City: UNDER CONSTRUCTION | C; inferred | — | — | — | Major Street Improvement |
| OLD WAKE FOREST from LITCHFORD to RURITANIA | Sidewalks | Construction; City: UNDER CONSTRUCTION | A; inferred | — | — | — | Major Street Improvement |
| SCOTLAND from BEAUFORT to LASSITER MILL | Sidewalks | Construction; City: UNDER CONSTRUCTION | E; inferred | — | — | — | Curb and Gutter |
| SPRING FOREST from MACHINES to CAPITAL | Sidewalks | Construction; City: UNDER CONSTRUCTION | B; inferred | — | — | — | Major Street Improvement |
| WADE AVE from HOBSON to DANIELS | Sidewalks | Construction; City: UNDER CONSTRUCTION | E; inferred | — | — | — | — |
| WAKE FOREST RD from HODGES to WHITAKER MILL RD | Sidewalks | Construction; City: UNDER CONSTRUCTION | E; inferred | — | — | — | Sidewalk Only |
| WESTERN BLVD from BLUE RIDGE RD to CHANEY RD | Sidewalks | Construction; City: UNDER CONSTRUCTION | D; inferred | — | — | — | Major Street Improvement |
| [Crabree Creek at Lassiter Mill](https://raleighnc.gov/projects/crabtree-creek-trail-improvements-lassiter-mill-road) | Parks and greenways | Construction | E; inferred | PRCR Greenways | Lexi Yates/ Noah Otto | — | Trail Improvements between Lassiter Mill Rd and Hertford St |
| [Structure Replacements](https://raleighnc.gov/projects/pedestrian-bridge-improvements) | Parks and greenways | Construction | A; inferred | PRCR Greenways | Mark Heinicke | — | Decking replacement of Structures 102 and 103, 17, 6 and 7 |
| Barton Oaks (Fka Strickland Apartments) | Housing bond | Construction; City: Under Construction | E | — | — | $3,600,000 | LIHTC Gap Financing |
| Biltmore Hills | Housing bond | Construction; City: Under Construction | C | — | — | $1,440,000 | Public Private Partnerships |
| Burrell Lofts (fka Hoke Street Apartments) | Housing bond | Construction; City: Under Construction | C | — | — | $1,587,500 | LIHTC Gap Financing |
| Cottages of Idlewild | Housing bond | Construction; City: Under Construction | C | — | — | $560,000 | Public Private Partnerships |
| Healing Transitions Forward Together | Housing bond | Construction; City: Under Construction | E | — | — | $2,200,000 | Public Private Partnerships |
| Iris Ridge | Housing bond | Construction; City: Under Construction | C | — | — | $260,883 | Public Private Partnerships |
| Lake Haven | Housing bond | Construction; City: Under Construction | C | — | — | $950,000 | LIHTC Gap Financing |
| Maple Ridge | Housing bond | Construction; City: Under Construction | C | — | — | $1,550,000 | LIHTC Gap Financing |
| Parkside Apartments | Housing bond | Construction; City: Under Construction | D | — | — | $4,800,000 | LIHTC Gap Financing |
| South East Raleigh Promise Small-Scale Project | Housing bond | Construction; City: Under Construction | — | — | — | $3,300,000 | Public Private Partnerships |
| Name not published | Capital improvement projects | Design | A; inferred | — | — | — | — |
| [1000 Gregg St. Bioretention](https://raleighnc.gov/projects/urban-heat-island-stormwater-improvements) | Capital improvement projects | Design; City: Pre-construction | C; inferred | Stormwater | — | — | — |
| [1713 Crest St Bioretention](https://raleighnc.gov/projects/urban-heat-island-stormwater-improvements) | Capital improvement projects | Design; City: Pre-construction | D; inferred | Stormwater | — | — | — |
| 2015 Water Main Replacement Package 4 | Capital improvement projects | Design | E; inferred | Raleigh Water | Kevin Braxton | — | — |
| 2024 Pump Station Generator Replacement | Capital improvement projects | Design | C; inferred | Raleigh Water | Vinod Korategere | — | — |
| 36" Water Transmission Main Assessment | Capital improvement projects | Design | — | Raleigh Water | Breanne Wood | — | — |
| [717 E. Martin St. Bioretention](https://raleighnc.gov/projects/urban-heat-island-stormwater-improvements) | Capital improvement projects | Design; City: Pre-construction | C; inferred | Stormwater | — | — | — |
| Aberdeen Drive Street and Sidewalk Improvement Petition | Capital improvement projects | Design | C; inferred | Transportation | Lichuan Wang | — | — |
| Alamance Drive Drainage Improvements | Capital improvement projects | Design | E; inferred | Stormwater | — | — | — |
| Ashe Ave Pedestrian Hybrid Beacon | Capital improvement projects | Design | D; inferred | Transportation | — | — | — |
| Atlantic - Whitaker Mill Improvements | Capital improvement projects | Design | C; inferred | Transportation | — | — | — |
| Atlantic Avenue Multi-Use Path | Capital improvement projects | Design | C; inferred | Transportation | Monique Gyant | — | — |
| [Automotive Way Roundabout](https://raleighnc.gov/projects/blount-st-person-st-two-way-conversion-project) | Capital improvement projects | Design | C; inferred | Raleigh Water | Julie Parham | — | — |
| [Avent Ferry Road Improvements - Part of Group 8 Sidewalk projects](https://raleighnc.gov/projects/avent-ferry-road-improvements) | Capital improvement projects | Design | D; inferred | Transportation | Stephane Belinga | — | — |
| [Barwell Road Widening](https://raleighnc.gov/home/content/PWksDesignConst/Articles/BarwellRoadProject.html) | Capital improvement projects | Design | — | Raleigh Water | Breanne Wood | — | — |
| [Battle Ridge Comminty to Neuse River Trail](https://raleighnc.gov/projects/battle-ridge-community-neuse-river-trail-greenway-connector) | Capital improvement projects | Design | C; inferred | Parks, Recreation & Cultural Resources | — | — | — |
| [Battle Ridge North to Neuse Trail](https://raleighnc.gov/projects/battle-ridge-north-community-neuse-river-trail-greenway-connector) | Capital improvement projects | Design | C; inferred | Parks, Recreation & Cultural Resources | — | — | — |
| Battleford Drive Drainage Improvements | Capital improvement projects | Design | A; inferred | Stormwater | — | — | — |
| Bayfield Drive Drainage Improvements - DA | Capital improvement projects | Design | D; inferred | Stormwater | — | — | — |
| Beaver Dam Road Drainage Improvements - DA | Capital improvement projects | Design | D; inferred | Stormwater | — | — | — |
| [Bellevue Rd Traffic Calming](https://raleighnc.gov/transportation/services/neighborhood-traffic-management/final-traffic-calming-designs) | Capital improvement projects | Design | E; inferred | Transportation | — | — | — |
| [Biltmore Hills Tennis Center Expansion](https://www.raleighnc.gov/parks/content/ParksRec/Articles/Projects/BiltmoreHillsPark.html) | Capital improvement projects | Design | C; inferred | Parks, Recreation & Cultural Resources | — | — | — |
| Biltmore Hills Water Main Replacement | Capital improvement projects | Design; City: Right of Way Acquisition | C; inferred | Raleigh Water | Courtney Licata | — | — |
| [Bilyeu St. & Main Campus Drive 24" Transmission Main](https://raleighnc.gov/services/content/PubUtilAdmin/Articles/Projects/CIP/PullentoBainReinforcingMain.html) | Capital improvement projects | Design | D; inferred | Raleigh Water | Justin Biegler | — | — |
| BioEnergy Sidestream Treatment Process | Capital improvement projects | Design | — | Raleigh Water | Ed Stempien | — | — |
| Blenheim Stream Relocation and Storm Sewer Replacement | Capital improvement projects | Design | E; inferred | Raleigh Water | Louis Bennett | — | — |
| [Blount/Person St - Two-Way Conversion](https://raleighnc.gov/projects/blount-st-and-person-st-improvement-project) | Capital improvement projects | Design | C; inferred | Transportation | Lichuan Wang | — | — |
| [Blue Ridge Road Multimodal Widening North](https://raleighnc.gov/projects/blue-ridge-road-widening-north) | Capital improvement projects | Design | E; inferred | Transportation | Nabil Hasan | — | — |
| [Branblewood Dr (6208) DA](https://raleighnc.gov/projects/north-raleigh-drainage-assistance-bundle) | Capital improvement projects | Design | A; inferred | Stormwater | — | — | — |
| [Bridge Replacement - Cheswick Drive and Shelley Road](https://raleighnc.gov/projects/shelley-road-bridge-replacement-project) | Capital improvement projects | Design | A; inferred | Transportation | Sylvester Percival | — | — |
| [Bridge Structure #88 Replacement Project](https://raleighnc.gov/projects/bridge-structure-37-and-88-replacement-projects) | Capital improvement projects | Design | C; inferred | Parks, Recreation & Cultural Resources | — | — | — |
| [Bridgeport Dr - W Traffic Calming](https://raleighnc.gov/transportation/services/neighborhood-traffic-management/final-traffic-calming-designs) | Capital improvement projects | Design | A; inferred | Transportation | — | — | — |
| Brighton Road Sidewalk Petition | Capital improvement projects | Design | C; inferred | Transportation | Sam Brewer | — | — |
| Brookhaven Drive Sidewalk | Capital improvement projects | Design | E; inferred | Transportation | Lichuan Wang | — | — |
| Brookside Drive Stream Repair - DA | Capital improvement projects | Design | C; inferred | Stormwater | — | — | — |
| Buffaloe/New Hope Signal Improvement | Capital improvement projects | Design | — | Transportation | — | — | — |
| [Bunker Hill Dr Traffic Calming](https://raleighnc.gov/transportation/services/neighborhood-traffic-management/final-traffic-calming-designs) | Capital improvement projects | Design | C; inferred | Transportation | — | — | — |
| Cambridge Woods Way Drainage Improvements | Capital improvement projects | Design | E; inferred | Stormwater | — | — | — |
| [Camp Pond Dam Reconstruction Project\*\*\*\*](https://raleighnc.gov/projects/camp-pond-dam) | Capital improvement projects | Design | D; inferred | Stormwater | — | — | — |
| Capital/Calvary Safety Improvements | Capital improvement projects | Design | A; inferred | Transportation | — | — | — |
| [Carolina Pines Ave. Sewer replacement](https://raleighnc.gov/home/content/PWksDesignConst/Articles/CarolinaPinesAvenueProject.html) | Capital improvement projects | Design | D; inferred | Raleigh Water | Breanne Wood | — | — |
| Cobblestone Court Sidewalk Petition | Capital improvement projects | Design | E; inferred | Transportation | Lichuan Wang | — | — |
| College Street EST | Capital improvement projects | Design | — | Raleigh Water | Julie Parham | — | — |
| [Colleton Road Sidewalk Petition](https://raleighnc.gov/projects/colleton-road-sidewalk-project) | Capital improvement projects | Design | C; inferred | Transportation | Jaykumar Shah | — | — |
| [Crabtree Creek Trail Improvements at Lassiter Mill Road](https://www.raleighnc.gov/parks/content/ParksRec/Articles/Projects/CrabtreeCreekTrailImprovementsAtLassiterMillRoadPlanning.html) | Capital improvement projects | Design | E; inferred | Parks, Recreation & Cultural Resources | — | — | — |
| [Crabtree Creek Trail to Sunnybrook Park Greenway Connector](https://raleighnc.gov/projects/crabtree-creek-trail-sunnybrook-road-property-greenway-connector) | Capital improvement projects | Design | C; inferred | Parks, Recreation & Cultural Resources | — | — | — |
| Crabtree Southbank - 42" Interceptor Improvements | Capital improvement projects | Design | C; inferred | Raleigh Water | Ed Stempien | — | — |
| Crabtree Valley Sewer Extension/Replacement | Capital improvement projects | Design; City: Right of Way Acquisition | E; inferred | Raleigh Water | Matt Cotton | — | — |
| [Cross Link Rd separated bikeway](https://raleighnc.gov/transportation/services/active-mobility-program) | Capital improvement projects | Design | C; inferred | Transportation | — | — | — |
| Dana Drive/ Walnut Creek Floodplain Evaluation Project | Capital improvement projects | Design | D; inferred | Stormwater | — | — | — |
| [Deblyn Ave Traffic Calming](https://raleighnc.gov/transportation/services/neighborhood-traffic-management/final-traffic-calming-designs) | Capital improvement projects | Design | E; inferred | Transportation | — | — | — |
| Dixie Trail Streambank Stabilization - DA | Capital improvement projects | Design | D; inferred | Stormwater | — | — | — |
| [Donald Ross Dr Bikeway](https://raleighnc.gov/transportation/services/bikeraleigh/current-bike-projects) | Capital improvement projects | Design | C; inferred | Transportation | — | — | — |
| [Dorothea Dix Park](https://dixpark.org/park-planning) | Capital improvement projects | Design | D; inferred | Parks, Recreation & Cultural Resources | — | — | — |
| [Durant Road 36" Transmission Main](https://raleighnc.gov/projects/durant-road-36-inch-transmission-main) | Capital improvement projects | Design | B; inferred | Raleigh Water | Matt Cotton | — | — |
| East Jameson Road Drainage Improvements - DA | Capital improvement projects | Design | C; inferred | Stormwater | — | — | — |
| East Lane Street Drainage Improvements | Capital improvement projects | Design | C; inferred | Stormwater | — | — | — |
| East Raleigh Park & Ride | Capital improvement projects | Design | C; inferred | Transportation | Alex Shapiro | — | — |
| [Eastgate Park Lake/Dam Rehabilitation](https://raleighnc.gov/projects/eastgate-lake-and-dam-rehabilitation) | Capital improvement projects | Design | A; inferred | Stormwater | — | — | — |
| EMJ 54 Inch Raw Water Line | Capital improvement projects | Design | — | Raleigh Water | Matt Cotton | — | — |
| EMJ Chemical Campus Expansion | Capital improvement projects | Design | B; inferred | Raleigh Water | Julie Parham | — | — |
| EMJ PAC Silos | Capital improvement projects | Design | B; inferred | Raleigh Water | Julie Parham | — | — |
| EMJ RWPS Exhaust Fan Upgrades Evaluation | Capital improvement projects | Design | — | Raleigh Water | Dan Williams | — | — |
| EMJ West Reservoir Rehabilitation | Capital improvement projects | Design | B; inferred | Raleigh Water | Breanne Wood | — | — |
| Facility Improvements | Capital improvement projects | Design | B; inferred | Raleigh Water | Breanne Wood | — | — |
| [Faircloth Street Separated Bikeway](https://raleighnc.gov/transportation/services/bikeraleigh/current-bike-projects) | Capital improvement projects | Design | D; inferred | Transportation | Barbara Godwin | — | — |
| [Falls River Ave - 3 Traffic Calming](https://raleighnc.gov/transportation/services/neighborhood-traffic-management/final-traffic-calming-designs) | Capital improvement projects | Design | B; inferred | Transportation | — | — | — |
| [Falls River Ave - 3 Traffic Calming](https://raleighnc.gov/transportation/services/neighborhood-traffic-management/final-traffic-calming-designs) | Capital improvement projects | Design | B; inferred | Transportation | — | — | — |
| [Fayetteville Rd Traffic Calming](https://raleighnc.gov/transportation/services/neighborhood-traffic-management/final-traffic-calming-designs) | Capital improvement projects | Design | D; inferred | Transportation | — | — | — |
| Fire Station 3 | Capital improvement projects | Design | C; inferred | Fire | — | — | — |
| Fletcher Wetland Rehabilitation | Capital improvement projects | Design | D; inferred | Stormwater | — | — | — |
| Foxtrot Road Drainage Improvements - DA | Capital improvement projects | Design | C; inferred | Stormwater | — | — | — |
| Freeman Street, Postell Street, and Coleman Street Sidewalk Petition | Capital improvement projects | Design | C; inferred | Transportation | Sam Brewer | — | — |
| Garner Forest Hills & Raleigh Watermain Replacement | Capital improvement projects | Design | C; inferred | Raleigh Water | Vinod Korategere | — | — |
| Garner Road Pedestrian Improvements | Capital improvement projects | Design | C; inferred | Transportation | Stephane Belinga | — | — |
| Generator Replacement | Capital improvement projects | Design | — | Raleigh Water | Todd Toler | — | — |
| [Glascock St - E Traffic Calming](https://raleighnc.gov/transportation/services/neighborhood-traffic-management/final-traffic-calming-designs) | Capital improvement projects | Design | C; inferred | Transportation | — | — | — |
| Glenbrook Area Flood Hazard Reduction | Capital improvement projects | Design | C; inferred | Stormwater | — | — | — |
| Glenwood Ave. and Creston | Capital improvement projects | Design | E; inferred | Stormwater | — | — | — |
| [Glenwood Forest Dr Traffic Calming](https://raleighnc.gov/transportation/services/neighborhood-traffic-management/final-traffic-calming-designs) | Capital improvement projects | Design | E; inferred | Transportation | — | — | — |
| GoRaleigh Operations & Maintenance Facility Expansion | Capital improvement projects | Design | C; inferred | Transportation | Alex Shapiro | — | — |
| [Grand Traverse Dr Traffic Calming](https://raleighnc.gov/transportation/services/neighborhood-traffic-management/final-traffic-calming-designs) | Capital improvement projects | Design | B; inferred | Transportation | — | — | — |
| [Green Rd separated bikeway](https://raleighnc.gov/transportation/services/active-mobility-program) | Capital improvement projects | Design | A; inferred | Transportation | — | — | — |
| Guard Hill Drive Drainage Improvements | Capital improvement projects | Design | C; inferred | Stormwater | — | — | — |
| [Hadley Rd Traffic Calming](https://raleighnc.gov/transportation/services/neighborhood-traffic-management/final-traffic-calming-designs) | Capital improvement projects | Design | C; inferred | Transportation | — | — | — |
| [Highwoods Blvd](https://raleighnc.gov/projects/highwoods-boulevard-sidewalk-project) | Capital improvement projects | Design | A; inferred | Transportation | Diana Deadmore | — | — |
| Highwoods/Poplarwood New Signal | Capital improvement projects | Design | A; inferred | Transportation | — | — | — |
| Hillcrest Drive Water and Sewer Extension | Capital improvement projects | Design | C; inferred | Raleigh Water | Ed Stempien | — | — |
| Holden Street Drainage Improvements - DA | Capital improvement projects | Design | C; inferred | Stormwater | — | — | — |
| I&I Study | Capital improvement projects | Design | — | Raleigh Water | Matt Cotton | — | — |
| [Inglewood Lane](https://raleighnc.gov/projects/inglewood-lane-sidewalk-project) | Capital improvement projects | Design; City: Pre-construction | A; inferred | Transportation | — | — | — |
| [Kayla Court (DA)](https://raleighnc.gov/projects/kayla-court-stream-stabilization) | Capital improvement projects | Design | D; inferred | Stormwater | — | — | — |
| [Kelway Dr Traffic Calming](https://raleighnc.gov/transportation/services/neighborhood-traffic-management/final-traffic-calming-designs) | Capital improvement projects | Design | B; inferred | Transportation | — | — | — |
| [Kent Rd Traffic Calming](https://raleighnc.gov/transportation/services/neighborhood-traffic-management/final-traffic-calming-designs) | Capital improvement projects | Design | D; inferred | Transportation | — | — | — |
| Kent/Method/Western Traffic Signal Improvement | Capital improvement projects | Design | D; inferred | Transportation | — | — | — |
| Lake Boone Trail Petitioned Street & Sidewalk Improvements | Capital improvement projects | Design | E; inferred | Transportation | Dennis Trujillo | — | — |
| Lake Boone Trl to House Creek Trail | Capital improvement projects | Design | E; inferred | Parks, Recreation & Cultural Resources | — | — | — |
| Lake Johnson Dam Repairs | Capital improvement projects | Design | D; inferred | Stormwater | — | — | — |
| Lake Wheeler & Lake Benson Dam Improvements | Capital improvement projects | Design | — | Raleigh Water | Courtney Licata | — | — |
| Lake Wheeler Road Sidewalk | Capital improvement projects | Design | D; inferred | Transportation | Eddy Mumpasi | — | — |
| Large Valve Replacement Contract 1 | Capital improvement projects | Design | B; inferred | Raleigh Water | Julie Parham | — | — |
| [Lassiter Mill Rd separated bikeway](https://raleighnc.gov/transportation/services/active-mobility-program) | Capital improvement projects | Design | E; inferred | Transportation | — | — | — |
| Laurel Mountain Rd | Capital improvement projects | Design | A; inferred | Transportation | — | — | — |
| LCRR Field Service Line Verifications | Capital improvement projects | Design | B; inferred | Raleigh Water | Breanne Wood | — | — |
| [Lenoir St separated bikeway](https://raleighnc.gov/transportation/services/active-mobility-program) | Capital improvement projects | Design | D; inferred | Transportation | — | — | — |
| [Levister Ct at Walnut Terrace - silva cell](https://raleighnc.gov/projects/urban-heat-island-stormwater-improvements) | Capital improvement projects | Design; City: Pre-construction | D; inferred | Stormwater | — | — | — |
| [Lions Park GSI Retrofit (ARPA)](https://raleighnc.gov/projects/lions-park-green-stormwater-infrastructure-installation) | Capital improvement projects | Design | C; inferred | Stormwater | — | — | — |
| Little Creek RRF Rehabilitation & Replacement | Capital improvement projects | Design | — | Raleigh Water | Breanne Wood | — | — |
| Lord Ashley Road Drainage Improvements | Capital improvement projects | Design | C; inferred | Stormwater | — | — | — |
| [Lower Longview Dam Outfall Stream Stabilization Project](https://raleighnc.gov/projects/lower-longview-streambank-stabilization) | Capital improvement projects | Design | C; inferred | Stormwater | — | — | — |
| [Lower Richland Creek Interceptor Upgrade](https://raleighnc.gov/services/content/PubUtilAdmin/Articles/Projects/CIP/3042RichlandCreekInterceptor.html) | Capital improvement projects | Design | B; inferred | Raleigh Water | Julie Parham | — | — |
| Mabry Mill - Wakefield Pines Signal | Capital improvement projects | Design | B; inferred | Transportation | — | — | — |
| [Marsh Creek Road](https://raleighnc.gov/home/content/PWksDesignConst/Articles/MarshTrawick.html) | Capital improvement projects | Design | — | Transportation | Dean Fox | — | — |
| [Maybrook Dr Traffic Calming](https://raleighnc.gov/transportation/services/neighborhood-traffic-management/final-traffic-calming-designs) | Capital improvement projects | Design | C; inferred | Transportation | — | — | — |
| Melbourne Road Drainage Improvements - DA | Capital improvement projects | Design | D; inferred | Stormwater | — | — | — |
| [Method Rd separated bikeway](https://raleighnc.gov/transportation/services/active-mobility-program) | Capital improvement projects | Design | D; inferred | Transportation | — | — | — |
| MH Rehab | Capital improvement projects | Design | — | Raleigh Water | Kristen Pierce | — | — |
| [Midlands Townhomes Streambank Stabilization - Drainage Assistance Program](https://raleighnc.gov/projects/midlands-townhomes-streambank-stabilization) | Capital improvement projects | Design | A; inferred | Stormwater | — | — | — |
| Mine Creek Sewer Improvements (B&C) | Capital improvement projects | Design | A; inferred | Raleigh Water | Todd Toler | — | — |
| [Morgan St separated bikeway](https://raleighnc.gov/transportation/services/active-mobility-program) | Capital improvement projects | Design | D; inferred | Transportation | — | — | — |
| Mourning Dove Road Drainage Improvements - DA | Capital improvement projects | Design | A; inferred | Stormwater | — | — | — |
| [N Rogers Ln separated bikeway](https://raleighnc.gov/transportation/services/active-mobility-program) | Capital improvement projects | Design | C; inferred | Transportation | — | — | — |
| [N West St Bikeway](https://raleighnc.gov/transportation/services/bikeraleigh/current-bike-projects) | Capital improvement projects | Design | D; inferred | Transportation | Barbara Godwin | — | — |
| NCDOT-B-4654 Project - US 70 and Rte 50 | Capital improvement projects | Design | — | Raleigh Water | Todd Toler | — | — |
| NCDOT-I-5111 / I-4739 - I-40 to Cornwallis Rd. & NC 42 | Capital improvement projects | Design | — | Raleigh Water | Todd Toler | — | — |
| NCDOT-I-5708 - Wake Forest Rd. & I-440 | Capital improvement projects | Design | A; inferred | Raleigh Water | Todd Toler | — | — |
| NCDOT-P-5715 New Hope Church Rd. | Capital improvement projects | Design | A; inferred | Raleigh Water | Todd Toler | — | — |
| NCDOT-U-5518 - Glenwood Ave - Page Rd. to I-540 | Capital improvement projects | Design | — | Raleigh Water | Todd Toler | — | — |
| NCDOT-U2719 / U4437 - Walnut St. to Wade Ave. | Capital improvement projects | Design | D; inferred | Raleigh Water | Todd Toler | — | — |
| NCDOT-Y-4805F Knightdale Intersections | Capital improvement projects | Design | — | Raleigh Water | Todd Toler | — | — |
| Neuse River EQ Basin Study | Capital improvement projects | Design | — | Raleigh Water | Breanne Wood | — | — |
| New Bern Ave- East of 440 Improvements | Capital improvement projects | Design | C; inferred | Transportation | — | — | — |
| New Bern Avenue BRT Impvs. | Capital improvement projects | Design; City: Right of Way Acquisition | C; inferred | Raleigh Water | Todd Toler | — | — |
| Newbold Street Drainage Improvements - DA | Capital improvement projects | Design | D; inferred | Stormwater | — | — | — |
| [Norris Street Sidewalks](https://raleighnc.gov/projects/norris-street-petition-project) | Capital improvement projects | Design; City: Pre-construction | C; inferred | Transportation | — | — | — |
| North Raleigh Sewer Extension | Capital improvement projects | Design | A; inferred | Raleigh Water | Leticia Rieger | — | — |
| NRRRF BNR Basins MCC Replacement | Capital improvement projects | Design | — | Raleigh Water | Dan Williams | — | — |
| NRRRF Cake Storage #3 & Misc. Improvements | Capital improvement projects | Design | — | Raleigh Water | Dan Williams | — | — |
| NRRRF Generator Replacement Project | Capital improvement projects | Design | — | Raleigh Water | Dan Williams | — | — |
| NRRRF Hypo Feed Facility Rehab | Capital improvement projects | Design | — | Raleigh Water | Dan Williams | — | — |
| [Oak Park Rd - E Traffic Calming](https://raleighnc.gov/transportation/services/neighborhood-traffic-management/final-traffic-calming-designs) | Capital improvement projects | Design | E; inferred | Transportation | — | — | — |
| [Old Wake Forest Road (North) Multimodal Widening](https://raleighnc.gov/home/content/PWksDesignConst/Articles/OldWakeForestRoad.html) | Capital improvement projects | Design | A; inferred | Transportation | Sam Brewer | — | — |
| Old Wake Forest Widening 30-in Water Transmission Main | Capital improvement projects | Design | A; inferred | Raleigh Water | Courtney Licata | — | — |
| [Oxford Road Sidewalk Installation](https://raleighnc.gov/projects/oxford-road-sidewalk-project) | Capital improvement projects | Design | E; inferred | Raleigh Water | Breanne Wood | — | — |
| [Perry Creek Outfall Replacement](https://raleighnc.gov/projects/perry-creek-interceptor) | Capital improvement projects | Design; City: Right of Way Acquisition | — | Raleigh Water | Breanne Wood | — | — |
| [Phase I: East Civic Tower](https://raleighnc.gov/projects?type=All&funding=All&name=Civic+Campus) | Capital improvement projects | Design | D; inferred | General Government | Priscilla Tyree Williams | — | — |
| [Pinecroft Drive Stream Stabilization DA](https://raleighnc.gov/projects/north-raleigh-drainage-assistance-bundle) | Capital improvement projects | Design | A; inferred | Stormwater | — | — | — |
| [Plainview Avenue Sidewalk](https://raleighnc.gov/projects/plainview-avenue-vale-street-sidewalk-project) | Capital improvement projects | Design; City: Pre-construction | C; inferred | Transportation | — | — | — |
| Pleasant Grove Church Rd | Capital improvement projects | Design | E; inferred | Transportation | — | — | — |
| Poole Road 30-inch Water Transmission Main | Capital improvement projects | Design; City: Right of Way Acquisition | — | Raleigh Water | Courtney Licata | — | — |
| Poole Road East Main Replacement | Capital improvement projects | Design | C; inferred | Raleigh Water | Justin Biegler | — | — |
| Poole Road Pump Station and Force Main Improvements | Capital improvement projects | Design | — | Raleigh Water | Matt Cotton | — | — |
| [Poole Road Stormwater Improvements (DA)](https://raleighnc.gov/projects/poole-road-stormwater-improvements) | Capital improvement projects | Design | C; inferred | Stormwater | — | — | — |
| Pope House Museum Renovations and Landscape Improvements | Capital improvement projects | Design | C; inferred | Parks, Recreation & Cultural Resources | — | — | — |
| [Powell Dr Traffic Calming](https://raleighnc.gov/transportation/services/neighborhood-traffic-management/final-traffic-calming-designs) | Capital improvement projects | Design | D; inferred | Transportation | — | — | — |
| [Poyner Rd Traffic Calming](https://raleighnc.gov/transportation/services/neighborhood-traffic-management/final-traffic-calming-designs) | Capital improvement projects | Design | E; inferred | Transportation | — | — | — |
| [Proctor Rd Traffic Calming](https://raleighnc.gov/transportation/services/neighborhood-traffic-management/final-traffic-calming-designs) | Capital improvement projects | Design | C; inferred | Transportation | — | — | — |
| Pullen to Bain Reinforcing Main | Capital improvement projects | Design | D; inferred | Raleigh Water | Justin Biegler | — | — |
| [Quail Hollow Drive Separated Bikeway](https://raleighnc.gov/transportation/services/bikeraleigh/current-bike-projects) | Capital improvement projects | Design | A; inferred | Transportation | Barbara Godwin | — | — |
| [Quail Ridge Road Stream Stabilization - SSP](https://raleighnc.gov/projects/quail-ridge-road-stream-stabilization) | Capital improvement projects | Design | A; inferred | Stormwater | — | — | — |
| [Rainwater Rd - N Traffic Calming](https://raleighnc.gov/transportation/services/neighborhood-traffic-management/final-traffic-calming-designs) | Capital improvement projects | Design | A; inferred | Transportation | — | — | — |
| Raleigh Convention Center Expansion Joint | Capital improvement projects | Design | D; inferred | Raleigh Convention Center | — | — | — |
| Rand Road Waterline | Capital improvement projects | Design; City: Right of Way Acquisition | — | Raleigh Water | Courtney Licata | — | — |
| Rawls Drive Sidewalk Petition | Capital improvement projects | Design | C; inferred | Transportation | Sam Brewer | — | — |
| RCC Expansion Joint/ Water Intrusion | Capital improvement projects | Design | D; inferred | Raleigh Convention Center | — | — | — |
| RDU Runway Rehab 30-inch FM & 16-inch waterline relocation | Capital improvement projects | Design | — | Raleigh Water | Matt Cotton | — | — |
| [Rembert Dr Traffic Calming](https://raleighnc.gov/transportation/services/neighborhood-traffic-management/final-traffic-calming-designs) | Capital improvement projects | Design | E; inferred | Transportation | — | — | — |
| Rembert Drive - Part B Sidewalk Petition | Capital improvement projects | Design | E; inferred | Transportation | Lichuan Wang | — | — |
| [Rock Creek Drive Stream Stabilization DA](https://raleighnc.gov/projects/north-raleigh-drainage-assistance-bundle) | Capital improvement projects | Design | E; inferred | Stormwater | — | — | — |
| Rogers Branch Road Extension Waterline Impvs. | Capital improvement projects | Design | — | Raleigh Water | Janeen Goodwin | — | — |
| Rogers Road Grade Separation | Capital improvement projects | Design | — | Raleigh Water | Janeen Goodwin | — | — |
| Rose Lane Safe Access Flood Resilience Project\*\*\*\* | Capital improvement projects | Design | C; inferred | Stormwater | — | — | — |
| [Rush St separated bikeway](https://raleighnc.gov/transportation/services/active-mobility-program) | Capital improvement projects | Design | D; inferred | Transportation | — | — | — |
| S King Charles Rd | Capital improvement projects | Design | C; inferred | Transportation | — | — | — |
| Sanford Creek Interceptor | Capital improvement projects | Design; City: Right of Way Acquisition | — | Raleigh Water | Kristen Pierce | — | — |
| School House - Wakefield Pines Signal | Capital improvement projects | Design | B; inferred | Transportation | — | — | — |
| [Seaboard Station Sanitary Sewer Evaluation and Design](https://raleighnc.gov/projects/seaboard-station-utility-improvements) | Capital improvement projects | Design; City: Right of Way Acquisition | C; inferred | Raleigh Water | Julie Parham | — | — |
| [Six Forks Road Corridor Improvements](https://raleighnc.gov/projects/six-forks-road-improvements) | Capital improvement projects | Design | A; inferred | Transportation | Riska Dees | — | — |
| [Six Forks Road Widening](https://raleighnc.gov/projects/six-forks-road-improvements) | Capital improvement projects | Design | A; inferred | Raleigh Water | Breanne Wood | — | — |
| Smith Creek WWTP Process Upgrades | Capital improvement projects | Design | — | Raleigh Water | Matt Cotton | — | — |
| [Smoky Hollow Park](https://raleighnc.gov/projects/smoky-hollow-park-project) | Capital improvement projects | Design | D; inferred | Raleigh Water | Julie Parham | — | — |
| Smoky Hollow Stream Restoration & Wetlands (Devereau Meadows Stream Restoration) | Capital improvement projects | Design | D; inferred | Stormwater | — | — | — |
| [Southall Rd separated bikeway](https://raleighnc.gov/transportation/services/active-mobility-program) | Capital improvement projects | Design | B; inferred | Transportation | — | — | — |
| Spottswood Street SCM Retrofit Project | Capital improvement projects | Design; City: Pre-construction | B; inferred | Stormwater | — | — | — |
| [Spring Forest Rd separated bikeway](https://raleighnc.gov/transportation/services/active-mobility-program) | Capital improvement projects | Design | A; inferred | Transportation | — | — | — |
| [St Albans Dr separated bikeway](https://raleighnc.gov/transportation/services/active-mobility-program) | Capital improvement projects | Design | A; inferred | Transportation | — | — | — |
| ST James Church Rd | Capital improvement projects | Design | C; inferred | Transportation | — | — | — |
| [St Marys St Bikeway](https://raleighnc.gov/transportation/services/bikeraleigh/current-bike-projects) | Capital improvement projects | Design | D; inferred | Transportation | — | — | — |
| [Starmount Dr Traffic Calming](https://raleighnc.gov/transportation/services/neighborhood-traffic-management/final-traffic-calming-designs) | Capital improvement projects | Design | C; inferred | Transportation | — | — | — |
| State Street water and Sewer Improvements Phase 1 | Capital improvement projects | Design | C; inferred | Raleigh Water | Todd Toler | — | — |
| [Steinbeck Dr Traffic Calming](https://raleighnc.gov/transportation/services/neighborhood-traffic-management/final-traffic-calming-designs) | Capital improvement projects | Design | A; inferred | Transportation | — | — | — |
| Steinbeck Dr Traffic Calming | Capital improvement projects | Design | A; inferred | — | — | — | — |
| [Structure #17 Improvements](https://www.raleighnc.gov/parks/content/ParksRec/Articles/Projects/Structure37CrabtreeCreekGreenwayTrail.html) | Capital improvement projects | Design | A; inferred | Parks, Recreation & Cultural Resources | — | — | — |
| Structure 19 Replacement | Capital improvement projects | Design | A; inferred | Parks, Recreation & Cultural Resources | — | — | — |
| [Sweetbriar Drive](https://raleighnc.gov/projects/sweetbriar-drive-stormwater-project) | Capital improvement projects | Design | A; inferred | Stormwater | — | — | — |
| [Tarboro Rd - Rock Quarry Rd separated bikeway](https://raleighnc.gov/transportation/services/active-mobility-program) | Capital improvement projects | Design | C; inferred | Transportation | — | — | — |
| [Trawick Road - West](https://raleighnc.gov/home/content/PWksDesignConst/Articles/MarshTrawick.html) | Capital improvement projects | Design | C; inferred | Transportation | Dean Fox | — | — |
| [Turf Grass Ct Traffic Calming](https://raleighnc.gov/transportation/services/neighborhood-traffic-management/final-traffic-calming-designs) | Capital improvement projects | Design | C; inferred | Transportation | — | — | — |
| Turnbridge Drive Street Improvement Petition | Capital improvement projects | Design | E; inferred | Transportation | Lichuan Wang | — | — |
| [Upper Durant Wetland Conversion](https://raleighnc.gov/stormwater/events/wetland-conversion-upper-durant-lake) | Capital improvement projects | Design | B; inferred | Stormwater | — | — | — |
| Upper Pigeon Project 3 St Marys Area | Capital improvement projects | Design | D; inferred | Raleigh Water | Unknown | — | — |
| US 401 Fayetteville Road DOT | Capital improvement projects | Design | — | Raleigh Water | Matt Cotton | — | — |
| [Valley Drive](https://raleighnc.gov/projects/valley-drive-sidewalk-project) | Capital improvement projects | Design | A; inferred | Transportation | Jaykumar Shah | — | — |
| Village District Main Replacement | Capital improvement projects | Design | D; inferred | Raleigh Water | Justin Biegler | — | — |
| [Wake BRT: Southern Corridor](https://raleighnc.gov/projects/wake-brt-southern-corridor) | Capital improvement projects | Design | D; inferred | Transportation | Het Patel | — | — |
| [Wake BRT: Western Corridor](https://raleighnc.gov/bus-rapid-transit-western) | Capital improvement projects | Design | D; inferred | Transportation | Het Patel | — | — |
| Wake Forest Water main Replacements | Capital improvement projects | Design | — | Raleigh Water | Ed Stempien | — | — |
| Walnut Creek LS Rehabilitation | Capital improvement projects | Design | — | Raleigh Water | Julie Parham | — | — |
| [Weldon Place (DA)](https://raleighnc.gov/projects) | Capital improvement projects | Design | E; inferred | Stormwater | — | — | — |
| West Street Extension Flood Study | Capital improvement projects | Design | D; inferred | Stormwater | — | — | — |
| West Street Extension South | Capital improvement projects | Design | D; inferred | Transportation | Sylvester Percival | — | — |
| [Western Blvd BRT](https://raleighnc.gov/bus-rapid-transit-western) | Capital improvement projects | Design | D; inferred | Raleigh Water | Julie Parham | — | — |
| White Oak Crossing Shopping Center Water Main Relocate | Capital improvement projects | Design | — | Raleigh Water | Kevin Braxton | — | — |
| [Wide River Dr Traffic Calming](https://raleighnc.gov/transportation/services/neighborhood-traffic-management/final-traffic-calming-designs) | Capital improvement projects | Design | B; inferred | Transportation | — | — | — |
| Wildcat Branch Sanitary Sewer Improvements | Capital improvement projects | Design | D; inferred | Raleigh Water | Courtney Licata | — | — |
| Wooten Meadow Stream Restoration and Wetlands | Capital improvement projects | Design | E; inferred | Transportation | Lichuan Wang | — | — |
| [Wycliff Rd Traffic Calming](https://raleighnc.gov/transportation/services/neighborhood-traffic-management/final-traffic-calming-designs) | Capital improvement projects | Design | E; inferred | Transportation | — | — | — |
| [Yonkers Road Emergency Repair](https://raleighnc.gov/projects/yonkers-road-emergency-repair) | Capital improvement projects | Design | C; inferred | Stormwater | — | — | — |
| Atlantic - Whitaker Mill | Vision Zero safety | Design; City: In Design | C | — | — | — | Install a pedestrian phase across Atlantic with flatwork and short stretch of sidewalk. |
| Bonneville - New Hope Church | Vision Zero safety | Design; City: In Design | A | — | — | — | Signal or Road Diet |
| Buffaloe/New Hope | Vision Zero safety | Design; City: In Design | C | — | — | — | Install missing signalized crosswalk, APS, and signalize slip lane |
| Calvary & Capital | Vision Zero safety | Design; City: In Design | A | — | — | — | Signal Upgrade: 4 Section heads for Calvary, LPI/APS, relocate crosswalks on Capital, extend median, relocate bus stops closer to intersection, install median fence |
| Columbus Club - Corporation - New Hope | Vision Zero safety | Design; City: In Design | B | — | — | — | Add all 4 pedestrian phases, APS/LPI, additional signal heads (signalize slip lane). |
| Corporate Center - Lillington | Vision Zero safety | Design; City: In Design | D | — | — | — | Install RRFBs and crosswalk. |
| Corporation - Lake Woodard - New Hope | Vision Zero safety | Design; City: In Design | C | — | — | — | Add 4-section head NB and 3-section FYAs for EB/WB. Add LPI/APS |
| Crabtree - Timber | Vision Zero safety | Design; City: In Design | C | — | — | — | Install a crosswalk with RRFBs across Crabtree Blvd. |
| Crabtree View Place | Vision Zero safety | Design; City: In Design | E | — | — | — | Install guardrail on west side of the road. |
| Glenwood & Washington | Vision Zero safety | Design; City: In Design | D | — | — | — | Signalize intersection. |
| Gorman - Jackson - Wolf Village | Vision Zero safety | Design; City: In Design | D | — | — | — | Interim improvements inclduing pork chop island in place of signal |
| Gorman & Jackson | Vision Zero safety | Design; City: In Design | D | — | — | — | Signalize intersection. |
| HAWK- Ashe Ave | Vision Zero safety | Design; City: In Design | D | — | — | — | RRFB conversion to HAWK |
| Highwoods & Poplarwood | Vision Zero safety | Design; City: In Design | A | — | — | — | Signalize intersection. |
| Kent/Method/Western | Vision Zero safety | Design; City: In Design | D | — | — | — | Install missing signalized crosswalk, LPI, APS, backplates, and nearside signal heads |
| Mabry Mills - Wakefield Pines | Vision Zero safety | Design; City: In Design | B | — | — | — | Signalize intersection. |
| MLK Improvements- Salisbury to East | Vision Zero safety | Design; City: In Design | C | — | — | — | Pedestrian Safety Upgrades including curb ramps, high viz crosswalks, new traffic signal, and signal upgrades |
| MLK Improvements- Salisbury to East | Vision Zero safety | Design; City: In Design | C | — | — | — | Pedestrian Safety Upgrades including curb ramps, high viz crosswalks, new traffic signal, and signal upgrades |
| New Bern Ave- East of 440 Improvements | Vision Zero safety | Design; City: In Design | C | — | — | — | Safety Improvements along NBA at the intersections of Trawick, Corporation, New Hope, and Hedingham |
| Schoolhouse - Wakefield Pines | Vision Zero safety | Design; City: In Design | B | — | — | — | Signalize intersection. |
| Wake Forest - Chestnut | Vision Zero safety | Design; City: In Design | C | — | — | — | Install RRFBs at existing midblock crosswalk. |
| ATLANTIC AVE from CRABTREE CREEK GREENWAY to HIGHWOODS BLVD | Sidewalks | Design | C; inferred | — | — | — | Sidewalk Only |
| AVENT FERRY RD from LAKE JOHNSON PARK to LAKE FERRY DR | Sidewalks | Design | D; inferred | — | — | — | Major Street Improvement |
| BARWELL RD from ROCK QUARRY RD to NEALS CREEK DR | Sidewalks | Design | C; inferred | — | — | — | Major Street Improvement |
| BRIER CREEK PKWY from LITTLE BRIER CREEK LN to GLENWOOD AVE | Sidewalks | Design | E; inferred | — | — | — | Major Street Improvement |
| Brighton Rd from Millbank St to Glascock St | Sidewalks | Design | C; inferred | — | — | — | — |
| BROOKSIDE DR from WAKE FOREST RD to VALE ST | Sidewalks | Design | C; inferred | — | — | — | Sidewalk Only |
| Burt Drive from Gorman St to Stovall Dr | Sidewalks | Design | D; inferred | — | — | — | — |
| CAPITAL BLVD from CRABTREE GREENWAY VICINITY to APPLIANCE CT | Sidewalks | Design | C; inferred | — | — | — | Major Street Improvement |
| Colleton Rd from Bertie Dr to Oakwood Ave | Sidewalks | Design | C; inferred | — | — | — | — |
| FAIRCLOTH ST from HILLSBOROUGH ST to WADE AVE | Sidewalks | Design | D; inferred | — | — | — | Sidewalk Only |
| GLENWOOD AVE from DURALEIGH RD to LUMLEY RD | Sidewalks | Design | E; inferred | — | — | — | Major Street Improvement |
| HIGHWOODS BLVD from CAPITAL BLVD to ATLANTIC AVE | Sidewalks | Design | A; inferred | — | — | — | Sidewalk Only |
| Inglewood Ln from Yadkin Dr to Manchester Dr | Sidewalks | Design | A; inferred | — | — | — | — |
| LAKE BOONE TRL from EDENBURGH RD to GLENWOOD AVE | Sidewalks | Design | E; inferred | — | — | — | Sidewalk Only |
| LAKE WHEELER RD from S SAUNDERS ST to MAYWOOD AVE | Sidewalks | Design | D; inferred | — | — | — | Major Street Improvement |
| MARSH CREEK RD from N NEW HOPE RD to TRAWICK RD | Sidewalks | Design | C; inferred | — | — | — | Major Street Improvement |
| Norris St from Virginia Ave to Glascock St | Sidewalks | Design | C; inferred | — | — | — | — |
| Oxford Rd from Kenmore Dr to Overbrook Dr | Sidewalks | Design | E; inferred | — | — | — | — |
| Plainview Ave from Dennis Ave to Birch Arbor Cir | Sidewalks | Design | C; inferred | — | — | — | — |
| Postell St, Freeman St & Coleman St from E Lenoir St to E Lenoir St | Sidewalks | Design | C; inferred | — | — | — | — |
| Rawls Dr from Poole Rd to Friar Tuck Rd | Sidewalks | Design | C; inferred | — | — | — | — |
| TRAWICK RD from CAPITAL BLVD to MARSH CREEK RD | Sidewalks | Design | C; inferred | — | — | — | Major Street Improvement |
| Valley Dr from Lynn Rd to Hatherleigh Ct | Sidewalks | Design | A; inferred | — | — | — | — |
| WAKE FOREST RD from LOUISBURG RD to CAPITAL BLVD | Sidewalks | Design | C; inferred | — | — | — | Major Street Improvement |
| WAKE FOREST RD from NEW RD to WHITAKER MILL RD | Sidewalks | Design | E; inferred | — | — | — | Sidewalk Only |
| WESTERN BLVD from AVENT FERRY RD to I 440 | Sidewalks | Design | D; inferred | — | — | — | Major Street Improvement |
| WESTERN BLVD from CHANEY RD to GORMAN ST | Sidewalks | Design | D; inferred | — | — | — | Major Street Improvement |
| WESTERN BLVD from MERENDINO ST to HILLSBOROUGH ST | Sidewalks | Design | D; inferred | — | — | — | Sidewalk Only |
| WOLFPACK from WESTERN S LINE RAIL to ATLANTIC AVE | Sidewalks | Design | A; inferred | — | — | — | — |
| Anderson Dr from Six Forks Rd to White Oak Rd | Traffic calming | Design; City: Projects in Design | E; inferred | — | — | — | — |
| Arnold Palmer Dr - W from Brier Club Ln to Brier Creek Pkwy | Traffic calming | Design; City: Projects in Design | E; inferred | — | — | — | — |
| Bellevue Rd from Terrace Dr to Ramblewood Dr | Traffic calming | Design; City: Approved for Construction | E | — | — | — | — |
| Bragg St from Garner Rd to S State St | Traffic calming | Design; City: Projects in Design | C | — | — | — | — |
| Bridgeport Dr - W from Creedmoor Rd to Abbottsbury Ct | Traffic calming | Design; City: Approved for Construction | A | — | — | — | — |
| Bunker Hill Dr from Cane Garden Dr to Madeline Way | Traffic calming | Design; City: Approved for Construction | C | — | — | — | — |
| Cape Charles Dr - N from Dominion Blvd to Cape Charles Dr | Traffic calming | Design; City: Projects in Design | E | — | — | — | — |
| Cashew Dr from Forestville Rd to Massey Preserve Trl | Traffic calming | Design; City: Projects in Design | B; inferred | — | — | — | — |
| Clarendon Cresc from New Bern Ave to Lord Ashley Rd | Traffic calming | Design; City: Projects in Design | C; inferred | — | — | — | — |
| Deblyn Ave from Glenwood Ave to Pleasant Valley Rd | Traffic calming | Design; City: Approved for Construction | E | — | — | — | — |
| Dennis Ave from Automotive Way to Mossbank Rd | Traffic calming | Design; City: Projects in Design | C | — | — | — | — |
| Donald Ross Dr from Poole Rd to New Bern Ave | Traffic calming | Design; City: Projects in Design | C | — | — | — | — |
| Eagle Trace Dr from Southall Rd to Linville Ridge Dr | Traffic calming | Design; City: Projects in Design | B; inferred | — | — | — | — |
| Falls River Ave - 2 from Summerton Dr to Watch Tower Ct | Traffic calming | Design; City: Approved for Construction | B | — | — | — | — |
| Falls River Ave - 3 from Watch Tower Ct to Dunn Rd | Traffic calming | Design; City: Approved for Construction | B | — | — | — | — |
| Falls River Ave - 5 from Bedfordtown Dr to St Pauls Sq | Traffic calming | Design; City: Approved for Construction | B | — | — | — | — |
| Falls River Ave - 7 from Wide River Dr to Dunn Rd | Traffic calming | Design; City: Approved for Construction | B | — | — | — | — |
| Fayetteville Rd from Martin Luther King Jr. Blvd to S Wilmington St. | Traffic calming | Design; City: Approved for Construction | D | — | — | — | — |
| Glascock St - E from N King Charles Rd to Culpepper Ln | Traffic calming | Design; City: Approved for Construction | C | — | — | — | — |
| Glendower Rd - S from Lynn Rd to Pleasant Grove Church Rd | Traffic calming | Design; City: Projects in Design | E; inferred | — | — | — | — |
| Glenwood Forest Dr from Glenwood Ave to Poyner Rd | Traffic calming | Design; City: Approved for Construction | E | — | — | — | — |
| Grand Traverse Dr from Eagle Trace Dr to Camargo Ln | Traffic calming | Design; City: Approved for Construction | B | — | — | — | — |
| Hadley Rd from Calloway Dr to Cross Link Rd | Traffic calming | Design; City: Approved for Construction | C | — | — | — | — |
| Harden Rd - E from Nancy Ann Dr to Myron Dr | Traffic calming | Design; City: Projects in Design | E | — | — | — | — |
| Harvest Oaks Dr from Strickland Rd to Forum Dr | Traffic calming | Design; City: Projects in Design | A; inferred | — | — | — | — |
| Hilburn Dr from Lynn Rd to Mayapple Pl | Traffic calming | Design; City: Projects in Design | E; inferred | — | — | — | — |
| Kelway Dr from Wakefield Plantation Dr to Wakefield Pine Dr | Traffic calming | Design; City: Approved for Construction | B | — | — | — | — |
| Kent Rd from Western Blvd to Kaplan Dr | Traffic calming | Design; City: Approved for Construction | D | — | — | — | — |
| Laurel Mountain Rd from Ray Rd to Lookout Mountain Rd | Traffic calming | Design; City: Approved for Construction | A | — | — | — | — |
| Maybrook Dr from Poole Rd to End | Traffic calming | Design; City: Approved for Construction | C | — | — | — | — |
| N King Charles Rd - S from New Bern Ave to Oakwood Traffic Circle | Traffic calming | Design; City: Projects in Design | C | — | — | — | — |
| Oak Park Rd - E from Glenwood Ave to Connell Dr | Traffic calming | Design; City: Approved for Construction | E | — | — | — | — |
| Pleasant Grove Church Rd from W Millbrook Rd to Pleasant Pines Dr | Traffic calming | Design; City: Approved for Construction | E | — | — | — | — |
| Powell Dr from Western Blvd to Melbourne Rd | Traffic calming | Design; City: Approved for Construction | D | — | — | — | — |
| Poyner Rd from Glenwood Forest Dr to End | Traffic calming | Design; City: Approved for Construction | E | — | — | — | — |
| Proctor Rd from Rock Quarry Rd to Southgate Dr | Traffic calming | Design; City: Approved for Construction | C | — | — | — | — |
| Rembert Dr from Glenwood Ave to Brookhaven Dr | Traffic calming | Design; City: Approved for Construction | E | — | — | — | — |
| S King Charles Rd from New Bern Ave to Poole Rd | Traffic calming | Design; City: Approved for Construction | C | — | — | — | — |
| S Pettigrew St from Pettis Pl to New Bern Ave | Traffic calming | Design; City: Projects in Design | C | — | — | — | — |
| Saddle Seat Dr from Western Blvd to Bashford Rd | Traffic calming | Design; City: Projects in Design | D | — | — | — | — |
| Snelling Rd from Dixon Dr to W Millbrook Rd | Traffic calming | Design; City: Projects in Design | A | — | — | — | — |
| Starmount Dr from Capital Blvd to Jupiter St | Traffic calming | Design; City: Approved for Construction | C | — | — | — | — |
| Steinbeck Dr from Wingate Dr to Bland Rd | Traffic calming | Design; City: Approved for Construction | A | — | — | — | — |
| Trailwood Hills Dr from Tryon Rd to Lineberry Dr | Traffic calming | Design; City: Projects in Design | D | — | — | — | — |
| Turf Grass Ct from N Rogers Ln to Marsh Grass Dr | Traffic calming | Design; City: Approved for Construction | C | — | — | — | — |
| Volant Dr from Spring Forest Rd to Falls Church Rd | Traffic calming | Design; City: Projects in Design | A; inferred | — | — | — | — |
| Wake Towne Dr from Wake Forest Rd to End | Traffic calming | Design; City: Projects in Design | E; inferred | — | — | — | — |
| Wide River Dr from Falls River Ave to Falls of the Neuse Rd | Traffic calming | Design; City: Approved for Construction | B | — | — | — | — |
| Wycliff Rd from Lake Boone Trl to Morningisde Dr | Traffic calming | Design; City: Approved for Construction | E | — | — | — | — |
| [Big Branch Greenway Trail](https://raleighnc.gov/projects/big-branch-greenway-connector) | Parks and greenways | Design | A; inferred | PRCR Greenways | Dale Tiska / Kris Nikfar | — | Construction of approximately 4,030' of new greenway trail along Big Branch. |
| [Fire Station 1](https://raleighnc.gov/projects/fire-station-1-replacement) | Parks and greenways | Design; City: Early Design | D; inferred | Engineering Services | Beth Nooe, ES/CM-PSSP, Stephanie Seeber, PA AIA | — | — |
| Greenway Streambank Restoration — Crabtree Creek West | Parks and greenways | Design | E; inferred | PRCR Greenways | Noah Otto | — | Restoration of several areas of streambank between Lindsay Dr and Duraliegh Rd |
| [Lake Lynn Greenway Drainage Improvements](https://raleighnc.gov/projects/lake-lynn-west-loop-trail-project) | Parks and greenways | Design | E; inferred | PRCR Greenways | Jaleel Alsarray/ Mark Heinicke | — | Trail Improvements along the west side of Lake Lynn loop |
| Mine Creek Greenway Trail | Parks and greenways | Design | A; inferred | PRCR Greenways | Lexi Yates/ Kimberly Siran | — | Improvements to existing greenway trail - construction following RW resleeve and replace |
| [Neighborhood and Community Connections (NCC 2022)](https://raleighnc.gov/parks-and-recreation/services/neighborhood-community-connections-program) | Parks and greenways | Design | C; inferred | PRCR Greenways | Kimerly Siran | — | — |
| Sunnybrook Road Park Connector (NCC 2014) | Parks and greenways | Design; City: Permitting | — | PRCR Greenways | Ed Stampien @ Raleigh Water/Noah Otto | — | Construction of approximately 3,765 lf of greenway trail, on west side of Crabtree Creek |
| [Walnut Creek Greenway Trail](https://raleighnc.gov/projects/walnut-creek-trail) | Parks and greenways | Design | C; inferred | PRCR Greenways | Dale Tiska/ Kris Nikfar | — | Improvements to existing greenway trail - multiple structure replacement or widening, re-alignment of some sections |
| 15 Summit Avenue | Housing bond | Design; City: Pre-Construction | — | — | — | $368,573 | Public Private Partnerships |
| 5507/5511 Hillsborough St Acquisition | Housing bond | Design; City: Pre-Construction | — | — | — | $2,564,736 | Site Acquisition |
| 5508 Western Blvd | Housing bond | Design; City: Pre-Construction | — | — | — | $1,526,555 | Site Acquisition |
| Duplex Village | Housing bond | Design; City: Pre-Construction | — | — | — | $2,880,000 | Public Private Partnerships |
| East Cabarrus | Housing bond | Design; City: Pre-Construction | — | — | — | $1,000,000 | Public Private Partnerships |
| Fisher Grove | Housing bond | Design; City: Pre-Construction | C | — | — | $2,490,000 | Public Private Partnerships |
| Lorimer Spring | Housing bond | Design; City: Pre-Construction | D | — | — | $1,125,000 | Public Private Partnerships |
| Zack's Grocery Mart | Housing bond | Design; City: Pre-Construction | — | — | — | $2,937,509 | Site Acquisition |
| 495-Mitchell Mill Road 16" Transmission Installation (Discharge of PS) | Capital improvement projects | Planning | — | Raleigh Water | Todd Toler | — | — |
| 503 W Gannon Manhole Replacement | Capital improvement projects | Planning | — | Raleigh Water | Julie Parham | — | — |
| 6341 Wynbrook Way Sewer Extension | Capital improvement projects | Planning | A; inferred | Raleigh Water | Julie Parham | — | — |
| Aversboro PS Basin Improvements Study | Capital improvement projects | Planning | — | Raleigh Water | Courtney Licata | — | — |
| Bain Pump Station Upgrades | Capital improvement projects | Planning | D; inferred | Raleigh Water | Breanne Wood | — | — |
| Birchford Court Stormwater Improvements - DA | Capital improvement projects | Planning | C; inferred | Stormwater | — | — | — |
| Braceridge Road Area Drainage Improvements | Capital improvement projects | Planning | E; inferred | Stormwater | — | — | — |
| Braceridge Road Area Drainage Improvements | Capital improvement projects | Planning; City: Not Started | E; inferred | — | — | — | — |
| Brewster Drive Drainage Improvements | Capital improvement projects | Planning | D; inferred | Stormwater | — | — | — |
| Bridge Repairs - Major, Century Bridge + Mountford Bridge | Capital improvement projects | Planning; City: Pre-Approval | E; inferred | Transportation | — | — | — |
| Brier Creek Outfall | Capital improvement projects | Planning | E; inferred | Raleigh Water | Breanne Wood | — | — |
| Burt Drive Sidewalk | Capital improvement projects | Planning; City: Programmed | D; inferred | Transportation | — | — | — |
| Camp Pond Lake/Dam | Capital improvement projects | Planning; City: Not Started | D; inferred | — | — | — | — |
| [Carnage Magnet Middle School Stream Restoration](https://raleighnc.gov/projects/carnage-magnet-middle-school-stream-restoration) | Capital improvement projects | Planning | C; inferred | Stormwater | — | — | — |
| [Carolina Avenue Petitioned Street & Sidewalk Improvements](https://raleighnc.gov/projects/carolina-avenue-street-and-sidewalk-petition-request) | Capital improvement projects | Planning; City: Programmed | D; inferred | Transportation | — | — | — |
| Carolina Pines Water Quality Improvements | Capital improvement projects | Planning; City: Not Started | D; inferred | — | — | — | — |
| [Chavis-Dix Strollway](https://raleighnc.gov/projects/chavis-dix-strollway) | Capital improvement projects | Planning; City: Pre-Approval | C; inferred | Transportation | — | — | — |
| City Plaza Shade Structures | Capital improvement projects | Planning | D; inferred | General Government | — | — | — |
| CORPUD Space Study (Dew.&HH): LW Annex Second Floor-Renovation | Capital improvement projects | Planning | C; inferred | Raleigh Water | Todd Toler | — | — |
| DE Benton Dual Media and Filter Expansion | Capital improvement projects | Planning | — | Raleigh Water | Breanne Wood | — | — |
| DEB WTP Dewatering Capacity Improvements | Capital improvement projects | Planning | — | Raleigh Water | Vinod Korategere | — | — |
| [Dix Park Rocky Branch Enhancement Project](https://dixpark.org/park-planning) | Capital improvement projects | Planning | D; inferred | Parks, Recreation & Cultural Resources | — | — | — |
| Downtown Pedestrian Project Phase 2 | Capital improvement projects | Planning; City: Programmed | D; inferred | Transportation | — | — | — |
| East Raleigh Regional Study | Capital improvement projects | Planning | — | Raleigh Water | Matt Cotton | — | — |
| East Raleigh Wastewater Conveyance | Capital improvement projects | Planning | — | Raleigh Water | Matt Cotton | — | — |
| EMJ Filter Addition | Capital improvement projects | Planning | B; inferred | Raleigh Water | Ed Stempien | — | — |
| EMJ WTP Generator Expansion Phase 3 and RWPS Generator 1 Replacement | Capital improvement projects | Planning | B; inferred | Raleigh Water | Vinod Korategere | — | — |
| EMJ WTP Sludge Conveyance Improvements | Capital improvement projects | Planning | B; inferred | Raleigh Water | Vinod Korategere | — | — |
| EMJWTP Lagoon Liner | Capital improvement projects | Planning | B; inferred | Raleigh Water | Breanne Wood | — | — |
| Fire Station 1/ Headquarters | Capital improvement projects | Planning; City: Programmed | D; inferred | Fire | — | — | — |
| Fire Training Center | Capital improvement projects | Planning; City: Programmed | C; inferred | Fire | — | — | — |
| [Five Points Streetscape and Safety Study](https://raleighnc.gov/fivepointsstreetscape) | Capital improvement projects | Planning | E; inferred | Transportation | — | — | — |
| Fox Road Elementary Sidewalk | Capital improvement projects | Planning; City: Programmed | B; inferred | Transportation | — | — | — |
| Frank Street Neighborhood Improvements | Capital improvement projects | Planning | C; inferred | Stormwater | — | — | — |
| Galvanized Main Replacement – Phase 1 | Capital improvement projects | Planning | A; inferred | Raleigh Water | Kevin Braxton | — | — |
| Genford Court Drainage Improvements - DA | Capital improvement projects | Planning | A; inferred | Stormwater | — | — | — |
| Glenbrook Area Flood Hazard Reduction | Capital improvement projects | Planning; City: Not Started | C; inferred | — | — | — | — |
| Glenwood At Myrtle Ave Sewer Improvements | Capital improvement projects | Planning | E; inferred | Raleigh Water | Kristen Pierce | — | — |
| Glenwood Ave. and Creston | Capital improvement projects | Planning; City: Not Started | E; inferred | — | — | — | — |
| Granville Dr. Street & Sidewalk Petitioned Improvements | Capital improvement projects | Planning; City: Programmed | E; inferred | Transportation | — | — | — |
| Highway 50 Corridor Odor Study | Capital improvement projects | Planning | — | Raleigh Water | Courtney Licata | — | — |
| Indian Creek Trail PS Abandonment | Capital improvement projects | Planning | — | Raleigh Water | Vinod Korategere | — | — |
| Jones Sausage Transmission Main | Capital improvement projects | Planning | — | Raleigh Water | Justin Biegler | — | — |
| Kelford Street Sidewalk | Capital improvement projects | Planning; City: Programmed | D; inferred | Transportation | — | — | — |
| Kingsborough Estates Mobile Home Park | Capital improvement projects | Planning; City: Not Started | C; inferred | — | — | — | — |
| Lake Glad PS VE Study | Capital improvement projects | Planning | — | Raleigh Water | Matt Cotton | — | — |
| Lead and Copper Rule Revisions | Capital improvement projects | Planning | B; inferred | Raleigh Water | Breanne Wood | — | — |
| Lead Mine Rd. Sidewalk - Charles Dr. to Sugar Bush Rd. | Capital improvement projects | Planning; City: Programmed | A; inferred | Transportation | — | — | — |
| Lions Park GSI Retrofit | Capital improvement projects | Planning; City: Not Started | C; inferred | — | — | — | — |
| Little Creek RRF Speculative Limits | Capital improvement projects | Planning | — | Raleigh Water | Matt Cotton | — | — |
| Lizard Lick Water Transmission Main | Capital improvement projects | Planning | — | Raleigh Water | Courtney Licata | — | — |
| Lower Harris Creek Interceptor | Capital improvement projects | Planning | B; inferred | Raleigh Water | Justin Biegler | — | — |
| Marcom Street Petitioned Sidewalk | Capital improvement projects | Planning; City: Programmed | D; inferred | Transportation | — | — | — |
| Marcom Street Sidewalk | Capital improvement projects | Planning; City: Programmed | D; inferred | Transportation | — | — | — |
| Marsh Creek Watershed Study | Capital improvement projects | Planning | A; inferred | Stormwater | — | — | — |
| [Midtown Multimodal Bridge](https://raleighnc.gov/projects/midtown-multimodal-bridge) | Capital improvement projects | Planning | E; inferred | Transportation | — | — | — |
| Millbrook Exchange Park Repairs | Capital improvement projects | Planning; City: Not Started | A; inferred | — | — | — | — |
| Mine Creek Outfall East | Capital improvement projects | Planning | A; inferred | Raleigh Water | Lorea Sample | — | — |
| Mitchell Mill Road 24" Transmission Installation (Suction of PS) | Capital improvement projects | Planning | — | Raleigh Water | Todd Toler | — | — |
| Mitchell Mill Road Pump Station | Capital improvement projects | Planning | — | Raleigh Water | Todd Toler | — | — |
| ML KJr Blvd Pedestrian Improvements | Capital improvement projects | Planning; City: Programmed | C; inferred | Transportation | — | — | — |
| ML KJr Blvd Pedestrian Improvements | Capital improvement projects | Planning; City: Programmed | C; inferred | Transportation | — | — | — |
| ML KJr Blvd Pedestrian Improvements | Capital improvement projects | Planning; City: Programmed | C; inferred | Transportation | — | — | — |
| MLK Jr Blvd Pedestrian Improvements | Capital improvement projects | Planning; City: Programmed | C; inferred | Transportation | — | — | — |
| MLK Jr Blvd Pedestrian Improvements | Capital improvement projects | Planning; City: Programmed | C; inferred | — | — | — | — |
| NCDOT P-5727 Millbrook Rd (HDR) | Capital improvement projects | Planning; City: Pre-Approval | A; inferred | Raleigh Water | Todd Toler | — | — |
| NCMA Stream Restoration | Capital improvement projects | Planning; City: Not Started | E; inferred | — | — | — | — |
| Neighborhood Drainage Studies (Kingsborough, Saybrook, Atlantic & Hodges) | Capital improvement projects | Planning | A; inferred | Stormwater | — | — | — |
| Neptune Drive Drainage Improvements | Capital improvement projects | Planning | C; inferred | Stormwater | — | — | — |
| Neuse River Intake Supply Study | Capital improvement projects | Planning | — | Raleigh Water | Breanne Wood | — | — |
| [New Bern at Freedom Improvements](https://raleighnc.gov/projects/new-bern-avenue-freedom-drive-road-improvements) | Capital improvement projects | Planning | C; inferred | Transportation | — | — | — |
| North Hills Dr. Sidewalk - Lead Mine Rd. to Hillock Dr. | Capital improvement projects | Planning; City: Programmed | A; inferred | Transportation | — | — | — |
| North Ridge Country Club | Capital improvement projects | Planning; City: Not Started | A; inferred | — | — | — | — |
| North Ridge Country Club | Capital improvement projects | Planning | A; inferred | Stormwater | — | — | — |
| NRRRF Headworks Improvements | Capital improvement projects | Planning; City: Programmed | — | Raleigh Water | Edward Stempien | — | — |
| NRRRF Permitting Study | Capital improvement projects | Planning | — | Raleigh Water | Matt Cotton | — | — |
| NRRRF Reuse Pump Stations Evaluations | Capital improvement projects | Planning | — | Raleigh Water | Dan Williams | — | — |
| NRRRF Warehouse Planning Study | Capital improvement projects | Planning | — | Raleigh Water | Kristen Pierce | — | — |
| Pecan Road Sidewalks near Transit Stops | Capital improvement projects | Planning; City: Programmed | D; inferred | Transportation | — | — | — |
| Perry Creek Water Transmission Main | Capital improvement projects | Planning | B; inferred | Raleigh Water | Kristen Pierce | — | — |
| Poole Road West Main Replacement | Capital improvement projects | Planning; City: Programmed | C; inferred | Raleigh Water | Ed Stempien | — | — |
| Priority 1 Pump Station Upgrades - Phase 2 | Capital improvement projects | Planning | B; inferred | Raleigh Water | Kevin Braxton | — | — |
| [Rocky Branch/Central Walnut Watershed Study](https://raleighnc.gov/projects/rocky-branch-central-walnut-creek-watershed-study) | Capital improvement projects | Planning | D; inferred | Stormwater | — | — | — |
| [Royal Street Stream Stabilization](https://raleighnc.gov/projects) | Capital improvement projects | Planning | D; inferred | Stormwater | — | — | — |
| [Ruffin St Headwall Replacement Project](https://raleighnc.gov/projects) | Capital improvement projects | Planning | D; inferred | Stormwater | — | — | — |
| Sanitary Sewer Capacity Study | Capital improvement projects | Planning | — | Raleigh Water | Breanne Wood | — | — |
| Second Avenue Sewer Extension | Capital improvement projects | Planning | — | Raleigh Water | Leticia Rieger | — | — |
| Sewer System Program Management | Capital improvement projects | Planning | — | Raleigh Water | Kristen Pierce | — | — |
| Southwest Beaverdam Sewer Replacement | Capital improvement projects | Planning | E; inferred | Raleigh Water | Breanne Wood | — | — |
| Southwest DT Ped and Bike Gateway | Capital improvement projects | Planning | D; inferred | Transportation | — | — | — |
| Stacy Street Drainage Improvements | Capital improvement projects | Planning | D; inferred | Stormwater | — | — | — |
| State Street Main Replacement (CDM): Phase 3 | Capital improvement projects | Planning | C; inferred | Raleigh Water | Todd Toler | — | — |
| State Street Main Replacement (CDM): Phase 5 | Capital improvement projects | Planning | C; inferred | Raleigh Water | Todd Toler | — | — |
| Structure from 32 to 33 Replacement + Asphalt Repave | Capital improvement projects | Planning | A; inferred | Parks, Recreation & Cultural Resources | — | — | — |
| Sweetbrier/Crescent Court | Capital improvement projects | Planning; City: Not Started | A; inferred | — | — | — | — |
| [Tarboro Street Corridor Project](https://raleighnc.gov/projects/tarboro-street-corridor-project) | Capital improvement projects | Planning | C; inferred | Transportation | — | — | — |
| Twin 72-Inch Diameter Sanitary Sewer Interceptor - Phase II | Capital improvement projects | Planning | — | Raleigh Water | Ed Stempien | — | — |
| US401 24" Transmission | Capital improvement projects | Planning | B; inferred | Raleigh Water | Kevin Braxton | — | — |
| Wade Ave Sidewalk - St Marys to Glenwood | Capital improvement projects | Planning; City: Programmed | D; inferred | Transportation | — | — | — |
| [Wake BRT Southern Corridor](https://raleighnc.gov/projects/wake-brt-southern-corridor) | Capital improvement projects | Planning | D; inferred | Raleigh Water | Julie Parham | — | — |
| Wake Forest Rd. to Navaho (under I 440)-(CJS) | Capital improvement projects | Planning | E; inferred | Raleigh Water | Todd Toler | — | — |
| Walnut Creek Interceptor Phase III | Capital improvement projects | Planning | D; inferred | Raleigh Water | Courtney Licata | — | — |
| Whispering Branch and Woodowl Drainage Project | Capital improvement projects | Planning | E; inferred | Stormwater | — | — | — |
| Yarmouth Road-Edenburgh Road Requested Street Improvements | Capital improvement projects | Planning; City: Pre-Approval | E; inferred | Transportation | — | — | — |
| Blue Ridge & Glenwood | Vision Zero safety | Planning; City: Funded | E | — | — | — | Add pedestrian accomodations at 3 legs, APS, LPI, backplates. |
| Buffaloe & Southall | Vision Zero safety | Planning; City: Funded | D | — | — | — | Install pedestrian accommodations at 2 legs (N and W). |
| Buffaloe & Tallyhoe | Vision Zero safety | Planning; City: Funded | D | — | — | — | Install guardrail on approach to culvert. |
| Buffaloe & Valley Stream | Vision Zero safety | Planning; City: Funded | C | — | — | — | Install pedestrian accommodations at all 4 legs of the intersection. |
| Capital - Huntleigh - Trawick | Vision Zero safety | Planning; City: Funded | C | — | — | — | Install retroreflective backplates, APS, LPI, flatwork upgrades, new controller, additional signal heads, provide automatic ped recall for signal heads along Capital. |
| Cashew & Forestville | Vision Zero safety | Planning; City: Funded | B | — | — | — | New signal, fiber optic from adjacent signal, and pedestrian accommodations, APS, LPI. (Harris Creek Elementary) |
| Cole & Glenwood | Vision Zero safety | Planning; City: Funded | D | — | — | — | Construct left turn lanes on Glenwood Ave. |
| Country Trail - Leesville - Tylerton | Vision Zero safety | Planning; City: Funded | E | — | — | — | Install traffic signal. |
| Creedmoor (Sawmill, Stonehenge, Brennan, Baileywick) | Vision Zero safety | Planning; City: Funded | — | — | — | — | Installation of NB and SB FYAs. |
| Dillard & Orabelle | Vision Zero safety | Planning; City: Funded | D | — | — | — | New signal, fiber optic from adjacent signal, and pedestrian accommodations, APS, LPI, reduce crossing width. (Dillard Drive Magnet Middle School) |
| Downtown Pedestrian Project Phase 2 | Vision Zero safety | Planning; City: Funded | D | — | — | — | Pedestrian safety upgrades throughout Downtown Raleigh including curb extensions, raised crosswalks, RRFBs, striping improvements, and installation of a few HAWKs and 1 traffic signal. |
| Duckling - New Bern | Vision Zero safety | Planning; City: Funded | B | — | — | — | Construction of a left over at Duckling Way/New Bern. Removal of pavement for former Old US 64. |
| Duraleigh north of Edwards Mill | Vision Zero safety | Planning; City: Funded | E | — | — | — | Install guardrail for NB run off the road crashes. |
| Edenton & Harrington | Vision Zero safety | Planning; City: Funded | D | — | — | — | Signalization of intersection. |
| Edwards Mill & Trinity | Vision Zero safety | Planning; City: Funded | D | — | — | — | Ped accomodations. |
| Edwards Mill & Wade | Vision Zero safety | Planning; City: Funded | D | — | — | — | Add FYAs and pedestrian heads for existing crosswalks. |
| Eva Mae & New Hope | Vision Zero safety | Planning; City: Funded | C | — | — | — | Signalization of intersection with road widening to add left turn lanes NB and SB. Includes pedestrian accommodations and fills a few sidewalk gaps. |
| Falls of Neuse - Raven Ridge | Vision Zero safety | Planning; City: Funded | B | — | — | — | Stripe an exclusive left, thru, and right turn lane on the WB Raven Ridge approach to the intersection, and all associated signal work. |
| Falls of Neuse & Newton | Vision Zero safety | Planning; City: Funded | A | — | — | — | NB and EB 3 section bimodal heads, pedestrian accommodations at south leg, upgrade crosswalks to hi&vis, APS, LPI. |
| Falls of Neuse & North Bend | Vision Zero safety | Planning; City: Funded | A | — | — | — | NB and EB 3 section bimodal heads, pedestrian accommodations at south leg, upgrade crosswalks to hi&vis, APS, LPI. |
| Fidelity & Gulf | Vision Zero safety | Planning; City: Funded | E | — | — | — | Signalization of intersection. |
| Front - I-440 - Six Forks | Vision Zero safety | Planning; City: Funded | A | — | — | — | Install supplemental signal heads, backplates, median to channelize right turn exit ramp, signalize right turn exit ramp, APS, LPI, provide RRFBs at uncontrolled exit ramps throughout interchange, upgrade crosswalk markings. |
| Garner - Tryon | Vision Zero safety | Planning; City: Funded | D | — | — | — | Install backplates and protected left capabilities. Install crosswalk on N and E legs with LPI. Connect SE Sidewalk to intersection. |
| Glascock - Raleigh | Vision Zero safety | Planning; City: Funded | C | — | — | — | Install supplemental signal heads, implement NTOR EB, upgrade ramps, install APS, LPI, install a curb bumpout, install new ped posts. |
| Glendower & Lynn | Vision Zero safety | Planning; City: Funded | E | — | — | — | Signalization of intersection including pedestrian heads for all 4 legs. |
| Glenwood & Hilburn | Vision Zero safety | Planning; City: Funded | E | — | — | — | Pedestrian safety upgrades including crosswalks for missing legs, hi&vis striping, LPI, APS, straighten crosswalk, sidewalk gap. |
| Grove Barton & Pinecrest | Vision Zero safety | Planning; City: Funded | E | — | — | — | Signalization of intersection. |
| Hardimont - New Hope Church - Wake Forest | Vision Zero safety | Planning; City: Funded | A | — | — | — | Install Crosswalks, Pedestrian signals, and other safety improvements at intersection and adjacent driveways/sidestreets |
| I-440 & Saunders | Vision Zero safety | Planning; City: Funded | D | — | — | — | Add north to south pedestrian accessibility along Saunders St through the interchange |
| Lake Wheeler Bridge over I-440 | Vision Zero safety | Planning; City: Funded | D | — | — | — | Installation of pedestrian safety fencing along the west side of bridge. |
| Martin Luther King from Wilmington to Poole | Vision Zero safety | Planning; City: Funded | C | — | — | — | Pedestrian Safety Upgrades including curb ramps, hi&vis crosswalks, APS and signal upgrades. |
| Martin Luther King Jr - Wilmington to East | Vision Zero safety | Planning; City: Funded | C | — | — | — | Pedestrian Safety Upgrades including curb ramps, hi-vis crosswalks, and signal upgrades. |
| Martin Luther King Jr from Garner to Haywood | Vision Zero safety | Planning; City: Funded | C | — | — | — | Pedestrian Safety Upgrades including curb ramps, hi-vis crosswalks, and signal upgrades. |
| Martin Luther King Jr from Gregg to Rock Quarry | Vision Zero safety | Planning; City: Funded | C | — | — | — | Pedestrian Safety Upgrades including curb ramps, hi-vis crosswalks, and signal upgrades. |
| Martin Luther King Jr from Raleigh to Poole | Vision Zero safety | Planning; City: Funded | C | — | — | — | Pedestrian Safety Upgrades including curb ramps, hi-vis crosswalks, and signal upgrades. |
| MLK - Salisbury - Wilmington | Vision Zero safety | Planning; City: Funded | D | — | — | — | Install a second left turn lane for NB Wilmington, install a pedestrian refuge island for the eastern crosswalk, upgrade crosswalks to high visibility. |
| Oakwood & Raleigh St | Vision Zero safety | Planning; City: Funded | C | — | — | — | Add FYAs, LPI, APS. |
| Ollie - Ronald - Wake Forest | Vision Zero safety | Planning; City: Funded | A | — | — | — | Install NB left turn FYA, provide a new pedestrian signal phase on north leg, upgrade/install new flatwork, refresh markings, install APS/LPI. |
| Person & Polk | Vision Zero safety | Planning; City: Funded | C | — | — | — | Signalization of intersection |
| Poole & Samuel | Vision Zero safety | Planning; City: Funded | C | — | — | — | Signalization of intersection. |
| Tryon - Wilmington | Vision Zero safety | Planning; City: Funded | D | — | — | — | Install Hi-vis crosswalks, LPI, delineator bumpouts, sidewalk gaps, backplates, and near side signal heads. |
| Aberdeen Dr from Rose Ln to End | Sidewalks | Planning; City: FUNDED | C; inferred | — | — | — | Sidewalk and street improvement |
| ACC BLVD from MOUNT HERMAN | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | E; inferred | — | — | — | — |
| ACC BLVD from NEAR COURTNEY to MOUNT HERMAN | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | E; inferred | — | — | — | — |
| Alloy St/ Glendridge Dr/ Bardwell Rd from Highwoods Blvd to Brentwood Rd | Sidewalks | Planning; City: PLANNED | A; inferred | — | — | — | — |
| ANDERSON DR from ST MARYS ST to OVERBROOK DR | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | Sidewalk Only |
| AUBURN CHURCH RD from EAGLE CREST WAY to WALL STORE RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| AUBURN CHURCH RD from JONES SAUSAGE RD to EAGLE CREST WAY | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| AVENT FERRY RD from LAKE JOHNSON PARK to LAKE JOHNSON PARK | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | Major Street Improvement |
| Bailey Dr/ Boaz Rd/ Darby St from Waller Pl to S State St | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | — |
| BARWELL RD from BRITT DR to POOLE RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| BARWELL RD from NEALS CREEK DR to BRITT DR | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | C; inferred | — | — | — | Major Street Improvement |
| BASHFORD RD from SADDLE SEAT DR to STROTHER RD | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | Curb and Gutter |
| BATTLE BRIDGE RD from GRANITE QUARRY DR to GRIFFINS GLEN DR | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| BATTLE BRIDGE RD from GRIFFINS GLEN DR to MAGNOLIA POND RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| BATTLE BRIDGE RD from ROCK QUARRY RD to GRANITE QUARRY DR | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | C; inferred | — | — | — | Major Street Improvement |
| Bayberry Ln/ Pastille Ln from Basil Dr to Bramblewood Dr | Sidewalks | Planning; City: PLANNED | A; inferred | — | — | — | — |
| Bennett St from Glascock St to Dennis Ave | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | — |
| BERYL RD from BLUE RIDGE RD to RR CROSSING | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | Sidewalk Only |
| Beverly Dr from Little John Rd to Poole Rd | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | — |
| BLAND RD from STEINBECK DR to HARDIMONT RD | Sidewalks | Planning; City: PLANNED | A; inferred | — | — | — | Sidewalk Only |
| BLUE RIDGE RD from DISTRICT DR to REEDY CREEK RD | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | Sidewalk Only |
| Bluffridge Dr from Bridgeport Dr to Sawmill Rd | Sidewalks | Planning; City: PLANNED | A; inferred | — | — | — | — |
| Bragg St from S Blount St to Garner Rd | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | — |
| BRIDGEPORT DR from ABBOTSBURY CT to TIDE CT | Sidewalks | Planning; City: PLANNED | A; inferred | — | — | — | Curb and Gutter |
| Brookhaven Dr from Rembert Dr to Glenwood Ave | Sidewalks | Planning; City: FUNDED | E; inferred | — | — | — | — |
| Brooks Ave from Wade Ave to Lake Boone Trl | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | — |
| BUFFALOE RD from BUFFALOE ROAD ATHLETIC PARK to NEUSE RIVER GREENWAY | Sidewalks | Planning; City: PLANNED | — | — | — | — | Major Street Improvement |
| BUFFALOE RD from FORESTVILLE RD to OLD MILBURNIE RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| BUFFALOE RD from N NEW HOPE RD to SOUTHALL RD | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | Sidewalk Only |
| BUFFALOE RD from NEUSE RIVER GREENWAY to FORESTVILLE RD | Sidewalks | Planning; City: PLANNED | — | — | — | — | Major Street Improvement |
| BUFFALOE RD from OLD MILBURNIE RD to OLD CREWS RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| BUFFALOE RD from SOUTHALL to BUFFALOE ROAD ATHLETIC PARK | Sidewalks | Planning; City: PLANNED | — | — | — | — | Major Street Improvement |
| Burt Dr from Stovall Dr to Gorman St | Sidewalks | Planning; City: FUNDED | D; inferred | — | — | — | — |
| Canterbury Rd from Wade Ave to Lewis Farm Rd | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | — |
| Cape Charles Dr from Dominion Blvd to Renfield Dr | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | — |
| CAPITAL BLVD from 1/2 MILE WEST OF WAKE FOREST RD RAMP to WAKE FOREST RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | C; inferred | — | — | — | Major Street Improvement |
| CAPITAL BLVD from CRABTREE BLVD to END OF I-5970 PROJECT | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | C; inferred | — | — | — | Major Street Improvement |
| CAPITAL BLVD from WAKE FOREST RD to CRABTREE BLVD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | C; inferred | — | — | — | Major Street Improvement |
| Carolina Ave from Scarlet Maple Dr to Western Blvd | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | — |
| Carolina Ave from Western Blvd to Powell Dr | Sidewalks | Planning; City: FUNDED | D; inferred | — | — | — | — |
| Carteret Dr/ Morehead Dr from Rembert Dr to Glenwood Ave | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | — |
| CHAPEL HILL RD from EDWARDS MILL RD to HILLSBOROUGH ST | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | D; inferred | — | — | — | Major Street Improvement |
| CHAPEL HILL RD from I 40 RAMP to NOWELL RD | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | Major Street Improvement |
| CHAPEL HILL RD from NOWELL RD to EDWARDS MILL RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | D; inferred | — | — | — | Major Street Improvement |
| Chappell Dr from Avent Ferry Rd to Broadwell Dr | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | — |
| Chatham Ln from Bertie Dr to Glascock St | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | — |
| Churchill Rd from Ridge Rd to Brooks Ave | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | — |
| Cobblestone Ct from Ridge Rd to Chrisdale Ct | Sidewalks | Planning; City: FUNDED | E; inferred | — | — | — | — |
| CORPORATION PKWY from NEW BERN AVE to LAKE WOODARD DR | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | C; inferred | — | — | — | Sidewalk Only |
| COUNTRY TRL from PINECREST RD to TROUTMAN LN | Sidewalks | Planning; City: PLANNED | — | — | — | — | Curb and Gutter |
| Craven Dr/ Alamance Dr/ Yadkin Dr from Pasquotank Dr to Alleghany Dr | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | — |
| CREECH RD from ADCOX PL to QUARTZ CT | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | Sidewalk Only |
| CREECH RD from ADCOX PL to QUARTZ CT | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Sidewalk Only |
| CREECH RD from SANDERFORD RD to COLONY DR | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| CREEKSIDE from INDUSTRIAL to WAKE FOREST RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | E; inferred | — | — | — | — |
| Crown Crossing Ln from Cross Link Rd to Fitzgerald Dr | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | Sidewalk Only |
| Daingerfield Dr/ Dewing Dr/ Pritchard Ct from Neuse Crossing Dr to Serendipity Dr | Sidewalks | Planning; City: PLANNED | B; inferred | — | — | — | — |
| Dansey Dr from Nesbit Ct to US 401 | Sidewalks | Planning; City: PLANNED | B; inferred | — | — | — | — |
| Dennis Ave from Capital Blvd to Timber Dr | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | — |
| DEPARTURE DR from DISCOVERY DR to OAK FOREST DR | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | A; inferred | — | — | — | Sidewalk Only |
| DEPARTURE DR from E MILLBROOK RD to SPRING FOREST RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | B; inferred | — | — | — | Sidewalk Only |
| DILLARD DR from JONES FRANKLIN RD to TRYON RD | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | Major Street Improvement |
| DISTRICT DR from BLUE RIDGE RD to GOLD STAR DR | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | D; inferred | — | — | — | Sidewalk Only |
| DIXIE TRL from CHURCHILL RD to GRANT AVE | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | Sidewalk Only |
| DIXIE TRL from HILLSBOROUGH ST to EVERETT AVE | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | Sidewalk Only |
| Dominion Blvd/ Cape Charles Dr from Center Cross Ct to Leesburg Ln | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | — |
| DONALD ROSS from NEW BERN AVE to POOLE | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | C; inferred | — | — | — | — |
| Dowling Rd from Carolina Cherry Dr to Old Poole Rd | Sidewalks | Planning; City: PLANNED | — | — | — | — | — |
| DUNN RD from COKESBURY LN to FALLS LANDING DR | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| Dunn Rd from Neland St to Greenway Entrance | Sidewalks | Planning; City: PLANNED | B; inferred | — | — | — | Sidewalk Only |
| E Jones St from N State St to Hill St | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | — |
| E Lane St from Linden Ave to Hill St | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | — |
| E Lee St from S Blount St to S East St | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | — |
| E Roanoke Park Rd/ Pershing Rd from Sunrise Ave to Center Rd | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | — |
| E SIX FORKS RD from ATLANTIC AVE to INDUSTRIAL DR | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | Sidewalk Only |
| E WHITAKER MILL from ATLANTIC to WAKE FOREST RD | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | Sidewalk Only |
| EDENBURGH RD from GLENWOOD AVE to LAKE BOONE TRL | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | Curb and Gutter |
| EDWARDS MILL RD from CRABTREE to PARKLAKE | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | Curb and Gutter |
| EDWARDS MILL RD from DURALEIGH RD to REEDY CREEK RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | D; inferred | — | — | — | Sidewalk Only |
| EDWARDS MILL RD from STEPHEN STROUD to WADE PARK | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | Major Street Improvement |
| Englehardt Dr from Leesville Rd to Erinsbrook Dr | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | — |
| FAIRBANKS DR from LEESVILLE RD to WESTGATE RD | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | Major Street Improvement |
| FAIRVIEW RD from CAPITAL BLVD to BICKETT BLVD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | C; inferred | — | — | — | Curb and Gutter |
| FAIRVIEW RD from OBERLIN RD to CANTERBURY RD | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | Sidewalk Only |
| Falls Church Rd from Old Forge Cir to Treverton Pl | Sidewalks | Planning; City: PLANNED | A; inferred | — | — | — | — |
| Fenton St from Capital Blvd to Capital Blvd | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | Curb and Gutter |
| FORESTVILLE RD from 1/2 MILE SOUTH OF OLD MILBURNIE RD to OLD MILBURNIE RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| FORESTVILLE RD from BRINLEY MANOR DR to BUFFALOE RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | B; inferred | — | — | — | Major Street Improvement |
| FORESTVILLE RD from BUFFALOE RD to LANDOVER LN | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | B; inferred | — | — | — | Major Street Improvement |
| FORESTVILLE RD from LANDOVER LN to OLD WATKINS RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| FORESTVILLE RD from LOUISBURG RD to BRAEFIELD DR | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | B; inferred | — | — | — | Major Street Improvement |
| FORESTVILLE RD from OLD COUNTRY LN to OLD WATKINS RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | B; inferred | — | — | — | Major Street Improvement |
| FORESTVILLE RD from OLD MILBURNIE RD to BRINLEY MANOR DR | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| FORESTVILLE RD from SERENDIPITY DR to BRAEFIELD DR | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | B; inferred | — | — | — | Major Street Improvement |
| FORESTVILLE RD from SERENDIPITY DR to OLD COUNTRY LN | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | B; inferred | — | — | — | Major Street Improvement |
| FOX RD from JEFFREYS CREEK LN to BEAVERWOOD DR | Sidewalks | Planning; City: FUNDED | B; inferred | — | — | — | Curb and Gutter |
| FOX RD from JEFFREYS CREEK LN to LOUISBURG RD | Sidewalks | Planning; City: PLANNED | B; inferred | — | — | — | Major Street Improvement |
| FOX RD from OLD WAKE FOREST RD to SUMNER BLVD | Sidewalks | Planning; City: PLANNED | B; inferred | — | — | — | Major Street Improvement |
| FOX RD from SEGAL DR to TOWN DR | Sidewalks | Planning; City: PLANNED | B; inferred | — | — | — | Major Street Improvement |
| French Dr from Lead Mine Rd to Litchfield Downs Ln | Sidewalks | Planning; City: PLANNED | A; inferred | — | — | — | — |
| FRONT from INDUSTRIAL to N/A | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | E; inferred | — | — | — | — |
| Fuller St/ Grissom St/ Green St/ Prospect Ave from End of Fuller St to End of Green St | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | D; inferred | — | — | — | — |
| GARDNER ST from WADE AVE to VAN DYKE AVE | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | Sidewalk Only |
| GLEN EDEN DR from GLENWOOD AVE to BLUE RIDGE RD | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | Sidewalk Only |
| GLEN EDEN DR from GLENWOOD AVE to SUSSEX RD | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | Sidewalk Only |
| GLENWOOD AVE from BROOKHAVEN DR to CREEDMOOR RD | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | Sidewalk Only |
| GLENWOOD AVE from CREEDMOOR to LEAD MINE RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | E; inferred | — | — | — | Curb and Gutter |
| GLENWOOD AVE from FAIRHILL DR to MOREHEAD DR | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | E; inferred | — | — | — | Sidewalk Only |
| GLENWOOD AVE from GLEN EDEN DR to PASQUOTANK DR | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | E; inferred | — | — | — | Major Street Improvement |
| GLENWOOD AVE from MOREHEAD DR to CREEDMOOR RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | E; inferred | — | — | — | Sidewalk Only |
| GLENWOOD AVE from NATIONAL DR to LEAD MINE RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | A; inferred | — | — | — | Curb and Gutter |
| GLENWOOD AVE from OBERLIN RD to GLEN EDEN DR | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | E; inferred | — | — | — | Major Street Improvement |
| GLENWOOD AVE from PASQUOTANK DR to NATIONAL DR | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | E; inferred | — | — | — | Major Street Improvement |
| GLOBE RD from EMERALD CREEK DR to AVIATION PKWY | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | E; inferred | — | — | — | Major Street Improvement |
| GOLD STAR from DISTRICT to REEDY CREEK | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | D; inferred | — | — | — | Curb and Gutter |
| Granville Dr from Glenwood Ave to Transylvania Ave | Sidewalks | Planning; City: FUNDED | E; inferred | — | — | — | — |
| GRESHAM LAKE RD from CAPITAL HILLS DR to CAPITAL BLVD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| GRESHAM LAKE RD from ROWLAND RD to OVERLOOK RD | Sidewalks | Planning; City: PLANNED | B; inferred | — | — | — | Curb and Gutter |
| GRESHAM LAKE RD from ROWLAND RD to WELBORN ST | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| GRESHAM LAKE RD from WELBRON ST to CAPITAL HILLS DR | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | B; inferred | — | — | — | Major Street Improvement |
| Hadley Rd from Bailey Dr to Calloway Dr | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | — |
| HAMMOND RD from CHAPANOKE RD to TRYON RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | D; inferred | — | — | — | Sidewalk Only |
| HAMMOND RD from HOKE ST to I 40 | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | C; inferred | — | — | — | Curb and Gutter |
| HAMMOND RD from RUSH ST to CHAPANOKE RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | D; inferred | — | — | — | Sidewalk Only |
| HAMMOND RD from RUSH ST to I-40 | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | D; inferred | — | — | — | Sidewalk Only |
| HAMMOND RD from TRYON RD to MECHANICAL BLVD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | D; inferred | — | — | — | Sidewalk Only |
| Hamrick Dr from Lodestar Dr to Bridgeport Dr | Sidewalks | Planning; City: PLANNED | A; inferred | — | — | — | — |
| HARGROVE RD from SPRING FOREST to E MILLBROOK | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | B; inferred | — | — | — | Sidewalk Only |
| Harrington St from W North St to W Lane St | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | Sidewalk Only |
| Havenwood Dr/ Pilgrim Rd from Beaverwood Dr to US 401 | Sidewalks | Planning; City: PLANNED | B; inferred | — | — | — | — |
| HICKORY GROVE CHURCH RD from LEESVILLE RD to BRADWELL CT | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | E; inferred | — | — | — | Major Street Improvement |
| HICKORY GROVE RD from CARPENTER POND RD to BRADWELL CT | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| HILBURN DR from GLENWOOD AVE to LYNN RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | E; inferred | — | — | — | Sidewalk Only |
| Hill St from Oakwood Ave to New Bern Ave | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | — |
| HILLSBOROUGH ST from BURTON AVE to WOLF GREEN DR | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | D; inferred | — | — | — | Major Street Improvement |
| HILLSBOROUGH ST from BURTON to JONES FRANKLIN | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | Curb and Gutter |
| HILLSBOROUGH ST from HILLSBOROUGH ST TO I 440 RAMP to BLUE RIDGE RD | Sidewalks | Planning; City: PLANNED | — | — | — | — | Major Street Improvement |
| HILLSBOROUGH ST from WOLF GREEN DR to I 40 | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | D; inferred | — | — | — | Major Street Improvement |
| HODGES from ATLANTIC to LAURELBROOK | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | C; inferred | — | — | — | — |
| HODGES from LAURELBROOK to CAPITAL | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | C; inferred | — | — | — | — |
| HODGES from WAKE FOREST to ATLANTIC | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | Curb and Gutter |
| Hoke St from S Person St to Garner Rd | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | — |
| HONEYCUTT from FALLS OF NEUSE to CLEAR CREEK FARM | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | — |
| HOWARD RD from CREEDMOOR RD to RAY RD | Sidewalks | Planning; City: PLANNED | — | — | — | — | Major Street Improvement |
| ILEAGNES RD from S SAUNDERS ST to S WILMINGTON ST | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | D; inferred | — | — | — | Sidewalk Only |
| INDUSTRIAL from CREEKSIDE to E SIX FORKS | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | E; inferred | — | — | — | — |
| INDUSTRIAL from E SIX FORKS to FRONT | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | E; inferred | — | — | — | — |
| Jackson St from Method Rd to Whitmore Dr | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | — |
| Jeffreys Grove School Rd from Eddystone Dr to Creedmoor Rd | Sidewalks | Planning; City: PLANNED | — | — | — | — | — |
| JONES FRANKLIN RD from ATHENS DR to HUNT CLUB LN | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | Major Street Improvement |
| JONES FRANKLIN RD from FORT SUMTER RD to ATHENS DR | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | Major Street Improvement |
| JONES FRANKLIN RD from I 40 to TRYON RD | Sidewalks | Planning; City: PLANNED | — | — | — | — | Major Street Improvement |
| Kelford Street from Gorman St to Stovall Dr | Sidewalks | Planning; City: FUNDED | D; inferred | — | — | — | — |
| KIDD from DONALD ROSS to SWINBURNE | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | C; inferred | — | — | — | — |
| KYLE DR from LOUISBURG RD to VALLEY STREAM DR | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | B; inferred | — | — | — | Major Street Improvement |
| LAKE BOONE TRL from DIXIE TRL to BROOKS AVE | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | Curb and Gutter |
| LAKE DAM RD from AVENT FERRY RD to GREENWAY XING | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | Curb and Gutter |
| LAKE DAM RD from GREENWAY XING to TRYON RD | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | Curb and Gutter |
| LAKE WHEELER from CENTENNIAL to KIRKLAND | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | D; inferred | — | — | — | Curb and Gutter |
| LAKE WHEELER from KIRKLAND to TRYON | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | Major Street Improvement |
| Lake Woodard Dr from Brentwood Rd to Timberlake Rd | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | — |
| Lakemont Dr/ Pinecroft Dr/ Sweetbriar Dr from E Rowan St to E Millbrook Rd | Sidewalks | Planning; City: PLANNED | A; inferred | — | — | — | — |
| Landor Rd/ W Drewry Ln/ E Drewry Ln from Marlowe Rd to Anderson Dr | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | — |
| LAUREL HILLS RD from EDWARDS MILL RD NORTH END to EDWARDS MILL RD SOUTH END | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | Curb and Gutter |
| LEAD MINE RD from CHARLES DR to TOWN AND COUNTRY RD | Sidewalks | Planning; City: PLANNED | A; inferred | — | — | — | Sidewalk Only |
| LEAD MINE RD from CHARLES to INMAN PARK DR | Sidewalks | Planning; City: FUNDED | A; inferred | — | — | — | Sidewalk Only |
| LEAD MINE RD from LYNN RD to SAWMILL RD | Sidewalks | Planning; City: PLANNED | A; inferred | — | — | — | Major Street Improvement |
| LEAD MINE RD from MILLBROOK RD to LYNN RD | Sidewalks | Planning; City: PLANNED | A; inferred | — | — | — | Major Street Improvement |
| LEAD MINE RD from TOWN AND COUNTRY RD to SAWMILL RD | Sidewalks | Planning; City: PLANNED | A; inferred | — | — | — | Major Street Improvement |
| LEESVILLE from HICKORY GROVE CHURCH to SYCAMORE | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | Major Street Improvement |
| LEESVILLE from I-540 WB Ramps to I-540 EB Ramps | Sidewalks | Planning; City: PLANNED | — | — | — | — | Sidewalk Only |
| LEESVILLE from SYCAMORE RD to MOUNT HERMAN | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | — |
| LEESVILLE RD from FAIRBANKS DR to STRICKLAND RD | Sidewalks | Planning; City: PLANNED | — | — | — | — | Major Street Improvement |
| LEESVILLE RD from FAIRBANKS RD to COUNTRY TRL | Sidewalks | Planning; City: PLANNED | — | — | — | — | Major Street Improvement |
| LEESVILLE RD from LYNN RD to COUNTRY TRL | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | Major Street Improvement |
| Lewis Farm Rd from Ridge Rd to Brooks Ave | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | — |
| LIGON ST from METHOD RD to ATWATER ST | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | Curb and Gutter |
| LITCHFORD RD from HARPS MILL RD to HUNTING RIDGE RD | Sidewalks | Planning; City: PLANNED | — | — | — | — | Major Street Improvement |
| LITCHFORD RD from OLD WAKE FOREST RD to FALLS OF NEUSE RD | Sidewalks | Planning; City: PLANNED | B; inferred | — | — | — | Major Street Improvement |
| LITCHFORD RD from OLD WAKE FOREST RD to HUNTING RIDGE RD | Sidewalks | Planning; City: PLANNED | A; inferred | — | — | — | Major Street Improvement |
| Lodestar Dr/ Snow Wind Dr from Murray Hill Dr to Windjammer dr | Sidewalks | Planning; City: PLANNED | A; inferred | — | — | — | — |
| LOUISBURG RD from 500 FEET WEST OF LELAND DR to FORESTVILLE RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| LOUISBURG RD from FORESTVILLE RD to LILLIE LILES RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| LOUISBURG RD from LOWELL RIDGE RD to 500 FEET WEST OF LELAND DR | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| LOUISBURG RD from MITCHELL MILL RD to LOWELL RIDGE RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| LOUISBURG RD from MITCHELL MILL RD to PERRY CREEK RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | B; inferred | — | — | — | Major Street Improvement |
| LOUISBURY RD from GEAR BOX DR to 300 FEET SOUTH OF HEAVEN BOUND ST | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| LOUISBURY RD from GEAR BOX DR to 300 FEET SOUTH OF HEAVEN BOUND ST | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| LUTHER RD from NEW BERN AVE to FALSTAFF RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | C; inferred | — | — | — | Curb and Gutter |
| LUTHER RD from NEW BERN AVE to FALSTAFF RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | C; inferred | — | — | — | Curb and Gutter |
| LYNN RD from MADISON RIDGE WAY to PLEASANT PINES DR | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | Sidewalk Only |
| MAITLAND from BASTION to NEW BERN AVE | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | Sidewalk Only |
| Manchester Dr from Inglewood Ln to Wimbleton Dr | Sidewalks | Planning; City: PLANNED | A; inferred | — | — | — | — |
| Marcom Street from Gorman St to Stovall Dr | Sidewalks | Planning; City: FUNDED | D; inferred | — | — | — | — |
| Marlowe Rd from Lassiter Mill Rd to Landor Rd | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | — |
| Marlowe Rd from Yadkin Dr to Old Lassiter Mill Rd | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | — |
| Maywood Ave from S Saunders St to Fayetteville St | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | — |
| Memory Rd from Sunbow Falls Ln to E Millbrook Rd | Sidewalks | Planning; City: PLANNED | A; inferred | — | — | — | — |
| MILBURNIE from NEW BERN AVE to N PEARTREE | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | C; inferred | — | — | — | — |
| MITCHELL MILL RD from FORESTVILLE RD to WATKINS RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| MITCHELL MILL RD from WATKINS RD to 750 FEET EAST OF MEDLIN WOODS RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| Morgans Way from Creedmoor Rd to Hamrick Dr | Sidewalks | Planning; City: PLANNED | A; inferred | — | — | — | — |
| N Boundary St/ Watauga St from Person St to Oakwood Ave | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | — |
| N Harrington St from W North St to W Lane St | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | Curb and Gutter |
| N HILLS DR from LEAD MINE RD to HILLOCK DR | Sidewalks | Planning; City: FUNDED | A; inferred | — | — | — | Sidewalk Only |
| N PEARTREE LN from NEW BERN AVE to MILBURNIE RD | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | Sidewalk Only |
| N WEST ST from Tucker St to W Johnson St | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | D; inferred | — | — | — | Sidewalk Only |
| N WEST ST from W Peace St to Wade Ave | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | D; inferred | — | — | — | Sidewalk Only |
| Neuse Crossing Dr from Mitchell Mill Rd to Suncrest Village Ln | Sidewalks | Planning; City: PLANNED | B; inferred | — | — | — | — |
| NEW BERN AVE from N ROGERS LN to OLD MILBURNIE RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | C; inferred | — | — | — | Major Street Improvement |
| NEW BERN AVE from N ROGERS LN to PARTIN RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | C; inferred | — | — | — | Major Street Improvement |
| NEW BERN AVE from TRAWICK RD to SHANTA DR | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | C; inferred | — | — | — | Major Street Improvement |
| Norris St from Frank St to Glascock St | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | Curb and Gutter |
| Norton Ln from Fox Rd to Botany Bay Dr | Sidewalks | Planning; City: PLANNED | B; inferred | — | — | — | — |
| NOWELL RD from TRINITY RD to CHAPEL HILL RD | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | Major Street Improvement |
| NOWELL RD from TRINITY RD to HILLSBOROUGH ST | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | D; inferred | — | — | — | Curb and Gutter |
| OAK FOREST DR from CAPITAL BLVD to 600' EAST OF MELVILLE ROAD | Sidewalks | Planning; City: PLANNED | B; inferred | — | — | — | Sidewalk Only |
| OAK FOREST DR from CAPITAL BLVD to OLD WAKE FOREST RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | A; inferred | — | — | — | Major Street Improvement |
| Oak Forest Dr from Tanglewood Dr to Capital Blvd | Sidewalks | Planning; City: PLANNED | A; inferred | — | — | — | Curb and Gutter |
| OLD BUFFALOE RD from BUFFALOE RD to CAPITAL BLVD | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | Curb and Gutter |
| OLD FALLS OF NEUSE from MOUNTAIN HIGH RD to OLD NC 98 | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | B; inferred | — | — | — | Curb and Gutter |
| OLD FALLS OF NEUSE from OLD NC 98 to NC 98 | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | B; inferred | — | — | — | Curb and Gutter |
| OLD LEAD MINE RD from FORUM DR to LEAD MINE RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | A; inferred | — | — | — | Curb and Gutter |
| OLD MILBURNIE RD from BLACKARD POND RD to BUFFALOE RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| OLD MILBURNIE RD from FORESTVILLE RD to OLD LEWIS FARM RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| OLD MILBURNIE RD from KNIGHTDALE BLVD to PENSELWOOD DR | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| OLD MILBURNIE RD from LEGACY OAKS DR/HONEY IVY LN to TARHEEL CLUB RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| OLD MILBURNIE RD from OLD LEWIS FARM RD to BLACKARD POND RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| OLD MILBURNIE RD from OLD LEWIS FARM RD to LIZEI ST | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| OLD MILBURNIE RD from PENSELWOOD DR to LEGACY OAKS DR/HONEY IVY LN | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | B; inferred | — | — | — | Major Street Improvement |
| OLD MILBURNIE RD from TARHEEL CLUB RD to FORESTVILLE RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | B; inferred | — | — | — | Major Street Improvement |
| OLD POOLE RD from POOLE RD to STONE MANOR DR | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Curb and Gutter |
| OLD WAKE FOREST RD from ATLANTIC AVE to E MILLBROOK RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| OLD WAKE FOREST RD from E MILLBROOK RD to ATLANTIC AVE | Sidewalks | Planning; City: PLANNED | A; inferred | — | — | — | Major Street Improvement |
| Pasquotank Dr/ Transylvania Ave/ Rutherford Dr from Glenwood Ave to Beaufort St | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | — |
| PEARL RD from ADVANTIS DR to ROCK QUARRY RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | C; inferred | — | — | — | Major Street Improvement |
| PEARL RD from CAMELOT VILLAGE AVE to BRAMBLETON AVE | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| PEARL RD from ROCK QUARRY RD to CAMELOT VILLAGE AVE | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| PECAN RD from SAUNDERS ST to WILMINGTON ST | Sidewalks | Planning; City: FUNDED | D; inferred | — | — | — | Sidewalk Only |
| PERRY CREEK RD from LOUISBURG RD to FOX RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | B; inferred | — | — | — | Major Street Improvement |
| Petyon St from Ellerbe Ln to End | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | — |
| PINECREST RD from COUNTRY TRL to FAIRBANKS DR | Sidewalks | Planning; City: PLANNED | — | — | — | — | Major Street Improvement |
| PINECREST RD from GLENWOOD AVE to COUNTRY TRL | Sidewalks | Planning; City: PLANNED | — | — | — | — | Curb and Gutter |
| Pleasant Grove Church Rd from Pleasant Pines Dr to W Millbrook Rd | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | — |
| Pleasant Pines Dr/ Hilburn Hills Ln from Lynn Rd to Davis Cir | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | — |
| PLEASANT VALLEY RD from GLENWOOD AVE to W MILLBROOK RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | E; inferred | — | — | — | Sidewalk Only |
| PLEASANT VALLEY RD from RIESE DR to W MILLBROOK RD | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | Sidewalk Only |
| POWELL DR from WESTERN BLVD to HILLSBOROUGH ST | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | Curb and Gutter |
| POWELL from HUNTINGDON to WESTERN | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | Sidewalk Only |
| PRINCE DR from JONES FRANKLIN RD to TRYON RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | D; inferred | — | — | — | Curb and Gutter |
| PYLON from BLUE RIDGE to BERYL | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | Sidewalk Only |
| RAVEN RIDGE RD from FALLS OF NEUSE RD to SAVANNAH OAKS WAY | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| RAY RD from Andrea Ln to STRICKLAND RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | A; inferred | — | — | — | Major Street Improvement |
| RAY RD from HOWARD RD to Andrea Ln | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | A; inferred | — | — | — | Major Street Improvement |
| RAY RD from LYNN RD to HOWARD RD | Sidewalks | Planning; City: PLANNED | A; inferred | — | — | — | Major Street Improvement |
| RAY RD from LYNN RD to LEESVILLE RD | Sidewalks | Planning; City: PLANNED | A; inferred | — | — | — | Major Street Improvement |
| Rembert Dr - B from Winthrop Dr to Brookhaven Dr | Sidewalks | Planning; City: FUNDED | E; inferred | — | — | — | — |
| Rembert Dr/ Winthrop Dr from Glenwood Ave to Sleepy Hollow Dr | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | — |
| ROCK QUARRY RD from BARWELL RD to KASOTA LN | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| ROCK QUARRY RD from BARWELL RD to WHITFIELD RD | Sidewalks | Planning; City: PLANNED | — | — | — | — | Major Street Improvement |
| ROCK QUARRY RD from KASOTA LN to JONES SAUSAGE RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| Rose Ln from Poole Rd to Little John Rd | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | — |
| S East St from Hoke St to MLK Jr Blvd | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | — |
| S NEW HOPE RD from EVA MAE DR to OLD POOLE RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| S NEW HOPE RD from ROCK QUARRY RD to WALNUT CREEK | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | C; inferred | — | — | — | Major Street Improvement |
| S NEW HOPE RD from WALNUT CREEK to EVA MAE DR | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| S SAUNDERS ST from LAKE WHEELER RD to S DAWSON ST | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | D; inferred | — | — | — | Sidewalk Only |
| S State St from E Lenoir St to MLK Jr Blvd | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | — |
| S WILMINGTON SERVICE RD from CHAPANOKE RD to TRYON RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | D; inferred | — | — | — | Curb and Gutter |
| S WILMINGTON SERVICE RD from TRYON RD to MECHANICAL BLVD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | D; inferred | — | — | — | Curb and Gutter |
| S WILMINGTON ST from CHAPANOKE RD to TRYON RD | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | Sidewalk Only |
| S Wilmington St from Rush St to Chapanoke Rd | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | D; inferred | — | — | — | Sidewalk Only |
| SANDERFORD RD from CREECH RD to GRIFFIN CIR | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | C; inferred | — | — | — | Major Street Improvement |
| SAWMILL RD from PROSPECTOR PL to NORTHWAY CT | Sidewalks | Planning; City: PLANNED | A; inferred | — | — | — | Sidewalk Only |
| Scott Dr/ Donna Rd from End to N New Hope Rd | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | — |
| Seabrook Rd from Cross Link Rd to Quince Dr | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | — |
| SHADY GROVE-MOUNT HERMAN from ACC BLVD to LEESVILLE RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | E; inferred | — | — | — | — |
| SHANTA from MILBURNIE to NEW BERN AVE | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | C; inferred | — | — | — | — |
| Singleleaf Ln from Neuse Crossing Dr to Mitchell Mill Rd | Sidewalks | Planning; City: PLANNED | B; inferred | — | — | — | — |
| SKYCREST DR from BRENTWOOD RD to TRAWICK RD | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | Major Street Improvement |
| SOUTHALL RD from HEATHERFIELD WAY to STILLMEADOW RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| SOUTHALL RD from SKYCREST DR to HEATHERFIELD WAY | Sidewalks | Planning; City: PLANNED | — | — | — | — | Major Street Improvement |
| SOUTHALL RD from STILLMEADOW RD to BUFFALOE RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| Southgate Dr/ Proctor Rd from Rock Quarry Rd to Red Quartz Dr | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | — |
| SPRING FOREST RD from LOUISBURG RD to FOX RD | Sidewalks | Planning; City: PLANNED | — | — | — | — | Major Street Improvement |
| ST ALBANS DR from WAKE FOREST RD to NEW HOPE CHURCH RD | Sidewalks | Planning; City: PLANNED | A; inferred | — | — | — | Major Street Improvement |
| St James Church Rd from US 401 to Sue Ellen Dr | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | — |
| St Marys St from Hargett St to Hillsborough St | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | Sidewalk Only |
| Starmount Dr/ Baugh St from US 1 to Buffaloe Rd | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | — |
| State St from E Jones St to Oakwood Ave | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | — |
| STRICKLAND RD from LEESVILLE RD to RAY RD | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | Major Street Improvement |
| STRICKLAND RD from RAY RD to CREEDMOOR RD | Sidewalks | Planning; City: PLANNED | — | — | — | — | Major Street Improvement |
| SUNNYBROOK RD from WOODMEADOW PKWY to ROCK QUARRY RD | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | Major Street Improvement |
| SUNNYBROOK RD from WOODMEADOW PKWY to ROCK QUARRY RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| SUNNYBROOK RD from WOODMEADOW PKWY to ROCK QUARRY RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | C; inferred | — | — | — | Major Street Improvement |
| TARHEEL from SAINT ALBANS to HIGHWOODS | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | A; inferred | — | — | — | — |
| THORNTON RD from WILD WOOD FOREST DR to 1200' EAST OF WILD WOOD FOREST DR | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| Timber Dr from Dennis Ave to Crabtree Blvd | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | — |
| TOWN AND COUNTRY RD from W MILLBROOK RD to LEAD MINE RD | Sidewalks | Planning; City: PLANNED | A; inferred | — | — | — | Major Street Improvement |
| TRAILWOOD DR from S OF AVENT FERRY RD to AVENT FERRY RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | D; inferred | — | — | — | Major Street Improvement |
| TRAILWOOD DR from S OF CRUMP RD to S OF AVENT FERRY RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| TRAWICK RD from NEW BERN AVE to SKYCREST DR | Sidewalks | Planning; City: PLANNED | — | — | — | — | Major Street Improvement |
| TRAWICK RD from SKYCREST DR to MARSH CREEK RD | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | Major Street Improvement |
| TRIANGLE TOWN BLVD from TOWN CENTER DR to I 540 | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | B; inferred | — | — | — | Sidewalk Only |
| TRINITY RD from I 40 to NOWELL RD | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | Major Street Improvement |
| TRYON RD from BRISK GALLOP WAY to GORMAN ST | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | D; inferred | — | — | — | Sidewalk Only |
| TRYON RD from DILLARD DR to BRISK GALLOP WAY | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Sidewalk Only |
| TRYON RD from GARNER RD to DURHAM DR | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | D; inferred | — | — | — | Sidewalk Only |
| Turnbridge Dr from Bellevue Rd to Bellevue Rd | Sidewalks | Planning; City: FUNDED | E; inferred | — | — | — | — |
| Valley Forge Dr from Valley Dr to Lynn Rd | Sidewalks | Planning; City: PLANNED | A; inferred | — | — | — | — |
| W MILLBROOK RD from LEESVILLE RD to STILL PINES DR | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | Sidewalk Only |
| W MILLBROOK RD from PONDEROSA RD to LEESVILLE RD | Sidewalks | Planning; City: PLANNED | A; inferred | — | — | — | Sidewalk Only |
| WADE AVE from GLENWOOD AVE to DANIELS ST | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | Major Street Improvement |
| WAKE FOREST RD from MIMOSA ST to LOUISBURG RD | Sidewalks | Planning; City: PLANNED | C; inferred | — | — | — | Sidewalk Only |
| WATKINS RD from MITCHELL MILL RD to WATKINS TOWN RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| Weaver Dr/ Oak Park Rd from Duraleigh Rd to Glenwood Ave | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | — |
| Westborough Dr from Brumbley Pl to Glenwood Ave | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | — |
| WESTCHASE from WEST OF BLUE RIDGE to CARTER FINLEY | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Sidewalk Only |
| WESTERN BLVD from BURTON AVE to JONES FRANKLIN RD | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | Curb and Gutter |
| WESTINGHOUSE BLVD from CAPITAL BLVD to N RALEIGH BLVD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | C; inferred | — | — | — | Sidewalk Only |
| White Oak Rd from Anderson Rd to Alexander Rd | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | — |
| White Oak Rd from St Marys St to Anderson Dr | Sidewalks | Planning; City: PLANNED | E; inferred | — | — | — | — |
| WHITFIELD RD from BATTLE BRIDGE RD to ROCK QUARRY RD | Sidewalks | Planning; City: PLANNED - REDEVELOPMENT | — | — | — | — | Major Street Improvement |
| Wild Dunes Dr from Eagle Trace Dr to Harbour Towne dr | Sidewalks | Planning; City: PLANNED | B; inferred | — | — | — | — |
| WILD WOOD FOREST DR from SANDY BANKS RD to WADFORD DR | Sidewalks | Planning; City: PLANNED | B; inferred | — | — | — | Sidewalk Only |
| Windjammer Dr from Bridgeport Dr to Strickland Rd | Sidewalks | Planning; City: PLANNED | A; inferred | — | — | — | — |
| Winthrop Dr from Hayden Ct to W Millbrook Rd | Sidewalks | Planning; City: PLANNED | A; inferred | — | — | — | — |
| Woods Pl/ Royal St from Method Rd to Hillsborough St | Sidewalks | Planning; City: PLANNED | D; inferred | — | — | — | — |
| YOUTH CENTER DR from HILLSBOROUGH ST to TRINITY RD | Sidewalks | Planning; City: PLANNED | — | — | — | — | Curb and Gutter |
| Battleford Dr - S from LYNN RD to PONDEROSA RD | Traffic calming | Planning; City: Eligible Projects | A | — | — | — | — |
| Bedfordtown Dr from Falls River Ave to Falls River Ave | Traffic calming | Planning; City: Eligible Projects | B | — | — | — | — |
| Big Sandy Dr from Haines Creek Ln to Clarks Fork Dr | Traffic calming | Planning; City: Eligible Projects | B | — | — | — | — |
| Bivens Dr from Fox Rd to Sinclair Dr | Traffic calming | Planning; City: Eligible Projects | B; inferred | — | — | — | — |
| Bland Rd from Wake Forest Rd to St Albans Rd | Traffic calming | Planning; City: Eligible Projects | A | — | — | — | — |
| Bluffridge Dr from Bridgeport Dr to Sawmill Rd | Traffic calming | Planning; City: Eligible Projects | A | — | — | — | — |
| Brambleton Ave from Pearl Rd to Laurel Glen Dr | Traffic calming | Planning; City: Eligible Projects | C | — | — | — | — |
| Canterbury Rd from Wade Ave to Cambridge Rd | Traffic calming | Planning; City: Eligible Projects | E | — | — | — | — |
| Cedarhurst Dr from Falls of Neuse Rd to Quail Hollow Dr | Traffic calming | Planning; City: Eligible Projects | A | — | — | — | — |
| Churchill Rd - E from Banbury Rd to Chester Rd | Traffic calming | Planning; City: Eligible Projects | E | — | — | — | — |
| Churchill Rd - W from Ridge Rd to Dixie Trl | Traffic calming | Planning; City: Eligible Projects | E; inferred | — | — | — | — |
| Converse Dr from Compton Rd to Hardimont Rd | Traffic calming | Planning; City: Eligible Projects | A | — | — | — | — |
| Country Trl from Pinecrest Rd to Marvino Ln | Traffic calming | Planning; City: Eligible Projects | E | — | — | — | — |
| Coxindale Rd - W from Falls Valley Rd to Litchford Rd | Traffic calming | Planning; City: Eligible Projects | A | — | — | — | — |
| Cub Trl from Durant Rd to Hiking Trl | Traffic calming | Planning; City: Eligible Projects | B | — | — | — | — |
| Cyrus St from Ujamaa Dr to Burtons Barn St | Traffic calming | Planning; City: Eligible Projects | C; inferred | — | — | — | — |
| Dartmouth Rd - E from Windsor Pl to Converse Dr | Traffic calming | Planning; City: Eligible Projects | A | — | — | — | — |
| Dominion Blvd from Cape Charles Dr to Leesville Rd | Traffic calming | Planning; City: Eligible Projects | E | — | — | — | — |
| Drewry Ln from Anderson Dr to Landor Rd | Traffic calming | Planning; City: Eligible Projects | E | — | — | — | — |
| E Hargett St from S East St to S Tarboro Rd | Traffic calming | Planning; City: Eligible Projects | C | — | — | — | — |
| Easthampton Dr from Southall Rd to N New Hope Rd | Traffic calming | Planning; City: Eligible Projects | C | — | — | — | — |
| Falls River Ave - 4 from Dunn Rd Traffic Circle to Bedfordtown Dr | Traffic calming | Planning; City: Eligible Projects | B | — | — | — | — |
| Falls River Ave - 6 from Bedfordtown Dr to St Pauls Sq | Traffic calming | Planning; City: Eligible Projects | B | — | — | — | — |
| Farm Gate Rd from Western Blvd to Buck Jones Rd | Traffic calming | Planning; City: Eligible Projects | D | — | — | — | — |
| Finley Ridge Ln from Morrocroft Dr to Cub Trl | Traffic calming | Planning; City: Eligible Projects | B | — | — | — | — |
| Fox Hollow Dr from Sanderford Rd to Creech Rd | Traffic calming | Planning; City: Eligible Projects | C | — | — | — | — |
| Glen Burnie Dr from Wycliff Rd to Morningside Dr | Traffic calming | Planning; City: Eligible Projects | E | — | — | — | — |
| Glendower Rd - M from Leesville Rd to Lynn Rd | Traffic calming | Planning; City: Eligible Projects | E; inferred | — | — | — | — |
| Glendower Rd - N from Leesville Rd to Tylerton St | Traffic calming | Planning; City: Eligible Projects | E | — | — | — | — |
| Grant Ave from Canterbury Rd to Chester Rd | Traffic calming | Planning; City: Eligible Projects | E | — | — | — | — |
| Halifax St from Peace St to Cedar St | Traffic calming | Planning; City: Eligible Projects | C; inferred | — | — | — | — |
| Hiking Trl from Halfhitch Trl to Tenderfoot Trl | Traffic calming | Planning; City: Eligible Projects | B | — | — | — | — |
| Hollyridge Dr from Glenwood Ave to Oak Park Dr | Traffic calming | Planning; City: Eligible Projects | E | — | — | — | — |
| Hopper St from Forestville Rd to Pinkham Way | Traffic calming | Planning; City: Eligible Projects | B | — | — | — | — |
| Horseback Ln from Arsenal Dr to Offshore Dr | Traffic calming | Planning; City: Eligible Projects | C | — | — | — | — |
| Hoyle Dr from Brockton Dr to E Millbrook Rd | Traffic calming | Planning; City: Eligible Projects | A | — | — | — | — |
| Hunting Ridge Rd - W from Falls of Neuse Rd to Lone Oak Pl | Traffic calming | Planning; City: Eligible Projects | A | — | — | — | — |
| Idlewood Village Dr from Sanderford Rd to End | Traffic calming | Planning; City: Eligible Projects | C | — | — | — | — |
| Kilcullen Dr - W from Hoyle Dr to Green Rd | Traffic calming | Planning; City: Eligible Projects | A | — | — | — | — |
| Leslieshire Dr from Hawksmoor Dr to Durant Rd | Traffic calming | Planning; City: Eligible Projects | B | — | — | — | — |
| Lewis Farm Rd - W from Ridge Rd to Banbury Rd | Traffic calming | Planning; City: Eligible Projects | E | — | — | — | — |
| Massey Preserve Trl from Cashew Dr to Forestville Rd | Traffic calming | Planning; City: Eligible Projects | B | — | — | — | — |
| McMakin St from Garner Rd to End | Traffic calming | Planning; City: Eligible Projects | C | — | — | — | — |
| Mellow Field Dr from E Six Forks Rd to Ratchford Dr | Traffic calming | Planning; City: Eligible Projects | C | — | — | — | — |
| Monument Ln from Old Lead Mine Rd to Six Forks Rd | Traffic calming | Planning; City: Eligible Projects | A | — | — | — | — |
| N Radner Way - N from New Leesville Blvd to Harrington Grove Dr | Traffic calming | Planning; City: Eligible Projects | E; inferred | — | — | — | — |
| Neuse Wood Dr from Wild Wood Forest Dr to Big Sandy Dr | Traffic calming | Planning; City: Eligible Projects | B | — | — | — | — |
| Offshore Dr from Battle Bridge Rd to Resting Grove Rd | Traffic calming | Planning; City: Eligible Projects | C | — | — | — | — |
| Old Deer Trl from N of Old Well Ln to Mourning Dove Rd | Traffic calming | Planning; City: Eligible Projects | A | — | — | — | — |
| Old Farm Rd from Bashford Rd to Buck Jones Rd | Traffic calming | Planning; City: Eligible Projects | D | — | — | — | — |
| Peyton St from Belmont Dr to Martin Luther King Jr Blvd | Traffic calming | Planning; City: Eligible Projects | C | — | — | — | — |
| Pike Rd from Hilburn Dr to Leesville Rd | Traffic calming | Planning; City: Eligible Projects | E | — | — | — | — |
| Pinecroft Dr from Lakemont St to Latimer Rd | Traffic calming | Planning; City: Eligible Projects | A | — | — | — | — |
| Quail Hollow Dr from E Millbrook Rd to Hardimont Rd | Traffic calming | Planning; City: Eligible Projects | A | — | — | — | — |
| Quitman Trl - E from Marshlane Way to Mackinac Island Ln | Traffic calming | Planning; City: Eligible Projects | C | — | — | — | — |
| Rainwater Rd - S from Spring Forest Rd to Hunting Ridge Rd | Traffic calming | Planning; City: Eligible Projects | A | — | — | — | — |
| Running Cedar Trl from Old Deer Trl to Strickland Rd | Traffic calming | Planning; City: Eligible Projects | A | — | — | — | — |
| Sporting Club Dr from Arnold Palmer Dr to TW Alexander Dr | Traffic calming | Planning; City: Eligible Projects | E | — | — | — | — |
| Stony Moss Dr/Samuel St from Sungate Blvd to Bridgeville Rd | Traffic calming | Planning; City: Eligible Projects | C | — | — | — | — |
| Summerton Dr from Falls River Ave to Whittington Dr | Traffic calming | Planning; City: Eligible Projects | B | — | — | — | — |
| Tanbark Way from Harps Mill Rd to Hunting Ridge Rd | Traffic calming | Planning; City: Eligible Projects | A | — | — | — | — |
| Tanglewood Pine Ln from Old Poole Rd to Kavkaz St | Traffic calming | Planning; City: Eligible Projects | C | — | — | — | — |
| Thoughtful Spot Way from Falls River Ave to Wake Bluff Dr | Traffic calming | Planning; City: Eligible Projects | B | — | — | — | — |
| Timber Ridge Dr from Spring Forest Rd to Forest Oaks Dr | Traffic calming | Planning; City: Eligible Projects | A | — | — | — | — |
| Tylerton Dr from Leesville Rd to Grayson Ridge Ct | Traffic calming | Planning; City: Eligible Projects | E | — | — | — | — |
| Valley Dr from Sawmill Rd to Lynn Rd | Traffic calming | Planning; City: Eligible Projects | A | — | — | — | — |
| Weaver Dr from Duraleigh Rd to Oak Park Dr | Traffic calming | Planning; City: Eligible Projects | E | — | — | — | — |
| Westbrook Dr from Six Forks Rd to Brookhollow Dr | Traffic calming | Planning; City: Eligible Projects | A | — | — | — | — |
| Wild Dunes Dr from Eagle Trace Dr to Harbor Towne Dr | Traffic calming | Planning; City: Eligible Projects | B | — | — | — | — |
| Wilderness Rd from Ray Rd to Lynn Rd | Traffic calming | Planning; City: Eligible Projects | A | — | — | — | — |
| Windel Dr from Six Forks Rd to Farley Dr | Traffic calming | Planning; City: Eligible Projects | A | — | — | — | — |
| Winthrop Dr - S from W Millbrook Rd to Rembert Dr | Traffic calming | Planning; City: Eligible Projects | E | — | — | — | — |
| Woodmeadow Pkwy - S from Sunnybrook Dr to End | Traffic calming | Planning; City: Eligible Projects | C | — | — | — | — |
| Woods Ream Dr from Six Forks Rd to Sandy Forks Rd | Traffic calming | Planning; City: Eligible Projects | A | — | — | — | — |
| Yadkin Dr - M from Northbrook Dr to Currituck Dr | Traffic calming | Planning; City: Eligible Projects | A | — | — | — | — |
| Yadkin Dr - S from Alamance Dr to Currituck Dr | Traffic calming | Planning; City: Eligible Projects | A, E | — | — | — | — |
| Yucca Trl from Hiking Trl to Coxingdale Dr | Traffic calming | Planning; City: Eligible Projects | B | — | — | — | — |
| [Biltmore Hills (Crosslink Master Plan)](https://raleighnc.gov/projects/biltmore-hills-park-master-plan-update) | Parks and greenways | Planning | C; inferred | PRCR Parks | Emma Liles | — | Update to Biltmore Hills Park including integration of the crosslink property |
| Pigeon House Branch Trail | Parks and greenways | Planning; City: Preliminary Planning | C; inferred | Transportation - PRCR | — | — | — |

## How to read this list

- Completed and closed projects are left out. By program, these statuses are left out: Capital improvement projects: complete, closed, unknown, no status. Vision Zero safety: Completed, Removed. Sidewalks: COMPLETE, COMPLETE - ONE SIDE, EXISTING, REMOVED. Traffic calming: complete, failed. Parks and greenways: Not funded, no status. Housing bond: Complete.
- District is the council district the City records on the project. Where it records none, the district is inferred from the project's point and marked inferred (656 projects).
- Only the housing bond list publishes money: the bond funds the City has committed. The other lists publish no budget, so they show a dash.

---

A dash (—) means the City does not publish that field, never zero. "Inferred" marks a value this site worked out, such as a council district placed from a location. This is the markdown twin of https://raleigh-projects.pages.dev/capital-projects. Every page and data file is listed in https://raleigh-projects.pages.dev/llms.txt.